Difference between revisions of "37-111-20268"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20268
 
| Well ID: 37-111-20268
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.776645, -78.971834 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.776646, -78.971834 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Somerset County, Pennsylvania|Somerset]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Greenville Township, Somerset County, Pennsylvania|Greenville Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Somerset_County,_Pennsylvania|Somerset]]
 +
|-
 +
| Municipality: [[Greenville Township,_Somerset_County,_Pennsylvania|Greenville Township]]
 
|-
 
|-
 
| Operator Name: [[SAMSON RES CO]]
 
| Operator Name: [[SAMSON RES CO]]
 
|-
 
|-
| Well Pad ID: [[147085|147085]]
+
| Well Pad ID: [[147085]]
 
|-
 
|-
 
| Farm/Lease Name: SIMON C YODER 1
 
| Farm/Lease Name: SIMON C YODER 1
 
|-
 
|-
| First Permit Date: 2008-12-10
+
| License Status: Plugged OG Well
|-
 
| Last Permit Date: 2008-12-10
 
 
|-
 
|-
| Spud Date: 2009-01-28
+
| Spud Date: 01/28/2009
 
|-
 
|-
| Unconventional: Yes
+
| Permit Date: 12/10/2008
 
|-
 
|-
| Horizontal: No
+
| Unconventional Well: Y
 
|-
 
|-
| Well Status: ACTIVE
+
| Configuration: Vertical Well
 
|-
 
|-
| Violations: 1
+
| Latitude: 39.776646
|-
 
| Latitude: 39.776645
 
 
|-
 
|-
 
| Longitude: -78.971834
 
| Longitude: -78.971834
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2009-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2009
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2010-2
+
| 2010
| style="text-align:right;" | 0.0
+
| [[SAMSON RES CO]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|-
 
| 2010-3
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 5.0
 
| Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0026034
 
| DORNICK POINT WWTP
 
| JOHNSTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 614.29
+
| style="text-align: right;" | 614.29 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| FRACING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 5,123.81 Bbl
| Bbl
 
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0026034
 
| PA0026034
| DORNICK POINT WWTP
 
| JOHNSTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,792.86 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 359.52
+
| style="text-align: right;" | 359.52 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WV-0014
 
| WV-0014
| LIQUID ASSETS DISPOSAL
 
|
 
| WV
 
|-
 
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| PRODUCED FLUID
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 2,119.05 Bbl
| Bbl
 
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0026034
 
| PA0026034
| DORNICK POINT WWTP
 
| JOHNSTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 952.38
+
| style="text-align: right;" | 952.38 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
+
|-
| JOSEPHINE
+
| 2010-3
| PA
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,754.10 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0026034
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1781634
 
| 1781634
| 2009-04-01
+
| Primary Facility
 +
| 04/01/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Marcellus/drill complete - to be fraced/ID ok/pit ok/E&S ok
 
| Marcellus/drill complete - to be fraced/ID ok/pit ok/E&S ok
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1782425
 
| 1782425
| 2009-04-10
+
| Primary Facility
 +
| 04/10/2009
 +
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
 
| review permit for water mgmt plan
 
| review permit for water mgmt plan
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1800126
 
| 1800126
| 2009-05-26
+
| Primary Facility
 +
| 05/26/2009
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Well site is in active drilling status.  Freshwater pit is embedded properly and is maintaining freeboard requirements.  There are no signs of erosion and sedimentation on the well site or access road.  The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete.  The BMP's that are in place should be maintained.  Filter socks are a temporary BMP that should be monitored to ensure they are intact and functioning. This is a MARCELLUS WELL.
 
| Well site is in active drilling status.  Freshwater pit is embedded properly and is maintaining freeboard requirements.  There are no signs of erosion and sedimentation on the well site or access road.  The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete.  The BMP's that are in place should be maintained.  Filter socks are a temporary BMP that should be monitored to ensure they are intact and functioning. This is a MARCELLUS WELL.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1800885
 
| 1800885
| 2009-05-28
+
| Primary Facility
 +
| 05/28/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| During inspection, DEP met Samson representative, Charlie Howard.  Frac project started on 5/27/09 and continued throughout night shift.  Water flow to pit occurring at the time of inspection.  No flaring occurred.  Well head pressure at 523 psi and Samson was performing water sampling of the discharge at the time of inspection.  At the time of inspection, no E&S issues and no IW discharge issues.
 
