X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-30514"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-30514
 
| Well ID: 37-063-30514
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.888268, -79.112723 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.888269, -79.112724 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Indiana County, Pennsylvania|Indiana]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[West Mahoning Township, Indiana County, Pennsylvania|West Mahoning Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[XTO ENERGY INC]]
+
| County: [[Indiana_County,_Pennsylvania|Indiana]]
 +
|-
 +
| Municipality: [[West Mahoning Township,_Indiana_County,_Pennsylvania|West Mahoning Township]]
 +
|-
 +
| Operator Name: [[ALLIANCE PETROLEUM CO LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 15: Line 19:
 
| Farm/Lease Name: MILO WEAVER,ETUX, FMLY D.R. ROUSH 3
 
| Farm/Lease Name: MILO WEAVER,ETUX, FMLY D.R. ROUSH 3
 
|-
 
|-
| First Permit Date: 1992-07-30
+
| License Status: Active
 
|-
 
|-
| Last Permit Date: 1992-07-30
+
| Spud Date: 10/20/1992
 
|-
 
|-
| Spud Date: 1992-10-20
+
| Permit Date: 7/30/1992
 
|-
 
|-
| Unconventional: No
+
| Unconventional Well: N
 
|-
 
|-
| Horizontal: No
+
| Configuration: Vertical Well
 
|-
 
|-
| Well Status: ACTIVE
+
| Latitude: 40.888269
|-
 
| Violations: 0
 
|-
 
| Latitude: 40.888268
 
|-
 
| Longitude: -79.112723
 
 
|-
 
|-
 +
| Longitude: -79.112724
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 1993-0
 
| style="text-align:right;" | 7885.0
 
| style="text-align:right;" | 92.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 1996-0
 
| style="text-align:right;" | 6631.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 1997-0
 
| style="text-align:right;" | 2939.0
 
| style="text-align:right;" | 192.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 1998-0
 
| style="text-align:right;" | 8793.0
 
| style="text-align:right;" | 315.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 1999-0
+
| 1993
| style="text-align:right;" | 9208.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 362.0
+
| style="text-align: right;" | 7,885.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 92
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 1996
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 6,631.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2000-0
+
| 1997
| style="text-align:right;" | 7227.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 2,939.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 192
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 1998
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 8,793.00
 +
| style="text-align: right;" | 315
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2001-0
+
| 1999
| style="text-align:right;" | 4622.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 273.0
+
| style="text-align: right;" | 9,208.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 362
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2000
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 7,227.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2002-0
+
| 2001
| style="text-align:right;" | 4546.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 258.0
+
| style="text-align: right;" | 4,622.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 273
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2002
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 4,546.00
 +
| style="text-align: right;" | 258
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2003-0
+
| 2003
| style="text-align:right;" | 5865.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 5,865.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2004
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 4,784.00
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2004-0
+
| 2005
| style="text-align:right;" | 4784.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 364.0
+
| style="text-align: right;" | 4,080.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" |  
 
|-
 
|-
| 2005-0
+
| 2006
| style="text-align:right;" | 4080.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 2,984.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2007
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 5,588.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2006-0
+
| 2008
| style="text-align:right;" | 2984.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 3,258.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 288
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2009
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 3,480.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2007-0
+
| 2010
| style="text-align:right;" | 5588.0
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 3,005.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" |  
|-
 
| 2008-0
 
| style="text-align:right;" | 3258.0
 
| style="text-align:right;" | 288.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2009-0
 
| style="text-align:right;" | 3480.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-0
 
| style="text-align:right;" | 3005.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 2,348.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2011-0
+
| 2012
| style="text-align:right;" | 2348.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 334.0
+
| style="text-align: right;" | 2,088.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 357
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 329.00
 +
| style="text-align: right;" | 42
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2012-0
+
| 2014
| style="text-align:right;" | 2088.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 357.0
+
| style="text-align: right;" | 1,131.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 222
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 501.80
 +
| style="text-align: right;" | 354
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-0
+
| 2016
| style="text-align:right;" | 329.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 42.0
+
| style="text-align: right;" | 366.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2017
 +
| [[ALLIANCE PETROLEUM CO LLC]]
 +
| style="text-align: right;" | 257.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2014-0
+
| 2018
| style="text-align:right;" | 1131.0
+
| [[ALLIANCE PETROLEUM CO LLC]]
| style="text-align:right;" | 222.0
+
| style="text-align: right;" | 419.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 1996-0
 
