| Well ID: 34-079-20268
 
| Well ID: 34-079-20268
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.0616108885, -82.508573055 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.06161089, -82.50857306 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Jackson County, Ohio|Jackson]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[TOMSTAN DRILLING COMPANY]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date: 2009-03-09
+
| Spud Date: 2009-01-16
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
| Violations: 4
+
| Violations: 0
 
|-
 
|-
| Latitude: 39.0616108885
+
| Latitude: 39.06161089
 
|-
 
|-
| Longitude: -82.508573055
+
| Longitude: -82.50857306
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 111.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 530.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 353.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1097625829
 +
| 2009-04-08
 +
|
 +
| Mud pit is over flowing. I talked to Stan Holler and he has Barry Bowers scheduled to start pit closures and restorations on 4-9-09. I called Barry and confirmed that he is sending men to site on 4-9-09.
 +
|
 +
|
 +
| Phone Call
 +
|-
 +
|-
 +
| 1097625829
 +
| 2009-04-08
 +
|
 +
| Mud pit is over flowing. I talked to Stan Holler and he has Barry Bowers scheduled to start pit closures and restorations on 4-9-09. I called Barry and confirmed that he is sending men to site on 4-9-09.
 +
|
 +
|
 +
| Phone Call
 +
|-
 
|-
 
|-
 
| -1224945161
 
| -1224945161
 
| 2009-12-14
 
| 2009-12-14
|
+
|  
 
| No identification. No production equipment or production lines. Stan Holler (well owner) is bidding out the production line work and has not started on the project yet. Stan has asked if he could install the id at the same time as the production equipment and production lines. I called Stan and have requested a written time line for when the wells will be in production.
 
| No identification. No production equipment or production lines. Stan Holler (well owner) is bidding out the production line work and has not started on the project yet. Stan has asked if he could install the id at the same time as the production equipment and production lines. I called Stan and have requested a written time line for when the wells will be in production.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1240421537
 +
| 2009-03-03
 +
|
 +
| Kilbarger is building the location today. They have proposed to place the drill pit across the AML drainage channel. Proposed pit location is GPS N39.06153 /W082.50832. Will dig a test hole to see status of soil and ground water. Took pictures.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1249063239
 +
| 2009-04-29
 +
|
 +
| Pit was solidified on 4-28-09. Pit still had 35 bbls of brine in it. Cement has not set up in pit. I stopped the pit closure until fluids could be extracted and taken to injection well. ALNA Energy water truck UIC -25-367 ( 740-621-1472) extracted 35 bbls and took it to Junction city injection well. Pit liner is compromised and leaking brine. Deer have excavated an area around the perimeter of the dike 40' by 4' by 6 deep.  High End Quantab of the pit water read 9 on the strip. 8.4 on strip is 6731 ppm cl. Exceeded the chart on the Quantab bottle. A Quantab of the seep read 3.6 on high end Quantab is 884 ppm cl.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1331153255
 
| -1331153255
 
| 2009-03-13
 
| 2009-03-13
|
+
|  
 
| Follow up phone call to Stan Holler on the plug back. TD 1951 feet. Plugged back to 1082 feet.
 
| Follow up phone call to Stan Holler on the plug back. TD 1951 feet. Plugged back to 1082 feet.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1357162736
 
| -1357162736
 
| 2009-10-08
 
| 2009-10-08
|
+
|  
 
| This is the horizontal portion of well # 34-079-20268. Preliminary Restoration passed on 10-8-09
 
| This is the horizontal portion of well # 34-079-20268. Preliminary Restoration passed on 10-8-09
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1406533325
 
| -1406533325
 
| 2009-03-09
 
| 2009-03-09
|
+
|  
 
| 30 feet of 11 3/4 inch conductor has been set in a 17 inch hole. Rigging up to drill on air for surface. Air pit has been finished and lined. Pumped drill mud behind the pit liner. I verified from Gerald Smith (Tool pusher) that water trucks are lined up to pump the # 5 pits on 3-10-09.
 
