X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0635233412020"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0635233412020
 
| Well ID: 0635233412020
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.49595200000004525, -117.37889400000000251 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.495952, -117.378894 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/12-34-063-23W5/0
 
| Location: 02/12-34-063-23W5/0
 
|-
 
|-
| Well Name: RMP 102 HZ WAHIGAN 12-34-63-23
+
| Location Alias: 02/12-34-63-23 W5M
 +
|-
 +
| Location Alias 2: 02/12-34-063-23 W5/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 +
|-
 +
| Well Name: TANGLE CREEK 102 WAHIGAN 12-34-63-23
 +
|-
 +
| Operator Name: [[Tangle Creek Energy Ltd.]]
 +
|-
 +
| License Number: 0432313
 
|-
 
|-
 
| License Date: 2011-03-11
 
| License Date: 2011-03-11
 
|-
 
|-
| Final Drilling Date: 2011-06-12
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2011-03-26
 +
|-
 +
| Final Drill Date: 2011-06-12
 +
|-
 +
| Well Total Depth: 3462 m
 +
|-
 +
| Surface Hole Latitude: 54.495952
 +
|-
 +
| Surface Hole Longitude: -117.378894
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2011-06-03
 +
| style="text-align: right;" | 1889
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2011-07-20
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 3457
 +
| style="text-align: right;" | 3462
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-07-20
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3396.1
 +
| style="text-align: right;" | 3396.2
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-07-20
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3319.5
 +
| style="text-align: right;" | 3319.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-07-20
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3186.2
 +
| style="text-align: right;" | 3186.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-07-20
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3103.6
 +
| style="text-align: right;" | 3103.7
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-07-21
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2982.9
 +
| style="text-align: right;" | 2983
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 3462.0m
+
| 2011-07-21
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2910.9
 +
| style="text-align: right;" | 2911
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2011-07-21
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2815.7
 +
| style="text-align: right;" | 2815.8
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Pumping
+
| 2011-07-21
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2703.9
 +
| style="text-align: right;" | 2704
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2011-07-21
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2604.9
 +
| style="text-align: right;" | 2605
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Horizontal
+
| 2011-07-21
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2479.3
 +
| style="text-align: right;" | 2479.4
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 54.49595200000004525
+
| 2011-07-21
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2420.7
 +
| style="text-align: right;" | 2420.8
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -117.37889400000000251
+
| 2011-07-21
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2335.2
 +
| style="text-align: right;" | 2335.3
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 2757
 +
| style="text-align: right;" | 448.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1069.9
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8019
 +
| style="text-align: right;" | 469.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1330.8
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8382
 +
| style="text-align: right;" | 294.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1234.7
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8607
 +
| style="text-align: right;" | 206.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 752.4
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8297
 +
| style="text-align: right;" | 183.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 674.8
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 5920
 +
| style="text-align: right;" | 97.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 436.4
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8307
 +
| style="text-align: right;" | 143.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 894.9
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 3455
 +
| style="text-align: right;" | 66.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 304.2
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 21:59, 10 June 2019

Well Details

Well ID: 0635233412020
Loading map...
Location: 02/12-34-063-23W5/0
Location Alias: 02/12-34-63-23 W5M
Location Alias 2: 02/12-34-063-23 W5/00
Province: Alberta
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK 102 WAHIGAN 12-34-63-23
Operator Name: Tangle Creek Energy Ltd.
License Number: 0432313
License Date: 2011-03-11
License Status: Issued
Spud Date: 2011-03-26
Final Drill Date: 2011-06-12
Well Total Depth: 3462 m
Surface Hole Latitude: 54.495952
Surface Hole Longitude: -117.378894

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2011-06-03 1889 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-20 Open Hole/Barefoot Completion 3457 3462 0
2011-07-20 Multi-Stage Fracture 3396.1 3396.2 0
2011-07-20 Multi-Stage Fracture 3319.5 3319.6 0
2011-07-20 Multi-Stage Fracture 3186.2 3186.3 0
2011-07-20 Multi-Stage Fracture 3103.6 3103.7 0
2011-07-21 Multi-Stage Fracture 2982.9 2983 0
2011-07-21 Multi-Stage Fracture 2910.9 2911 0
2011-07-21 Multi-Stage Fracture 2815.7 2815.8 0
2011-07-21 Multi-Stage Fracture 2703.9 2704 0
2011-07-21 Multi-Stage Fracture 2604.9 2605 0
2011-07-21 Multi-Stage Fracture 2479.3 2479.4 0
2011-07-21 Multi-Stage Fracture 2420.7 2420.8 0
2011-07-21 Multi-Stage Fracture 2335.2 2335.3 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2757 448.7 0.0 1069.9
2012 8019 469.9 0.0 1330.8
2013 8382 294.9 0.0 1234.7
2014 8607 206.9 0.0 752.4
2015 8297 183.0 0.0 674.8
2016 5920 97.5 0.0 436.4
2017 8307 143.0 0.0 894.9
2018 3455 66.9 0.0 304.2

For data sources see[5]

References