| 1996-0
| BRINE
+
| Brine
| style="text-align:right;" | 340.0
+
| style="text-align: right;" | 340.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| PARW00000008
 
| PARW00000008
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1997-0
 
| 1997-0
| BRINE
+
| Brine
| style="text-align:right;" | 71.0
+
| style="text-align: right;" | 71.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| GROUP
 
| GROUP
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1998-0
 
| 1998-0
| BRINE
+
| Brine
| style="text-align:right;" | 481.0
+
| style="text-align: right;" | 481.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| 033-WAST1
 
| 033-WAST1
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1999-0
 
| 1999-0
| BRINE
+
| Brine
| style="text-align:right;" | 812.0
+
| style="text-align: right;" | 812.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| SEE END
 
| SEE END
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2000-0
 
| 2000-0
| BRINE
+
| Brine
| style="text-align:right;" | 705.0
+
| style="text-align: right;" | 705.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| SEE END
 
| SEE END
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2001-0
 
| 2001-0
| BRINE
+
| Brine
| style="text-align:right;" | 496.0
+
| style="text-align: right;" | 496.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2002-0
 
| 2002-0
| BRINE
+
| Brine
| style="text-align:right;" | 285.0
+
| style="text-align: right;" | 285.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2003-0
 
| 2003-0
| BRINE
+
| Brine
| style="text-align:right;" | 529.0
+
| style="text-align: right;" | 529.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2004-0
 
| 2004-0
| BRINE
+
| Brine
| style="text-align:right;" | 550.0
+
| style="text-align: right;" | 550.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2005-0
 
| 2005-0
| BRINE
+
| Brine
| style="text-align:right;" | 455.0
+
| style="text-align: right;" | 455.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2006-0
 
| 2006-0
| BRINE
+
| Brine
| style="text-align:right;" | 410.0
+
| style="text-align: right;" | 410.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2008-0
 
| 2008-0
| BRINE
+
| Brine
| style="text-align:right;" | 310.0
+
| style="text-align: right;" | 310.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| PA0101508
 
| PA0101508
| PA BRINE
 
|
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 250.0
+
| style="text-align: right;" | 250.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| 301353
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 34.0
+
| style="text-align: right;" | 1.00 Bbl
| Bbl
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PUBLIC SEWAGE TREATMENT PLANT
+
| PA0020346
| PA0026310
 
| CLEARFIELD MUNICIPAL SEWAGE TREATMENT PLANT
 
| CLEARFIELD
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 11.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| PA0091472
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 39.00 Bbl
| Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0026034
 
| DORNICK PT SEWAGE TREATMENT PLANT
 
| JOHNSTOWN
 
| PA
 
|-
 
|-
 
| 2010-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 39.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 30.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0020346
+
| PA0095443
| PUNXSUTAWNEY BORO SEWAGE TREATMENT PLANT
 
| PUNXSUTAWNEY
 
| PA
 
 
|-
 
|-
 +
| 2010-0
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0026034
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 11.0
+
| style="text-align: right;" | 34.00 Bbl
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
|-
 
| 2011-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 74.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PAR000519462
 
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
|-
 
| 2011-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 74.0
 
| Bbl
 
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0026310
 
| PA0026310
| CLEARFIELD MUNICIPAL SEWAGE TREATMENT PLANT
 
| CLEARFIELD
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-0
 
| 2011-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 73.0
+
| style="text-align: right;" | 74.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| 301353
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-0
 
| 2011-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 134.0
+
| style="text-align: right;" | 134.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
|-
+
| 2011-0
| 2012-0
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 73.00 Bbl
| style="text-align:right;" | 184.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| PA
 
 
|-
 
|-
 +
| 2011-0
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 74.00 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0026310
 
|-
 
|-
 
| 2012-0
 
| 2012-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 71.0
+
| style="text-align: right;" | 71.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 +
| 2012-0
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 184.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095443
 
|-
 
|-
 
| 2013-0
 
| 2013-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 69.0
+
| style="text-align: right;" | 69.00 Bbl
| Bbl
 
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
+
|-
 +
| 2851729
 +
| Primary Facility
 +
| 2019-03-12
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| create start file
 
|-
 
|-
 
| 566473
 
| 566473
 +
| Primary Facility
 
| 1994-04-12
 
| 1994-04-12
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| E&S OK; TANK
 
| E&S OK; TANK
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 570960
 
| 570960
| 1995-11-03
+
| Primary Facility
 +
| 11/03/1995
 +
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
 
| TANK; E&S OK
 
| TANK; E&S OK
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 15:20, 14 July 2019

