X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-36564"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36564
 
| Well ID: 37-063-36564
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.432058, -79.093991 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.432058, -79.093991 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 10/30/2009
+
| Spud Date: 2009-10-30
 
|-
 
|-
| Permit Date: 6/10/2009
+
| Permit Date: 2009-06-10
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 276
 
| style="text-align: right;" | 276
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 156: Line 181:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 65.00 Bbl
 
| style="text-align: right;" | 65.00 Bbl
Line 162: Line 187:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
Line 187: Line 212:
 
| 1840922
 
| 1840922
 
| Primary Facility
 
| Primary Facility
| 11/04/2009
+
| 2009-11-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 194: Line 219:
 
| 1840923
 
| 1840923
 
| Primary Facility
 
| Primary Facility
| 11/04/2009
+
| 2009-11-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 201: Line 226:
 
| 1842219
 
| 1842219
 
| Primary Facility
 
| Primary Facility
| 11/02/2009
+
| 2009-11-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 208: Line 233:
 
| 1928294
 
| 1928294
 
| Primary Facility
 
| Primary Facility
| 11/18/2010
+
| 2010-11-18
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 215: Line 240:
 
| 2038836
 
| 2038836
 
| Primary Facility
 
| Primary Facility
| 01/27/2012
+
| 2012-01-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 250: Line 275:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 04:01, 1 August 2019

Well Details

Well ID: 37-063-36564
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: LITTLE 6
License Status: Active
Spud Date: 2009-10-30
Permit Date: 2009-06-10
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.432058
Longitude: -79.093991

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENN VIEW EXPLORATION CORP 5,649.00 276 0.00 0 0.00 0
2011 PENN VIEW EXPLORATION CORP 3,026.89 365 0.00 0 0.00 0
2012 PENN VIEW EXPLORATION CORP 1,232.00 365 0.00 0 0.00 0
2013 PENN VIEW EXPLORATION CORP 1,130.00 365 0.00 0 0.00 0
2014 PENN VIEW EXPLORATION CORP 807.00 365 0.00 0 0.00 0
2015 PENN VIEW EXPLORATION CORP 583.00 365 0.00 0 0.00 0
2016 PENN VIEW EXPLORATION CORP 623.00 365 0.00 0 0.00 0
2017 PENN VIEW EXPLORATION CORP 626.00 365 0.00 0 0.00 0
2018 PENN VIEW EXPLORATION CORP 615.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A00 Produced Fluid (in Barrels) 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A00 Produced Fluid (in Barrels) 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1840922 Primary Facility 2009-11-04 Drilling/Alteration No Violations Noted Currently, E&L drilling currently at 1550 ft. Universal Drilling was in the process of cementing the 7¿ pipe. Well site was identified with well sign and E&S plan. No IW and E&S issues at the time of inspection. Pit aligned with 20 mil plastic and had no freeboard issues. Filter fence located topographically down gradient of site pad. Conductor pipe set at 42.28 ft. 9 5/8¿ pipe set at 412.30 ft with 150 sks class A with 9 bbl return. Water indicated at 120 ft. and 560 ft. No gas indicated nor voids on the boring logs. Stratigraphy consisted of shale, sandstone, limestone, and coal seams.
1840923 Primary Facility 2009-11-04 Drilling/Alteration No Violations Noted Currently, E&L drilling currently at 1550 ft. Universal Drilling was in the process of cementing the 7¿ pipe. Well site was identified with well sign and E&S plan. No IW and E&S issues at the time of inspection. Pit aligned with 20 mil plastic and had no freeboard issues. Filter fence located topographically down gradient of site pad. Conductor pipe set at 42.28 ft. 9 5/8¿ pipe set at 412.30 ft with 150 sks class A with 9 bbl return. Water indicated at 120 ft. and 560 ft. No gas indicated nor voids on the boring logs. Stratigraphy consisted of shale, sandstone, limestone, and coal seams.
1842219 Primary Facility 2009-11-02 Routine/Complete Inspection No Violations Noted At the time of inspection, the site was properly signed and E&S plan was available for review. The rig was setting up in preparation for drilling. Temporary stream crossing was correctly constructed. Filter fabric fence had been properly installed and functioning along with a grub/brush filter. No accelerated E&S issues were observed in relation to well site or access road, although operator should continue to monitor access road for erosion and sedimentation due to slope of roadway. Pits were properly constructed, but not yet lined, reminded operator to properly secure liner when placing in pit. All disturbed areas were temporarily seeded.
1928294 Primary Facility 2010-11-18 Site Restoration No Violations Noted During this inspection, well properly tagged and in production. Site restored with 70% vegetative cover. It is recommended that operator reseed cut slope in spring to ensure uniform coverage. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. No IW concerns noted. Brine tank stable. Operator may remove filter fence as 70% vegetative, permanent stabilization has been reached. Access road stable. Minor stream crossing(GP-7 approved) properly installed and functioning; appers riprap has been add to stream banks; therefore hay bale reinforced filter fence may be removed if permanent stabilization to stream bank/bottom is maintained along crossing
2038836 Primary Facility 2012-01-27 Routine/Complete Inspection No Violations Noted Drilling complete. Tag, tank, e&s ok. Filter fence should be removed.

For data sources see[6]

References