| During inspection, DEP met Samson representative, Charlie Howard.  Frac project started on 5/27/09 and continued throughout night shift.  Water flow to pit occurring at the time of inspection.  No flaring occurred.  Well head pressure at 523 psi and Samson was performing water sampling of the discharge at the time of inspection.  At the time of inspection, no E&S issues and no IW discharge issues.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1812026
 
| 1812026
| 2009-07-10
+
| Primary Facility
 +
| 07/10/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| During inspection, DEP met Samson representative, Charlie Howard.  Frac project started on 5/27/09 and has continued to date.  Well was being sparged to bring out the brine water into tanks.  Emission gas was being flared. Brine and Frac water was currently recycled via on-site treatment system (Ozone Technology).  The frac water was pumped to above ground treatment tank where the water was agitated and treated with O3 and 10 % hydrogen peroxide.  Upon completion of treatment, water is transferred to on-site frac tanks and shipped to the Troutman #1 site for future frac project.  At the time of inspection, no E&S issues and no IW discharge issues and no freeboard issues.  Pit is aligned with plastic
 
| During inspection, DEP met Samson representative, Charlie Howard.  Frac project started on 5/27/09 and has continued to date.  Well was being sparged to bring out the brine water into tanks.  Emission gas was being flared. Brine and Frac water was currently recycled via on-site treatment system (Ozone Technology).  The frac water was pumped to above ground treatment tank where the water was agitated and treated with O3 and 10 % hydrogen peroxide.  Upon completion of treatment, water is transferred to on-site frac tanks and shipped to the Troutman #1 site for future frac project.  At the time of inspection, no E&S issues and no IW discharge issues and no freeboard issues.  Pit is aligned with plastic
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1821126
 
| 1821126
| 2009-08-13
+
| Primary Facility
 +
| 08/13/2009
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| The pits on site have been restored. Drilling is complete, but well is not in production. There are no signs of erosion and sedimentation on the access road and well site at the time of the inspection.
 
| The pits on site have been restored. Drilling is complete, but well is not in production. There are no signs of erosion and sedimentation on the access road and well site at the time of the inspection.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1837093
 
| 1837093
| 2009-10-08
+
| Primary Facility
 +
| 10/08/2009
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, the well was drilled. Drilling concluded on 03/1/2009. The access road was in good condition. Compost socks were in place; no accelerated E&S issues were noted. Pits had been removed. The site had not yet been restored, as the area had not be seeded or mulched. Note: I received notice/letter from inspector Paul Wyrwas that Samson is attempting to file for an extension on restoration timeframe in order to reevaluate the well; therefore, Samson has put restoration proceedings on hold until further notice.
 
| At the time of inspection, the well was drilled. Drilling concluded on 03/1/2009. The access road was in good condition. Compost socks were in place; no accelerated E&S issues were noted. Pits had been removed. The site had not yet been restored, as the area had not be seeded or mulched. Note: I received notice/letter from inspector Paul Wyrwas that Samson is attempting to file for an extension on restoration timeframe in order to reevaluate the well; therefore, Samson has put restoration proceedings on hold until further notice.
|
 
|
 
|
 
|-
 
|-
 
| 1884241
 
| 2010-05-12
 
| Violation(s) Noted
 
| At the time of inspection, well was drilled not in production, currently on inactive status. Dept received restoration report February 2010. Well site had not been completely restored as of this inspection. Drilling was completed on March 1, 2009; therefore, site was not restored within nine months of completion. Pad was rocked, pits were removed, but area not been seeded or mulched; therefore, 70% successful vegetative growth was not observed. Bmp filter sox﾿s were surrounding site and functioning as a temporary bmp no accelerated E&S issues were noted. Observed soil pile had not yet been removed, but was stabilized.
 
