X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24468"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-24468
 
| Well ID: 34-111-24468
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.7074446322, -81.2499136648 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.70744463, -81.24991366 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Monroe County, Ohio|Monroe]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[HALL DRILLING LLC (OIL & GAS)]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-05-02
 
| Spud Date: 2014-05-02
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Well Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.7074446322
+
| Latitude: 39.70744463
 
|-
 
|-
| Longitude: -81.2499136648
+
| Longitude: -81.24991366
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| 1399314709
 
| 1399314709
 
| 2014-05-05
 
| 2014-05-05
|
+
|  
| The said well was spudded on 05/02/2014 by Zigenfoose Inc top hole rig with 100' of 24'' conductor being set with no annular space, on this day I found the current drilling depth to be 440' using a 22.875'' diameter drill bit in the surface borehole well bore section with a projected total depth to be drilled of 500'. I shall GPS the well head when we cement the surface pipe.
+
| The said well was spudded on 05/02/2014 by Zigenfoose Inc top hole rig with 100' of 24'' conductor being set with no annular space, on this day I found the current drilling depth to be 440' using a 22.875'' diameter drill bit in the surface borehole well bore section with a projected total depth to be drilled of 500'. I shall GPS the well head when we cement the surface pipe.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1399572318
 
| 1399572318
 
| 2014-05-08
 
| 2014-05-08
|
+
|  
 
| On 05/08/2014 494' of 20'' .375'' well surface pipe was set and cemented to surface by Baker Hughes cement services using 507 sacks of class A 2% calcium .25 pound per sack cement, the mix water was tested and showed no chlorides above 250 parts per million, with good cement returns to surface. Due to restrictions within the working area of the rig mast the cement head would not fit and no wiper plug was ran, the casing shall be pressure tested at a later time.
 
| On 05/08/2014 494' of 20'' .375'' well surface pipe was set and cemented to surface by Baker Hughes cement services using 507 sacks of class A 2% calcium .25 pound per sack cement, the mix water was tested and showed no chlorides above 250 parts per million, with good cement returns to surface. Due to restrictions within the working area of the rig mast the cement head would not fit and no wiper plug was ran, the casing shall be pressure tested at a later time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1519699670
 +
| 2014-05-23
 +
|
 +
| Baker Hughes pressure tested 20''casing to 300 psi. for 30 minutes. The test passed.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 02:48, 15 July 2015

Well Details

Well ID: 34-111-24468
Loading map...
County: Monroe
Municipality:
Operator Name: HALL DRILLING LLC (OIL & GAS)
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-05-02
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 39.70744463
Longitude: -81.24991366

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1399314709 2014-05-05 The said well was spudded on 05/02/2014 by Zigenfoose Inc top hole rig with 100' of 24 conductor being set with no annular space, on this day I found the current drilling depth to be 440' using a 22.875 diameter drill bit in the surface borehole well bore section with a projected total depth to be drilled of 500'. I shall GPS the well head when we cement the surface pipe.
1399572318 2014-05-08 On 05/08/2014 494' of 20 .375 well surface pipe was set and cemented to surface by Baker Hughes cement services using 507 sacks of class A 2% calcium .25 pound per sack cement, the mix water was tested and showed no chlorides above 250 parts per million, with good cement returns to surface. Due to restrictions within the working area of the rig mast the cement head would not fit and no wiper plug was ran, the casing shall be pressure tested at a later time.
1519699670 2014-05-23 Baker Hughes pressure tested 20casing to 300 psi. for 30 minutes. The test passed.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.