X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0375042410002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0375042410002
 
| Well ID: 0375042410002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.19714400000003707, -114.43907799999999497 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.197144, -114.439078 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-24-037-04W5/2
 
| Location: 00/10-24-037-04W5/2
 
|-
 
|-
| Well Name: KMG GULF SYLAKE 10-24-37-4
+
| Location Alias: 00/10-24-37-04 W5M
 +
|-
 +
| Location Alias 2: 00/10-24-037-04 W5/02
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Clearwater County,_Alberta|Clearwater County]]
 +
|-
 +
| Well Name: CVE SYLAKE 10-24-37-4
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0025329
 
|-
 
|-
 
| License Date: 1963-12-16
 
| License Date: 1963-12-16
 
|-
 
|-
| Final Drilling Date: 1964-01-12
+
| License Status: RecCertified
 
|-
 
|-
| Total Depth: 2394.2m
+
| Spud Date: 1963-12-29
 
|-
 
|-
| Fluid Type: Crude Oil
+
| Final Drill Date: 1964-01-12
 
|-
 
|-
| Status: Abandoned Zone
+
| Well Total Depth: 2394.2 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 52.197144
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -114.439078
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Latitude: 52.19714400000003707
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Longitude: -114.43907799999999497
+
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1964-01-18
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-01-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-11-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2255.5
 +
| style="text-align: right;" | 2263.4
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-11-11
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 1774.2
 +
| style="text-align: right;" | 1776.7
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-11-11
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 1777.6
 +
| style="text-align: right;" | 1777.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-11-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 1774.2
 +
| style="text-align: right;" | 1777.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-11-12
 +
| Fracture
 +
| style="text-align: right;" | 1774.2
 +
| style="text-align: right;" | 1777.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1970-01-06
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1773.9
 +
| style="text-align: right;" | 1777.9
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1970-01-06
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 1989-09-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-01-21
 +
| Perforation
 +
| style="text-align: right;" | 2294.5
 +
| style="text-align: right;" | 2295.8
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1993-01-25
 +
| Acid Treatment
 +
| style="text-align: right;" | 2294.5
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-02-04
 +
| Perforation
 +
| style="text-align: right;" | 2290.6
 +
| style="text-align: right;" | 2293.6
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1994-06-15
 +
| Acid Treatment
 +
| style="text-align: right;" | 2290.6
 +
| style="text-align: right;" | 2297.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-02-06
 +
| Perforation
 +
| style="text-align: right;" | 1772.4
 +
| style="text-align: right;" | 1778.4
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1996-02-09
 +
| Fracture
 +
| style="text-align: right;" | 1772.4
 +
| style="text-align: right;" | 1778.4
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-09-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2256
 +
| style="text-align: right;" | 2264
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-09-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1757
 +
| style="text-align: right;" | 1765
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-09-25
 +
| Perforation
 +
| style="text-align: right;" | 511.8
 +
| style="text-align: right;" | 512.8
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-09-26
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 511.8
 +
| style="text-align: right;" | 512.8
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 2.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 20.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 14.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 2520
 +
| style="text-align: right;" | 16.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1969
 +
| style="text-align: right;" | 2064
 +
| style="text-align: right;" | 7.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1970
 +
| style="text-align: right;" | 168
 +
| style="text-align: right;" | 245.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 18:09, 8 June 2019

Well Details

Well ID: 0375042410002
Loading map...
Location: 00/10-24-037-04W5/2
Location Alias: 00/10-24-37-04 W5M
Location Alias 2: 00/10-24-037-04 W5/02
Province: Alberta
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 10-24-37-4
Operator Name:
License Number: 0025329
License Date: 1963-12-16
License Status: RecCertified
Spud Date: 1963-12-29
Final Drill Date: 1964-01-12
Well Total Depth: 2394.2 m
Surface Hole Latitude: 52.197144
Surface Hole Longitude: -114.439078

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-01-18 Hydra Jet Perforation 2297.3 2297.3 0
1964-01-21 Acid Treatment 2297.3 2297.3 0
1965-11-11 Packing Device Capped w/Cement 2255.5 2263.4 0
1965-11-11 Hydra Jet Perforation 1774.2 1776.7 0
1965-11-11 Hydra Jet Perforation 1777.6 1777.6 0
1965-11-12 Acid Treatment 1774.2 1777.6 0
1965-11-12 Fracture 1774.2 1777.6 0
1970-01-06 Cement Squeeze 1773.9 1777.9 0
1970-01-06 Hydra Jet Perforation 2297.3 2297.3 0
1989-09-28 Acid Treatment 2297.3 2297.3 0
1993-01-21 Perforation 2294.5 2295.8 13
1993-01-25 Acid Treatment 2294.5 2297.3 0
1993-02-04 Perforation 2290.6 2293.6 13
1994-06-15 Acid Treatment 2290.6 2297.3 0
1996-02-06 Perforation 1772.4 1778.4 17
1996-02-09 Fracture 1772.4 1778.4 0
1998-09-25 Packing Device Capped w/Cement 2256 2264 0
1998-09-25 Packing Device Capped w/Cement 1757 1765 0
1998-09-25 Perforation 511.8 512.8 13
1998-09-26 Remedial Casing Cementing 511.8 512.8 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 2.8 0.0 0.0
1966 0 20.4 0.0 0.0
1967 0 14.6 0.0 0.0
1968 2520 16.5 0.0 0.0
1969 2064 7.2 0.0 0.0
1970 168 245.6 0.0 0.0

For data sources see[4]

References