Note letter of extension on restoration was submitted to dept but was denied. 
 
 
| 586949
 
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 
|
 
|-
 
 
|-
 
|-
 
| 1884241
 
| 1884241
| 2010-05-12
+
| Primary Facility
 +
| 05/12/2010
 +
| Site Restoration
 
| Violation(s) Noted
 
| Violation(s) Noted
| At the time of inspection, well was drilled not in production, currently on inactive status. Dept received restoration report February 2010. Well site had not been completely restored as of this inspection. Drilling was completed on March 1, 2009; therefore, site was not restored within nine months of completion. Pad was rocked, pits were removed, but area not been seeded or mulched; therefore, 70% successful vegetative growth was not observed. Bmp filter sox﾿s were surrounding site and functioning as a temporary bmp no accelerated E&S issues were noted. Observed soil pile had not yet been removed, but was stabilized.  
+
| At the time of inspection, well was drilled not in production, currently on inactive status. Dept received restoration report February 2010. Well site had not been completely restored as of this inspection. Drilling was completed on March 1, 2009; therefore, site was not restored within nine months of completion. Pad was rocked, pits were removed, but area not been seeded or mulched; therefore, 70% successful vegetative growth was not observed. Bmp filter sox¿s were surrounding site and functioning as a temporary bmp no accelerated E&S issues were noted. Observed soil pile had not yet been removed, but was stabilized.
Note letter of extension on restoration was submitted to dept but was denied. 
 
 
 
| 586949
 
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 
|
 
|-
 
 
|-
 
|-
 
| 1915376
 
| 1915376
| 2010-09-09
+
| Primary Facility
 +
| 09/09/2010
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Inspection was conducted to ensure site restoration. Pad in place; no production equipment installed yet; perimeter BMP﾿s removed and site revegetated with minimum 70% vegetative cover.  Access road maintained and no E&S problems noted.
+
| Inspection was conducted to ensure site restoration. Pad in place; no production equipment installed yet; perimeter BMP¿s removed and site revegetated with minimum 70% vegetative cover.  Access road maintained and no E&S problems noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1963220
 
| 1963220
| 2011-03-30
+
| Primary Facility
 +
| 03/30/2011
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
| During inspection, DEP met Samson representative, Greg Delane.  Well plug in accordance with 78.92 regulations. 11 ï¾¾ ﾿, 42#, H-40 csg. @ 500﾿, 8 5/8﾿, 32#, J-55 csg. @ 1,512﾿ (245 sks Hal Lt &185 sks Class A),5 ᄑ﾿ , 20#, P-110 csg.  @ 6,001﾿TOC 3,838﾿ (70sks of Extendacem scav & 235 sxs Varicem) PBTD ﾿ 5,808﾿. Completed interval for Marcellus Shale:  5,523﾿-5,527 and 5,594-5,602 (60 holes) and 5,681﾿-5,685﾿ and 5,699﾿-5,709﾿ and 5,714﾿-5,716﾿ (79 holes )  Remove of BOP stack and set mechanical plug at 5500 ft.  Process of setting cement plug of 100 ft on top of plug. (17 sks of class A).  0 psi on well head prior to working on well.  No pit was completed.  Samson using containers for water from well and potable water.  At the time of inspection, no E&S issues and no IW discharge issues
+
| During inspection, DEP met Samson representative, Greg Delane.  Well plug in accordance with 78.92 regulations. 11 ¾ ¿, 42#, H-40 csg. @ 500¿, 8 5/8¿, 32#, J-55 csg. @ 1,512¿ (245 sks Hal Lt &185 sks Class A),5 ½¿ , 20#, P-110 csg.  @ 6,001¿TOC 3,838¿ (70sks of Extendacem scav & 235 sxs Varicem) PBTD ¿ 5,808¿. Completed interval for Marcellus Shale:  5,523¿-5,527 and 5,594-5,602 (60 holes) and 5,681¿-5,685¿ and 5,699¿-5,709¿ and 5,714¿-5,716¿ (79 holes )  Remove of BOP stack and set mechanical plug at 5500 ft.  Process of setting cement plug of 100 ft on top of plug. (17 sks of class A).  0 psi on well head prior to working on well.  No pit was completed.  Samson using containers for water from well and potable water.  At the time of inspection, no E&S issues and no IW discharge issues
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1965621
 
| 1965621
| 2011-04-14
+
| Primary Facility
 +
| 04/14/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, site ID sign and Es plan present. Drilling completed 03/01/09. Well plugged and marked with erected monument with API number attached. Pad not yet restored, pits removed (1 frac tank onsite) and previously disturbed areas seeded mulched with >70% vegetative growth. No accelerated erosion or sedimentation issues noted with site or access road. Spoke to land owner onsite, who inquired about deadline for restoration--- reiterated regulation requires that within 9 months from date of completion of plugging the site is to be permanently stabilized by >70% perennial vegetative cover or other permanent stabilization measures capable of resisting erosion--- specifics are between land owner (ease agreement) and operator as owner would like to farm field. Also stated that erected monument will stay in placed as required by regulations.  No violations noted at this inspection.
 