| 30 feet of 11 3/4 inch conductor has been set in a 17 inch hole. Rigging up to drill on air for surface. Air pit has been finished and lined. Pumped drill mud behind the pit liner. I verified from Gerald Smith (Tool pusher) that water trucks are lined up to pump the # 5 pits on 3-10-09.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1420637504
 +
| 2010-08-24
 +
|
 +
| Pump jack being installed on well. Well is equipped with rods and tubing. Gas engine. No identification.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -167390507
 
| -167390507
 
| 2012-09-26
 
| 2012-09-26
|
+
|  
 
| Well was shut-in which may explain the minor leaks.  Checked gas coming out of the wiper packer assembly at the top of the wellhead with the Honeywell PhD/PID.  Measured 1.6 meter reading units and the LEL level was exceeded and alarmed.  So it confirmed CH4 was coming out of the well.  Called Stanley Holler, owner of Tomstan Drilling.  He promised he would check on it this Thursday.  He notified me on Thursday that he corrected the problem and there are now no leaks.  I will check it before I go home.
 
| Well was shut-in which may explain the minor leaks.  Checked gas coming out of the wiper packer assembly at the top of the wellhead with the Honeywell PhD/PID.  Measured 1.6 meter reading units and the LEL level was exceeded and alarmed.  So it confirmed CH4 was coming out of the well.  Called Stanley Holler, owner of Tomstan Drilling.  He promised he would check on it this Thursday.  He notified me on Thursday that he corrected the problem and there are now no leaks.  I will check it before I go home.
|
+
|  
| 9-9-05(B)
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| -167390507
+
| 1825447577
| 2012-09-26
+
| 2009-05-20
|
+
|  
| Well was shut-in which may explain the minor leaks. Checked gas coming out of the wiper packer assembly at the top of the wellhead with the Honeywell PhD/PID. Measured 1.6 meter reading units and the LEL level was exceeded and alarmed.  So it confirmed CH4 was coming out of the well.  Called Stanley Holler, owner of Tomstan Drilling.  He promised he would check on it this Thursday.  He notified me on Thursday that he corrected the problem and there are now no leaks. I will check it before I go home.
+
| Location has been graded. Can see some toxic material from mining operations at the surface. No seed or mulch applied to site. No Gas line or production equipment. No identification.
|
+
|  
| NONE18
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1909061640
 
| -1909061640
 
| 2009-03-10
 
| 2009-03-10
|
+
|  
 
| Surface Cement Job. Spud 3-9-09. 30 feet of 11 3/4 inch conductor set in 17 inch hole.  TD 1129 feet drilled an 11 inch hole. 8 5/8 inch Surface casing set at 1105 feet in an 11 inch hole. Cement basket set 2 joints down from surface. Centralizer set on 4th joint in hole from the bottom. Had good circulation, Good cement returns to surface. Cement fell back 15 feet and was grouted to the surface. Cement stayed at surface.
 
| Surface Cement Job. Spud 3-9-09. 30 feet of 11 3/4 inch conductor set in 17 inch hole.  TD 1129 feet drilled an 11 inch hole. 8 5/8 inch Surface casing set at 1105 feet in an 11 inch hole. Cement basket set 2 joints down from surface. Centralizer set on 4th joint in hole from the bottom. Had good circulation, Good cement returns to surface. Cement fell back 15 feet and was grouted to the surface. Cement stayed at surface.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -535540436
 
| 2009-03-06
 
|
 
| Kilbarger is digging test pits for pit locations. Proposed pit across AML ditch will not work hit slurry at 4 feet. Pit will have to be with in the Sediment fence perimeter. Pit will be built up on the sides to prevent going to deep on the AML reclamation site.
 
|
 
|
 
|
 
|-
 
|-
 
| 1097625829
 
| 2009-04-08
 
|
 
| Mud pit is over flowing. I talked to Stan Holler and he has Barry Bowers scheduled to start pit closures and restorations on 4-9-09. I called Barry and confirmed that he is sending men to site on 4-9-09.
 
|
 
|
 
|
 
|-
 
|-
 
| 1240421537
 
| 2009-03-03
 
|
 
| Kilbarger is building the location today. They have proposed to place the drill pit across the AML drainage channel. Proposed pit location is GPS N39.06153 /W082.50832. Will dig a test hole to see status of soil and ground water. Took pictures.
 
