X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-067-21205"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-067-21205
 
| Well ID: 34-067-21205
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.3598124535, -81.0596086136 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.35981245, -81.05960861 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Harrison County, Ohio|Harrison]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-08-12
 
| Spud Date: 2013-08-12
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Well Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.3598124535
+
| Latitude: 40.35981245
 
|-
 
|-
| Longitude: -81.0596086136
+
| Longitude: -81.05960861
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1376314626
 +
| 2013-08-12
 +
|
 +
| Precision Drilling is drilling the conductor today and should be ready to cement tonight or Tues.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1523897671
 
| -1523897671
 
| 2013-08-09
 
| 2013-08-09
|
+
|  
 
| I was advised that Chesapeake would be moving Top Hole equipment on site today to drill 6 conductor holes and would begin cementing them on Sunday and Monday. I arrived today to find  that the equipment is arriving on site but has not been set up to drill at this time.
 
| I was advised that Chesapeake would be moving Top Hole equipment on site today to drill 6 conductor holes and would begin cementing them on Sunday and Monday. I arrived today to find  that the equipment is arriving on site but has not been set up to drill at this time.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1376314626
 
| 2013-08-12
 
|
 
| Precision Drilling is drilling the conductor today and should be ready to cement tonight or Tues.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1580422285
 
| 1580422285
 
| 2014-08-26
 
| 2014-08-26
|
+
|  
| Total depth 607'.  The rig ran 19 joints of 13-3/8" 54.5 # R-3 casing and the associated float equipment to 600'.  Schlumberger cemented with 580 sacks of Class A cement.  See the casing ticket for the details.
+
| Total depth 607'.  The rig ran 19 joints of 13-3/8 54.5 # R-3 casing and the associated float equipment to 600'.  Schlumberger cemented with 580 sacks of Class A cement.  See the casing ticket for the details.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 79737674
 
| 79737674
 
| 2014-09-02
 
| 2014-09-02
|
+
|  
 
| Drilling ahead in the lateral at 13400'.  The containment issues have been mostly corrected.  Went around with the company man and identified a couple of corners that were not secure and one area in the highly traveled area in front of the V-door that was broken down and had not yet been repaired.  The repairs will be made.  No improper fluids had leaked from the containment.  This was a preventative exercise.
 
| Drilling ahead in the lateral at 13400'.  The containment issues have been mostly corrected.  Went around with the company man and identified a couple of corners that were not secure and one area in the highly traveled area in front of the V-door that was broken down and had not yet been repaired.  The repairs will be made.  No improper fluids had leaked from the containment.  This was a preventative exercise.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 07:01, 15 July 2015

Well Details

Well ID: 34-067-21205
Loading map...
County: Harrison
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-08-12
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 40.35981245
Longitude: -81.05960861

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1376314626 2013-08-12 Precision Drilling is drilling the conductor today and should be ready to cement tonight or Tues.
-1523897671 2013-08-09 I was advised that Chesapeake would be moving Top Hole equipment on site today to drill 6 conductor holes and would begin cementing them on Sunday and Monday. I arrived today to find that the equipment is arriving on site but has not been set up to drill at this time.
1580422285 2014-08-26 Total depth 607'. The rig ran 19 joints of 13-3/8 54.5 # R-3 casing and the associated float equipment to 600'. Schlumberger cemented with 580 sacks of Class A cement. See the casing ticket for the details.
79737674 2014-09-02 Drilling ahead in the lateral at 13400'. The containment issues have been mostly corrected. Went around with the company man and identified a couple of corners that were not secure and one area in the highly traveled area in front of the V-door that was broken down and had not yet been repaired. The repairs will be made. No improper fluids had leaked from the containment. This was a preventative exercise.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.