| At the time of inspection, site ID sign and Es plan present. Drilling completed 03/01/09. Well plugged and marked with erected monument with API number attached. Pad not yet restored, pits removed (1 frac tank onsite) and previously disturbed areas seeded mulched with >70% vegetative growth. No accelerated erosion or sedimentation issues noted with site or access road. Spoke to land owner onsite, who inquired about deadline for restoration--- reiterated regulation requires that within 9 months from date of completion of plugging the site is to be permanently stabilized by >70% perennial vegetative cover or other permanent stabilization measures capable of resisting erosion--- specifics are between land owner (ease agreement) and operator as owner would like to farm field. Also stated that erected monument will stay in placed as required by regulations.  No violations noted at this inspection.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1986410
 
| 1986410
| 2011-06-30
+
| Primary Facility
 +
| 06/30/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection of the site was conducted with Bobby Pugh of Samson Resources.
 
| Inspection of the site was conducted with Bobby Pugh of Samson Resources.
Site had been seeded and mulched.
+
|-
Well was plugged with vent stack and welded marker.
+
| 2434669
Landowner had recently retiled area.
+
| Primary Facility
No violations noted at this time.
+
| 12/08/2015
 
+
| Routine/Complete Inspection
|  
+
| No Violations Noted
|  
+
| Unconventional single well site. Department records indicate well was plugged on 4-2-2011 and restoration report received on 9-29-2011.
|  
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 03:41, 15 July 2019

Well Details

Well ID: 37-111-20268
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Greenville Township
Operator Name: SAMSON RES CO
Well Pad ID: 147085
Farm/Lease Name: SIMON C YODER 1
License Status: Plugged OG Well
Spud Date: 01/28/2009
Permit Date: 12/10/2008
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 39.776646
Longitude: -78.971834