|
 
|
 
|
 
|-
 
|-
 
| 1249063239
 
| 2009-04-29
 
|
 
| Pit was solidified on 4-28-09. Pit still had 35 bbls of brine in it. Cement has not set up in pit. I stopped the pit closure until fluids could be extracted and taken to injection well. ALNA Energy water truck UIC -25-367 ( 740-621-1472) extracted 35 bbls and took it to Junction city injection well. Pit liner is compromised and leaking brine. Deer have excavated an area around the perimeter of the dike 40' by 4' by 6" deep.  High End Quantab of the pit water read 9 on the strip. 8.4 on strip is 6731 ppm cl. Exceeded the chart on the Quantab bottle. A Quantab of the seep read 3.6 on high end Quantab is 884 ppm cl.
 
|
 
|
 
|
 
|-
 
|-
 
| 1420637504
 
| 2010-08-24
 
|
 
| Pump jack being installed on well. Well is equipped with rods and tubing. Gas engine. No identification.
 
|
 
|
 
|
 
|-
 
|-
 
| 1825447577
 
| 2009-05-20
 
|
 
| Location has been graded. Can see some toxic material from mining operations at the surface. No seed or mulch applied to site. No Gas line or production equipment. No identification.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1983120282
 
| 1983120282
 
| 2009-04-28
 
| 2009-04-28
|
+
|  
 
| Solidify pit with bulk cement from Schlumberger. 150 sacs.
 
| Solidify pit with bulk cement from Schlumberger. 150 sacs.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 342989040
 
| 342989040
 
| 2012-09-27
 
| 2012-09-27
|
+
|  
 
| Well was found to have a slight leak on 09.26.2012.  Owner came out and tightened bolts around packer assembly.  Not leaks found by myself today. Raining really hard.  Difficult to travel on these dirt roads.  Went back to Altheirs Oil McKell and waited for rain to quit.
 
| Well was found to have a slight leak on 09.26.2012.  Owner came out and tightened bolts around packer assembly.  Not leaks found by myself today. Raining really hard.  Difficult to travel on these dirt roads.  Went back to Altheirs Oil McKell and waited for rain to quit.
|
+
|  
| 9-9-05(B)
+
|  
|
+
|  
|-
 
|-
 
| 342989040
 
| 2012-09-27
 
|
 
| Well was found to have a slight leak on 09.26.2012.  Owner came out and tightened bolts around packer assembly.  Not leaks found by myself today. Raining really hard.  Difficult to travel on these dirt roads.  Went back to Altheirs Oil McKell and waited for rain to quit.
 
|
 
| NONE18
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 346380890
 
| 346380890
 
| 2009-08-10
 
| 2009-08-10
|
+
|  
 
| Good vegetative cover on well site. Access road is stone 3/4 of the way. No erosion at this time. I called Stan Holler at 9:30am and we discussed the need to identify well and equip well for production.
 
| Good vegetative cover on well site. Access road is stone 3/4 of the way. No erosion at this time. I called Stan Holler at 9:30am and we discussed the need to identify well and equip well for production.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -535540436
 +
| 2009-03-06
 +
|
 +
| Kilbarger is digging test pits for pit locations. Proposed pit across AML ditch will not work hit slurry at 4 feet. Pit will have to be with in the Sediment fence perimeter. Pit will be built up on the sides to prevent going to deep on the AML reclamation site.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 99872742
 
| 99872742
 
| 2009-10-08
 
| 2009-10-08
|
+
|  
 
| Good vegetative cover on location. No identification, No production equipment or production lines. I called Stan Holler Well owner and Stan has asked to be allowed to install the id when he installs the production lines. I agreed as long as it happens soon.
 
| Good vegetative cover on location. No identification, No production equipment or production lines. I called Stan Holler Well owner and Stan has asked to be allowed to install the id when he installs the production lines. I agreed as long as it happens soon.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 03:14, 15 July 2015

Well Details

Well ID: 34-079-20268
Loading map...
County: Jackson
Municipality:
Operator Name: TOMSTAN DRILLING COMPANY
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-01-16
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.06161089
Longitude: -82.50857306