Well Details

Well ID: 37-063-30514
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Mahoning Township
Operator Name: ALLIANCE PETROLEUM CO LLC
Well Pad ID:
Farm/Lease Name: MILO WEAVER,ETUX, FMLY D.R. ROUSH 3
License Status: Active
Spud Date: 10/20/1992
Permit Date: 7/30/1992
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.888269
Longitude: -79.112724

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1993 PHILLIPS EXPLORATION INC 7,885.00 92 0.00 0.00
1996 PHILLIPS EXPLORATION INC 6,631.00 365 0.00 0.00
1997 PHILLIPS EXPLORATION INC 2,939.00 192 0.00 0.00
1998 PHILLIPS EXPLORATION INC 8,793.00 315 0.00 0.00
1999 PHILLIPS EXPLORATION INC 9,208.00 362 0.00 0.00
2000 PHILLIPS EXPLORATION INC 7,227.00 365 0.00 0.00
2001 PHILLIPS EXPLORATION INC 4,622.00 273 0.00 0.00
2002 PHILLIPS EXPLORATION INC 4,546.00 258 0.00 0.00
2003 PHILLIPS EXPLORATION INC 5,865.00 365 0.00 0.00
2004 PHILLIPS EXPLORATION INC 4,784.00 364 0.00 0.00
2005 PHILLIPS EXPLORATION INC 4,080.00 365 0.00 0.00
2006 PHILLIPS EXPLORATION INC 2,984.00 365 0.00 0.00
2007 PHILLIPS EXPLORATION INC 5,588.00 365 0.00 0.00
2008 PHILLIPS EXPLORATION INC 3,258.00 288 0.00 0.00
2009 PHILLIPS EXPLORATION INC 3,480.00 365 0.00 0.00
2010 PHILLIPS EXPLORATION INC 3,005.00 365 0.00 0.00
2011 PHILLIPS EXPLORATION INC 2,348.00 334 0.00 0.00
2012 XTO ENERGY INC 2,088.00 357 0.00 0.00
2013 XTO ENERGY INC 329.00 42 0.00 0.00
2014 XTO ENERGY INC 1,131.00 222 0.00 0.00
2015 XTO ENERGY INC 501.80 354 0.00 0.00
2016 XTO ENERGY INC 366.00 366 0.00 0.00
2017 ALLIANCE PETROLEUM CO LLC 257.00 334 0.00 0.00
2018 ALLIANCE PETROLEUM CO LLC 419.00 365 0.00 0.00

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
1996-0 Brine 340.00 Bbl Brine or Industrial Waste Treatment Plt PARW00000008
1997-0 Brine 71.00 Bbl Brine or Industrial Waste Treatment Plt GROUP
1998-0 Brine 481.00 Bbl Brine or Industrial Waste Treatment Plt 033-WAST1
1999-0 Brine 812.00 Bbl Brine or Industrial Waste Treatment Plt SEE END
2000-0 Brine 705.00 Bbl Brine or Industrial Waste Treatment Plt SEE END
2001-0 Brine 496.00 Bbl Brine or Industrial Waste Treatment Plt
2002-0 Brine 285.00 Bbl Brine or Industrial Waste Treatment Plt
2003-0 Brine 529.00 Bbl Brine or Industrial Waste Treatment Plt
2004-0 Brine 550.00 Bbl Brine or Industrial Waste Treatment Plt
2005-0 Brine 455.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2006-0 Brine 410.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2008-0 Brine 310.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010-0 Produced Fluid (in Barrels) 250.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-0 Produced Fluid (in Barrels) 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010-0 Produced Fluid (in Barrels) 11.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-0 Produced Fluid (in Barrels) 39.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-0 Produced Fluid (in Barrels) 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010-0 Produced Fluid (in Barrels) 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010-0 Produced Fluid (in Barrels) 34.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2011-0 Produced Fluid (in Barrels) 74.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-0 Produced Fluid (in Barrels) 134.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-0 Produced Fluid (in Barrels) 73.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011-0 Produced Fluid (in Barrels) 74.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2012-0 Produced Fluid (in Barrels) 71.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012-0 Produced Fluid (in Barrels) 184.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2013-0 Produced Fluid (in Barrels) 69.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2851729 Primary Facility 2019-03-12 Administrative/File Review No Violations Noted create start file
566473 Primary Facility 1994-04-12 Routine/Complete Inspection No Violations Noted E&S OK; TANK
570960 Primary Facility 11/03/1995 Site Restoration No Violations Noted TANK; E&S OK

For data sources see[6]

References