X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0355061510000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0355061510000
 
| Well ID: 0355061510000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.00895900000000438, -114.77066499999995131 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.008959, -114.770665 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-15-035-06W5/0
 
| Location: 00/10-15-035-06W5/0
 +
|-
 +
| Location Alias: 00/10-15-35-06 W5M
 +
|-
 +
| Location Alias 2: 00/10-15-035-06 W5/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Clearwater County,_Alberta|Clearwater County]]
 
|-
 
|-
 
| Well Name: PWEI ET AL CAROLINE 10-15-35-6
 
| Well Name: PWEI ET AL CAROLINE 10-15-35-6
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0053642
 
|-
 
|-
 
| License Date: 1975-05-26
 
| License Date: 1975-05-26
 
|-
 
|-
| Final Drilling Date: 1975-06-20
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1975-06-03
 +
|-
 +
| Final Drill Date: 1975-06-20
 +
|-
 +
| Well Total Depth: 2674.6 m
 +
|-
 +
| Surface Hole Latitude: 52.008959
 +
|-
 +
| Surface Hole Longitude: -114.770665
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Total Depth: 2674.6m
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Fluid Type: Crude Oil
+
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
| Status: Abandoned
+
| 1975-07-09
 +
| Perforation
 +
| style="text-align: right;" | 2642.6
 +
| style="text-align: right;" | 2645.4
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Well Type: Not Applicable
+
| 1975-07-09
 +
| Perforation
 +
| style="text-align: right;" | 2649
 +
| style="text-align: right;" | 2652.4
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 1975-07-26
 +
| Acid Treatment
 +
| style="text-align: right;" | 2642.6
 +
| style="text-align: right;" | 2652.4
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 52.00895900000000438
+
| 1975-07-26
 +
| Fracture
 +
| style="text-align: right;" | 2642.6
 +
| style="text-align: right;" | 2652.4
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -114.77066499999995131
+
| 2007-06-28
 +
| Perforation
 +
| style="text-align: right;" | 2642.6
 +
| style="text-align: right;" | 2645.4
 +
| style="text-align: right;" | 17
 
|-
 
|-
 +
| 2007-07-03
 +
| Acid Treatment
 +
| style="text-align: right;" | 2642.6
 +
| style="text-align: right;" | 2652.4
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-07-30
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2629
 +
| style="text-align: right;" | 2637
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2621
 +
| style="text-align: right;" | 2629
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-04
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1943
 +
| style="text-align: right;" | 1955
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-04
 +
| Perforation
 +
| style="text-align: right;" | 1942
 +
| style="text-align: right;" | 1943
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-04
 +
| Perforation
 +
| style="text-align: right;" | 1675
 +
| style="text-align: right;" | 1676
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-06
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1942
 +
| style="text-align: right;" | 1943
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-06
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1928
 +
| style="text-align: right;" | 1937
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1676
 +
| style="text-align: right;" | 1679
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-07
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1675
 +
| style="text-align: right;" | 1676
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1640
 +
| style="text-align: right;" | 1650
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1593
 +
| style="text-align: right;" | 1600
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-09
 +
| Perforation
 +
| style="text-align: right;" | 1592
 +
| style="text-align: right;" | 1593
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-09
 +
| Perforation
 +
| style="text-align: right;" | 1475
 +
| style="text-align: right;" | 1476
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-10
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1592
 +
| style="text-align: right;" | 1593
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-10
 +
| Cement Plug
 +
| style="text-align: right;" | 1476
 +
| style="text-align: right;" | 1592
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-10
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1475
 +
| style="text-align: right;" | 1476
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-10
 +
| Cement Plug
 +
| style="text-align: right;" | 1460
 +
| style="text-align: right;" | 1475
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1206
 +
| style="text-align: right;" | 1215
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-11
 +
| Perforation
 +
| style="text-align: right;" | 1205
 +
| style="text-align: right;" | 1206
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-11
 +
| Perforation
 +
| style="text-align: right;" | 975
 +
| style="text-align: right;" | 976
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1205
 +
| style="text-align: right;" | 1206
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1187
 +
| style="text-align: right;" | 1197
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 976
 +
| style="text-align: right;" | 986
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-13
 +
| Cement Squeeze
 +
| style="text-align: right;" | 975
 +
| style="text-align: right;" | 976
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 955
 +
| style="text-align: right;" | 965
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-14
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 679
 +
| style="text-align: right;" | 685
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-14
 +
| Perforation
 +
| style="text-align: right;" | 678
 +
| style="text-align: right;" | 679
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-14
 +
| Perforation
 +
| style="text-align: right;" | 405
 +
| style="text-align: right;" | 406
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-15
 +
| Perforation
 +
| style="text-align: right;" | 639
 +
| style="text-align: right;" | 640
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-15
 +
| Perforation
 +
| style="text-align: right;" | 565
 +
| style="text-align: right;" | 566
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-09-16
 +
| Cement Plug
 +
| style="text-align: right;" | 591
 +
| style="text-align: right;" | 685
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-18
 +
| Cement Squeeze
 +
| style="text-align: right;" | 565
 +
| style="text-align: right;" | 566
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 540
 +
| style="text-align: right;" | 560
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-18
 +
| Cement Squeeze
 +
| style="text-align: right;" | 405
 +
| style="text-align: right;" | 406
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-09-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 380
 +
| style="text-align: right;" | 400
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1975
 +
| style="text-align: right;" | 2952
 +
| style="text-align: right;" | 296.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1976
 +
| style="text-align: right;" | 8716
 +
| style="text-align: right;" | 896.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1977
 +
| style="text-align: right;" | 7741
 +
| style="text-align: right;" | 861.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1978
 +
| style="text-align: right;" | 8410
 +
| style="text-align: right;" | 480.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1979
 +
| style="text-align: right;" | 7346
 +
| style="text-align: right;" | 496.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1980
 +
| style="text-align: right;" | 8201
 +
| style="text-align: right;" | 349.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1981
 +
| style="text-align: right;" | 8135
 +
| style="text-align: right;" | 479.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1982
 +
| style="text-align: right;" | 8566
 +
| style="text-align: right;" | 386.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1983
 +
| style="text-align: right;" | 7066
 +
| style="text-align: right;" | 452.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1984
 +
| style="text-align: right;" | 8567
 +
| style="text-align: right;" | 607.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1985
 +
| style="text-align: right;" | 8407
 +
| style="text-align: right;" | 568.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1986
 +
| style="text-align: right;" | 8356
 +
| style="text-align: right;" | 381.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1987
 +
| style="text-align: right;" | 8231
 +
| style="text-align: right;" | 516.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1988
 +
| style="text-align: right;" | 8674
 +
| style="text-align: right;" | 506.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1989
 +
| style="text-align: right;" | 8059
 +
| style="text-align: right;" | 514.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1990
 +
| style="text-align: right;" | 8099
 +
| style="text-align: right;" | 222.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 2.9
 +
|-
 +
| 1991
 +
| style="text-align: right;" | 5456
 +
| style="text-align: right;" | 265.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-04-24
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2013-08-13
 +
| No Incident
 +
| style="text-align: right;" | N/A
 +
| style="text-align: right;" | N/A
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-05-09
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 18:57, 7 June 2019

