| Well ID: 34-167-29726
 
| Well ID: 34-167-29726
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.6164915628, -81.4176695466 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.61649156, -81.41766955 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Washington County, Ohio|Washington]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[TRIAD HUNTER  LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-06-21
 
| Spud Date: 2013-06-21
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Well Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.6164915628
+
| Latitude: 39.61649156
 
|-
 
|-
| Longitude: -81.4176695466
+
| Longitude: -81.41766955
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1173292565
 +
| 2013-07-03
 +
|
 +
| Witnessed the cementing of the 13.375 casing.  Universal did the cementing.  Good circulation and good returns were observed at the surface. Mr. Ray Decker and Mr. Sparky Bare were on site.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1285088614
 
| -1285088614
 
| 2013-08-05
 
| 2013-08-05
|
+
|  
 
| Company has been pumping water out of this well to use for fracing.  They have a mega tank assembled on the pad.  It is about 2/3 full.  Accompanied on inspection by permitting geologist Rick Cisler, Kenny Brown, and intern Andrew Destocki.
 
| Company has been pumping water out of this well to use for fracing.  They have a mega tank assembled on the pad.  It is about 2/3 full.  Accompanied on inspection by permitting geologist Rick Cisler, Kenny Brown, and intern Andrew Destocki.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1372081252
 +
| 2013-06-22
 +
|
 +
| Express energy drill a 36''open hole to 42' and then a 32' on to 100'. The rig then installed 26''casing at 100lb/ft. Ran to a depth of 100'. Mixed 355 sacks of class A cement . Displaced with 55 barrel of fersh water. Good slurry returns.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1475387545
 
| -1475387545
 
| 2013-07-11
 
| 2013-07-11
|
+
|  
 
| Rig and support completely moved off of site.  Tank battery not constructed yet.  Panels are on site and ready to put together for tank battery.  New GPS taken at well head.
 
| Rig and support completely moved off of site.  Tank battery not constructed yet.  Panels are on site and ready to put together for tank battery.  New GPS taken at well head.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1960432084
 
| -1960432084
 
| 2013-06-29
 
| 2013-06-29
|
+
|  
 
| Witnessed the cementing of the surface casing.  375 feet of 20 inch pipe was ran in 390 feet of 24 inch hole.  Good circulation was achieved throughout the whole job.  Good returns were observed at the surface.  There were no chlorides detected in the mix water.
 
| Witnessed the cementing of the surface casing.  375 feet of 20 inch pipe was ran in 390 feet of 24 inch hole.  Good circulation was achieved throughout the whole job.  Good returns were observed at the surface.  There were no chlorides detected in the mix water.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1987766182
 
| -1987766182
 
| 2013-07-02
 
| 2013-07-02
|
+
|  
 
| Rig was shut down again due to the waste handlers.  Depth at the time of inspection was 1080 feet.  Spoke with Mr. Ray Decker on site.  I tested the mix water for the upcoming cement job.  It tested at 5.4 with a low range quantab.  That means 336 parts per million chlorides.  I notified Mr. Decker of this, and he opted to bring different freshwater haulers and test their water for chlorides.
 
| Rig was shut down again due to the waste handlers.  Depth at the time of inspection was 1080 feet.  Spoke with Mr. Ray Decker on site.  I tested the mix water for the upcoming cement job.  It tested at 5.4 with a low range quantab.  That means 336 parts per million chlorides.  I notified Mr. Decker of this, and he opted to bring different freshwater haulers and test their water for chlorides.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1173292565
 
| 2013-07-03
 
|
 
| Witnessed the cementing of the 13.375" casing.  Universal did the cementing.  Good circulation and good returns were observed at the surface. Mr. Ray Decker and Mr. Sparky Bare were on site.
 
|
 
|
 
|
 
|-
 
|-
 
| 1372081252
 
| 2013-06-22
 
|
 
| Express energy drill a 36''open hole to 42' and then a 32' on to 100'. The rig then installed 26''casing at 100lb/ft. Ran to a depth of 100'. Mixed 355 sacks of class A cement . Displaced with 55 barrel of fersh water. Good slurry returns.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 2020751561
 
| 2020751561
 
| 2013-06-26
 
| 2013-06-26
|
+
|  
 
| Rig modifications and repairs were being made at the time of inspection.  Spoke with Mr Ray Decker on site.  He stated that rig had sat for 6 months and the hoses needed replaced.  They also had to plumb everything up for the closed loop system.
 
| Rig modifications and repairs were being made at the time of inspection.  Spoke with Mr Ray Decker on site.  He stated that rig had sat for 6 months and the hoses needed replaced.  They also had to plumb everything up for the closed loop system.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:23, 16 July 2015

Well Details

Well ID: 34-167-29726
Loading map...
County: Washington
Municipality:
Operator Name: TRIAD HUNTER LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-06-21
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 39.61649156
Longitude: -81.41766955

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1173292565 2013-07-03 Witnessed the cementing of the 13.375 casing. Universal did the cementing. Good circulation and good returns were observed at the surface. Mr. Ray Decker and Mr. Sparky Bare were on site.
-1285088614 2013-08-05 Company has been pumping water out of this well to use for fracing. They have a mega tank assembled on the pad. It is about 2/3 full. Accompanied on inspection by permitting geologist Rick Cisler, Kenny Brown, and intern Andrew Destocki.
1372081252 2013-06-22 Express energy drill a 36open hole to 42' and then a 32' on to 100'. The rig then installed 26casing at 100lb/ft. Ran to a depth of 100'. Mixed 355 sacks of class A cement . Displaced with 55 barrel of fersh water. Good slurry returns.
-1475387545 2013-07-11 Rig and support completely moved off of site. Tank battery not constructed yet. Panels are on site and ready to put together for tank battery. New GPS taken at well head.
-1960432084 2013-06-29 Witnessed the cementing of the surface casing. 375 feet of 20 inch pipe was ran in 390 feet of 24 inch hole. Good circulation was achieved throughout the whole job. Good returns were observed at the surface. There were no chlorides detected in the mix water.
-1987766182 2013-07-02 Rig was shut down again due to the waste handlers. Depth at the time of inspection was 1080 feet. Spoke with Mr. Ray Decker on site. I tested the mix water for the upcoming cement job. It tested at 5.4 with a low range quantab. That means 336 parts per million chlorides. I notified Mr. Decker of this, and he opted to bring different freshwater haulers and test their water for chlorides.
2020751561 2013-06-26 Rig modifications and repairs were being made at the time of inspection. Spoke with Mr Ray Decker on site. He stated that rig had sat for 6 months and the hoses needed replaced. They also had to plumb everything up for the closed loop system.