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0.00 0.00
2010 SAMSON RES CO 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-3 Drilling Fluid Waste (in Barrels) 614.29 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-3 Drilling Fluid Waste (in Barrels) 5,123.81 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010-3 Fracing Fluid Waste (in Barrels) 1,792.86 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-3 Fracing Fluid Waste (in Barrels) 359.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WV-0014
2010-3 Fracing Fluid Waste (in Barrels) 2,119.05 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010-3 Produced Fluid (in Barrels) 952.38 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-3 Produced Fluid (in Barrels) 1,754.10 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1781634 Primary Facility 04/01/2009 Drilling/Alteration No Violations Noted Marcellus/drill complete - to be fraced/ID ok/pit ok/E&S ok
1782425 Primary Facility 04/10/2009 Administrative/File Review No Violations Noted review permit for water mgmt plan
1800126 Primary Facility 05/26/2009 Routine/Complete Inspection No Violations Noted Well site is in active drilling status. Freshwater pit is embedded properly and is maintaining freeboard requirements. There are no signs of erosion and sedimentation on the well site or access road. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete. The BMP's that are in place should be maintained. Filter socks are a temporary BMP that should be monitored to ensure they are intact and functioning. This is a MARCELLUS WELL.
1800885 Primary Facility 05/28/2009 Drilling/Alteration No Violations Noted During inspection, DEP met Samson representative, Charlie Howard. Frac project started on 5/27/09 and continued throughout night shift. Water flow to pit occurring at the time of inspection. No flaring occurred. Well head pressure at 523 psi and Samson was performing water sampling of the discharge at the time of inspection. At the time of inspection, no E&S issues and no IW discharge issues.
1812026 Primary Facility 07/10/2009 Drilling/Alteration No Violations Noted During inspection, DEP met Samson representative, Charlie Howard. Frac project started on 5/27/09 and has continued to date. Well was being sparged to bring out the brine water into tanks. Emission gas was being flared. Brine and Frac water was currently recycled via on-site treatment system (Ozone Technology). The frac water was pumped to above ground treatment tank where the water was agitated and treated with O3 and 10 % hydrogen peroxide. Upon completion of treatment, water is transferred to on-site frac tanks and shipped to the Troutman #1 site for future frac project. At the time of inspection, no E&S issues and no IW discharge issues and no freeboard issues. Pit is aligned with plastic
1821126 Primary Facility 08/13/2009 Routine/Complete Inspection No Violations Noted The pits on site have been restored. Drilling is complete, but well is not in production. There are no signs of erosion and sedimentation on the access road and well site at the time of the inspection.
1837093 Primary Facility 10/08/2009 Routine/Complete Inspection No Violations Noted At the time of inspection, the well was drilled. Drilling concluded on 03/1/2009. The access road was in good condition. Compost socks were in place; no accelerated E&S issues were noted. Pits had been removed. The site had not yet been restored, as the area had not be seeded or mulched. Note: I received notice/letter from inspector Paul Wyrwas that Samson is attempting to file for an extension on restoration timeframe in order to reevaluate the well; therefore, Samson has put restoration proceedings on hold until further notice.
1884241 Primary Facility 05/12/2010 Site Restoration Violation(s) Noted At the time of inspection, well was drilled not in production, currently on inactive status. Dept received restoration report February 2010. Well site had not been completely restored as of this inspection. Drilling was completed on March 1, 2009; therefore, site was not restored within nine months of completion. Pad was rocked, pits were removed, but area not been seeded or mulched; therefore, 70% successful vegetative growth was not observed. Bmp filter sox¿s were surrounding site and functioning as a temporary bmp no accelerated E&S issues were noted. Observed soil pile had not yet been removed, but was stabilized.
1915376 Primary Facility 09/09/2010 Routine/Complete Inspection No Violations Noted Inspection was conducted to ensure site restoration. Pad in place; no production equipment installed yet; perimeter BMP¿s removed and site revegetated with minimum 70% vegetative cover. Access road maintained and no E&S problems noted.
1963220 Primary Facility 03/30/2011 Plugging(Includes Plugged/Mined Through) No Violations Noted During inspection, DEP met Samson representative, Greg Delane. Well plug in accordance with 78.92 regulations. 11 ¾ ¿, 42#, H-40 csg. @ 500¿, 8 5/8¿, 32#, J-55 csg. @ 1,512¿ (245 sks Hal Lt &185 sks Class A),5 ½¿ , 20#, P-110 csg. @ 6,001¿TOC 3,838¿ (70sks of Extendacem scav & 235 sxs Varicem) PBTD ¿ 5,808¿. Completed interval for Marcellus Shale: 5,523¿-5,527 and 5,594-5,602 (60 holes) and 5,681¿-5,685¿ and 5,699¿-5,709¿ and 5,714¿-5,716¿ (79 holes ) Remove of BOP stack and set mechanical plug at 5500 ft. Process of setting cement plug of 100 ft on top of plug. (17 sks of class A). 0 psi on well head prior to working on well. No pit was completed. Samson using containers for water from well and potable water. At the time of inspection, no E&S issues and no IW discharge issues
1965621 Primary Facility 04/14/2011 Routine/Complete Inspection No Violations Noted At the time of inspection, site ID sign and Es plan present. Drilling completed 03/01/09. Well plugged and marked with erected monument with API number attached. Pad not yet restored, pits removed (1 frac tank onsite) and previously disturbed areas seeded mulched with >70% vegetative growth. No accelerated erosion or sedimentation issues noted with site or access road. Spoke to land owner onsite, who inquired about deadline for restoration--- reiterated regulation requires that within 9 months from date of completion of plugging the site is to be permanently stabilized by >70% perennial vegetative cover or other permanent stabilization measures capable of resisting erosion--- specifics are between land owner (ease agreement) and operator as owner would like to farm field. Also stated that erected monument will stay in placed as required by regulations. No violations noted at this inspection.
1986410 Primary Facility 06/30/2011 Routine/Complete Inspection No Violations Noted Inspection of the site was conducted with Bobby Pugh of Samson Resources.
2434669 Primary Facility 12/08/2015 Routine/Complete Inspection No Violations Noted Unconventional single well site. Department records indicate well was plugged on 4-2-2011 and restoration report received on 9-29-2011.