Well Details

Well ID: 0355061510000
Loading map...
Location: 00/10-15-035-06W5/0
Location Alias: 00/10-15-35-06 W5M
Location Alias 2: 00/10-15-035-06 W5/00
Province: Alberta
County/Municipality: Clearwater County
Well Name: PWEI ET AL CAROLINE 10-15-35-6
Operator Name:
License Number: 0053642
License Date: 1975-05-26
License Status: Abandoned
Spud Date: 1975-06-03
Final Drill Date: 1975-06-20
Well Total Depth: 2674.6 m
Surface Hole Latitude: 52.008959
Surface Hole Longitude: -114.770665

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-09 Perforation 2642.6 2645.4 13
1975-07-09 Perforation 2649 2652.4 13
1975-07-26 Acid Treatment 2642.6 2652.4 0
1975-07-26 Fracture 2642.6 2652.4 0
2007-06-28 Perforation 2642.6 2645.4 17
2007-07-03 Acid Treatment 2642.6 2652.4 0
2008-07-30 Packing Device Capped w/Cement 2629 2637 0
2013-08-13 Packing Device Capped w/Cement 2621 2629 0
2013-09-04 Packing Device Capped w/Cement 1943 1955 0
2013-09-04 Perforation 1942 1943 17
2013-09-04 Perforation 1675 1676 17
2013-09-06 Cement Squeeze 1942 1943 0
2013-09-06 Packing Device Capped w/Cement 1928 1937 0
2013-09-07 Packing Device Capped w/Cement 1676 1679 0
2013-09-07 Cement Squeeze 1675 1676 0
2013-09-07 Packing Device Capped w/Cement 1640 1650 0
2013-09-09 Packing Device Capped w/Cement 1593 1600 0
2013-09-09 Perforation 1592 1593 17
2013-09-09 Perforation 1475 1476 17
2013-09-10 Cement Squeeze 1592 1593 0
2013-09-10 Cement Plug 1476 1592 0
2013-09-10 Cement Squeeze 1475 1476 0
2013-09-10 Cement Plug 1460 1475 0
2013-09-11 Packing Device Capped w/Cement 1206 1215 0
2013-09-11 Perforation 1205 1206 17
2013-09-11 Perforation 975 976 17
2013-09-12 Cement Squeeze 1205 1206 0
2013-09-12 Packing Device Capped w/Cement 1187 1197 0
2013-09-13 Packing Device Capped w/Cement 976 986 0
2013-09-13 Cement Squeeze 975 976 0
2013-09-13 Packing Device Capped w/Cement 955 965 0
2013-09-14 Packing Device Capped w/Cement 679 685 0
2013-09-14 Perforation 678 679 17
2013-09-14 Perforation 405 406 17
2013-09-15 Perforation 639 640 17
2013-09-15 Perforation 565 566 17
2013-09-16 Cement Plug 591 685 0
2013-09-18 Cement Squeeze 565 566 0
2013-09-18 Packing Device Capped w/Cement 540 560 0
2013-09-18 Cement Squeeze 405 406 0
2013-09-18 Packing Device Capped w/Cement 380 400 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 2952 296.9 0.0 0.0
1976 8716 896.3 0.0 0.0
1977 7741 861.3 0.0 0.0
1978 8410 480.0 0.0 0.0
1979 7346 496.7 0.0 0.0
1980 8201 349.8 0.0 0.0
1981 8135 479.4 0.0 0.0
1982 8566 386.7 0.0 0.0
1983 7066 452.2 0.0 0.0
1984 8567 607.0 0.0 0.0
1985 8407 568.9 0.0 0.0
1986 8356 381.1 0.0 0.0
1987 8231 516.2 0.0 0.0
1988 8674 506.3 0.0 0.0
1989 8059 514.9 0.0 0.0
1990 8099 222.6 0.0 2.9
1991 5456 265.8 0.0 0.0

For data sources see[4]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-13 No Incident N/A N/A

For data sources see[5]

References