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 111.0 0.0
2011-0 530.0 0.0
2012-0 353.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1097625829 2009-04-08 Mud pit is over flowing. I talked to Stan Holler and he has Barry Bowers scheduled to start pit closures and restorations on 4-9-09. I called Barry and confirmed that he is sending men to site on 4-9-09. Phone Call
1097625829 2009-04-08 Mud pit is over flowing. I talked to Stan Holler and he has Barry Bowers scheduled to start pit closures and restorations on 4-9-09. I called Barry and confirmed that he is sending men to site on 4-9-09. Phone Call
-1224945161 2009-12-14 No identification. No production equipment or production lines. Stan Holler (well owner) is bidding out the production line work and has not started on the project yet. Stan has asked if he could install the id at the same time as the production equipment and production lines. I called Stan and have requested a written time line for when the wells will be in production.
1240421537 2009-03-03 Kilbarger is building the location today. They have proposed to place the drill pit across the AML drainage channel. Proposed pit location is GPS N39.06153 /W082.50832. Will dig a test hole to see status of soil and ground water. Took pictures.
1249063239 2009-04-29 Pit was solidified on 4-28-09. Pit still had 35 bbls of brine in it. Cement has not set up in pit. I stopped the pit closure until fluids could be extracted and taken to injection well. ALNA Energy water truck UIC -25-367 ( 740-621-1472) extracted 35 bbls and took it to Junction city injection well. Pit liner is compromised and leaking brine. Deer have excavated an area around the perimeter of the dike 40' by 4' by 6 deep. High End Quantab of the pit water read 9 on the strip. 8.4 on strip is 6731 ppm cl. Exceeded the chart on the Quantab bottle. A Quantab of the seep read 3.6 on high end Quantab is 884 ppm cl.
-1331153255 2009-03-13 Follow up phone call to Stan Holler on the plug back. TD 1951 feet. Plugged back to 1082 feet.
-1357162736 2009-10-08 This is the horizontal portion of well # 34-079-20268. Preliminary Restoration passed on 10-8-09
-1406533325 2009-03-09 30 feet of 11 3/4 inch conductor has been set in a 17 inch hole. Rigging up to drill on air for surface. Air pit has been finished and lined. Pumped drill mud behind the pit liner. I verified from Gerald Smith (Tool pusher) that water trucks are lined up to pump the # 5 pits on 3-10-09.
1420637504 2010-08-24 Pump jack being installed on well. Well is equipped with rods and tubing. Gas engine. No identification.
-167390507 2012-09-26 Well was shut-in which may explain the minor leaks. Checked gas coming out of the wiper packer assembly at the top of the wellhead with the Honeywell PhD/PID. Measured 1.6 meter reading units and the LEL level was exceeded and alarmed. So it confirmed CH4 was coming out of the well. Called Stanley Holler, owner of Tomstan Drilling. He promised he would check on it this Thursday. He notified me on Thursday that he corrected the problem and there are now no leaks. I will check it before I go home.
1825447577 2009-05-20 Location has been graded. Can see some toxic material from mining operations at the surface. No seed or mulch applied to site. No Gas line or production equipment. No identification.
-1909061640 2009-03-10 Surface Cement Job. Spud 3-9-09. 30 feet of 11 3/4 inch conductor set in 17 inch hole. TD 1129 feet drilled an 11 inch hole. 8 5/8 inch Surface casing set at 1105 feet in an 11 inch hole. Cement basket set 2 joints down from surface. Centralizer set on 4th joint in hole from the bottom. Had good circulation, Good cement returns to surface. Cement fell back 15 feet and was grouted to the surface. Cement stayed at surface.
1983120282 2009-04-28 Solidify pit with bulk cement from Schlumberger. 150 sacs.
342989040 2012-09-27 Well was found to have a slight leak on 09.26.2012. Owner came out and tightened bolts around packer assembly. Not leaks found by myself today. Raining really hard. Difficult to travel on these dirt roads. Went back to Altheirs Oil McKell and waited for rain to quit.
346380890 2009-08-10 Good vegetative cover on well site. Access road is stone 3/4 of the way. No erosion at this time. I called Stan Holler at 9:30am and we discussed the need to identify well and equip well for production.
-535540436 2009-03-06 Kilbarger is digging test pits for pit locations. Proposed pit across AML ditch will not work hit slurry at 4 feet. Pit will have to be with in the Sediment fence perimeter. Pit will be built up on the sides to prevent going to deep on the AML reclamation site.
99872742 2009-10-08 Good vegetative cover on location. No identification, No production equipment or production lines. I called Stan Holler Well owner and Stan has asked to be allowed to install the id when he installs the production lines. I agreed as long as it happens soon.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.