X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-30200"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-30200
 
| Well ID: 37-053-30200
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.553528, -79.488667 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.553528, -79.488667 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 11/20/2012
+
| Spud Date: 2012-11-20
 
|-
 
|-
| Permit Date: 5/11/2012
+
| Permit Date: 2012-05-11
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| [[TITUSVILLE OIL & GAS ASSOC INC]]
 
| [[TITUSVILLE OIL & GAS ASSOC INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 334.12
 
| style="text-align: right;" | 334.12
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[TITUSVILLE OIL & GAS ASSOC INC]]
 
| [[TITUSVILLE OIL & GAS ASSOC INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 524.33
 
| style="text-align: right;" | 524.33
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[TITUSVILLE OIL & GAS ASSOC INC]]
 
| [[TITUSVILLE OIL & GAS ASSOC INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 188.35
 
| style="text-align: right;" | 188.35
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[TITUSVILLE OIL & GAS ASSOC INC]]
 
| [[TITUSVILLE OIL & GAS ASSOC INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 59.92
 
| style="text-align: right;" | 59.92
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 111: Line 136:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 109.57 Bbl
 
| style="text-align: right;" | 109.57 Bbl
Line 117: Line 142:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 120.79 Bbl
 
| style="text-align: right;" | 120.79 Bbl
Line 123: Line 148:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 12.71 Bbl
 
| style="text-align: right;" | 12.71 Bbl
Line 129: Line 154:
 
|  
 
|  
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 44.50 Bbl
 
| style="text-align: right;" | 44.50 Bbl
Line 135: Line 160:
 
|  
 
|  
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 256.53 Bbl
 
| style="text-align: right;" | 256.53 Bbl
Line 141: Line 166:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 413.59 Bbl
 
| style="text-align: right;" | 413.59 Bbl
Line 147: Line 172:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 94.24 Bbl
 
| style="text-align: right;" | 94.24 Bbl
Line 153: Line 178:
 
|  
 
|  
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 5.24 Bbl
 
| style="text-align: right;" | 5.24 Bbl
Line 159: Line 184:
 
|  
 
|  
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 500.12 Bbl
 
| style="text-align: right;" | 500.12 Bbl
Line 165: Line 190:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 125.65 Bbl
 
| style="text-align: right;" | 125.65 Bbl
Line 190: Line 215:
 
| 2094645
 
| 2094645
 
| Primary Facility
 
| Primary Facility
| 08/22/2012
+
| 2012-08-22
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 197: Line 222:
 
| 2109793
 
| 2109793
 
| Primary Facility
 
| Primary Facility
| 10/22/2012
+
| 2012-10-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 204: Line 229:
 
| 2133801
 
| 2133801
 
| Primary Facility
 
| Primary Facility
| 01/28/2013
+
| 2013-01-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 211: Line 236:
 
| 2133805
 
| 2133805
 
| Primary Facility
 
| Primary Facility
| 01/29/2013
+
| 2013-01-29
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 218: Line 243:
 
| 2133810
 
| 2133810
 
| Primary Facility
 
| Primary Facility
| 01/29/2013
+
| 2013-01-29
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 225: Line 250:
 
| 2134689
 
| 2134689
 
| Primary Facility
 
| Primary Facility
| 01/28/2013
+
| 2013-01-28
 
| Incident- Response to Accident or Event
 
| Incident- Response to Accident or Event
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 232: Line 257:
 
| 2140841
 
| 2140841
 
| Primary Facility
 
| Primary Facility
| 02/13/2013
+
| 2013-02-13
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 239: Line 264:
 
| 2179447
 
| 2179447
 
| Primary Facility
 
| Primary Facility
| 06/25/2013
+
| 2013-06-25
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
Line 246: Line 271:
 
| 2210301
 
| 2210301
 
| Primary Facility
 
| Primary Facility
| 10/02/2013
+
| 2013-10-02
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 265: Line 290:
 
| 647607
 
| 647607
 
| 08/22/2012
 
| 08/22/2012
| 09/18/2012
+
| 2012-08-22
 
| 201SKID - Failure to provide information, revise plat, well record, plugging certificate, on skidded wells
 
| 201SKID - Failure to provide information, revise plat, well record, plugging certificate, on skidded wells
 
| Administrative
 
| Administrative
Line 273: Line 298:
 
| 651926
 
| 651926
 
| 10/22/2012
 
| 10/22/2012
| 10/02/2013
+
| 2012-10-22
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 281: Line 306:
 
| 651927
 
| 651927
 
| 10/22/2012
 
| 10/22/2012
| 10/02/2013
+
| 2012-10-22
 
| 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102.
 
| 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102.
 
| Administrative
 
| Administrative
Line 289: Line 314:
 
| 651928
 
| 651928
 
| 10/22/2012
 
| 10/22/2012
| 10/02/2013
+
| 2012-10-22
 
| 102.22 - Failure to achieve permanent stabilization of earth disturbance activity.
 
| 102.22 - Failure to achieve permanent stabilization of earth disturbance activity.
 
| Administrative
 
| Administrative
Line 297: Line 322:
 
| 659362
 
| 659362
 
| 01/28/2013
 
| 01/28/2013
| 08/18/2014
+
| 2013-01-28
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 305: Line 330:
 
| 659363
 
| 659363
 
| 01/28/2013
 
| 01/28/2013
| 08/18/2014
+
| 2013-01-28
 
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
 
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 313: Line 338:
 
| 671761
 
| 671761
 
| 06/25/2013
 
| 06/25/2013
| 10/02/2013
+
| 2013-06-25
 
| 102.22 - Failure to achieve permanent stabilization of earth disturbance activity.
 
| 102.22 - Failure to achieve permanent stabilization of earth disturbance activity.
 
| Administrative
 
| Administrative
Line 335: Line 360:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/18/2012
+
| 2012-09-18
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 344: Line 369:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/02/2013
+
| 2013-10-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 353: Line 378:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/02/2013
+
| 2013-10-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 362: Line 387:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/02/2013
+
| 2013-10-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 371: Line 396:
 
| Superseded
 
| Superseded
 
|  
 
|  
| 08/18/2014
+
| 2014-08-18
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 389: Line 414:
 
| Superseded
 
| Superseded
 
|  
 
|  
| 08/18/2014
+
| 2014-08-18
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 407: Line 432:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/02/2013
+
| 2013-10-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 418: Line 443:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 16:35, 25 July 2019

Well Details

Well ID: 37-053-30200
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Harmony Township
Operator Name: TITUSVILLE OIL & GAS ASSOC INC
Well Pad ID:
Farm/Lease Name: FANNIE F 12
License Status: Active
Spud Date: 2012-11-20
Permit Date: 2012-05-11
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.553528
Longitude: -79.488667

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 TITUSVILLE OIL & GAS ASSOC INC 0.00 0 334.12 366 0.00 0
2013 TITUSVILLE OIL & GAS ASSOC INC 0.00 0 524.33 365 0.00 0
2014 TITUSVILLE OIL & GAS ASSOC INC 0.00 0 188.35 364 0.00 0
2015 TITUSVILLE OIL & GAS ASSOC INC 0.00 0 59.92 364 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-A00 Produced Fluid (in Barrels) 109.57 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012-A00 Produced Fluid (in Barrels) 120.79 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012-A00 Produced Fluid (in Barrels) 12.71 Bbl REUSE OTHER THAN ROAD SPREADING
2012-A00 Produced Fluid (in Barrels) 44.50 Bbl ROAD SPREADING
2013-A00 Produced Fluid (in Barrels) 256.53 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2013-A00 Produced Fluid (in Barrels) 413.59 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2013-A00 Produced Fluid (in Barrels) 94.24 Bbl REUSE OTHER THAN ROAD SPREADING
2013-A00 Produced Fluid (in Barrels) 5.24 Bbl ROAD SPREADING
2014-A00 Produced Fluid (in Barrels) 500.12 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014-A00 Produced Fluid (in Barrels) 125.65 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2094645 Primary Facility 2012-08-22 Routine/Partial Inspection Violation(s) Noted
2109793 Primary Facility 2012-10-22 Routine/Complete Inspection Violation(s) Noted
2133801 Primary Facility 2013-01-28 Routine/Complete Inspection No Violations Noted
2133805 Primary Facility 2013-01-29 Administrative/File Review No Violations Noted well reccord review
2133810 Primary Facility 2013-01-29 Administrative/File Review No Violations Noted completion report review
2134689 Primary Facility 2013-01-28 Incident- Response to Accident or Event Violation(s) Noted
2140841 Primary Facility 2013-02-13 Compliance Evaluation Outstanding Violations - No Viols Req'd
2179447 Primary Facility 2013-06-25 Compliance Evaluation Outstanding Violations - Viols Req'd
2210301 Primary Facility 2013-10-02 Compliance Evaluation Outstanding Violations - No Viols Req'd

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2094645 647607 08/22/2012 2012-08-22 201SKID - Failure to provide information, revise plat, well record, plugging certificate, on skidded wells Administrative 201(b) - plat does not identify all water supplies
2109793 651926 10/22/2012 2012-10-22 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Failure to implement BMPs
2109793 651927 10/22/2012 2012-10-22 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. Administrative Failure to implement BMPs
2109793 651928 10/22/2012 2012-10-22 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. Administrative 102.22(b) - failure to temp stabilize
2134689 659362 01/28/2013 2013-01-28 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety Discharge of residual waste to the ground
2134689 659363 01/28/2013 2013-01-28 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety Failure to properly control and dispose of Production Fluids
2179447 671761 06/25/2013 2013-06-25 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. Administrative 102.22(b) - Failure to temporarily stabilize a disturbance.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
647607 288031 NOV - Notice of Violation Comply/Closed 2012-09-18
651926 290603 NOV - Notice of Violation Comply/Closed 2013-10-02
651927 290603 NOV - Notice of Violation Comply/Closed 2013-10-02
651928 290603 NOV - Notice of Violation Comply/Closed 2013-10-02
659362 295919 NOV - Notice of Violation Superseded 2014-08-18
659362 315076 COA - Consent Order and Agreement $250,000.00 $193,750.00
659363 295919 NOV - Notice of Violation Superseded 2014-08-18
659363 315076 COA - Consent Order and Agreement $250,000.00 $193,750.00
671761 310542 NOV - Notice of Violation Comply/Closed 2013-10-02

For data sources see[6]

References