If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-055-21952 | | Well ID: 34-055-21952 | ||
+ | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.62023068, -81.18809718 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: | + | | County: [[Geauga County, Ohio|Geauga]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[ALLIED OIL FIELD SERVICES LTD]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: 2007-06-03 |
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Final Restoration |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: | + | | Latitude: 41.62023068 |
|- | |- | ||
− | | Longitude: | + | | Longitude: -81.18809718 |
|- | |- | ||
|} | |} | ||
Line 42: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2007-0 | ||
+ | | style="text-align:right;" | 45.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2008-0 | ||
+ | | style="text-align:right;" | 1638.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2009-0 | ||
+ | | style="text-align:right;" | 788.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 63: | Line 94: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1152367165 | | -1152367165 | ||
| 2009-05-08 | | 2009-05-08 | ||
− | | | + | | |
| Lease road has been repaired. Operator has added water bars along lease road to slow drainage. Tank battery is in good repair. | | Lease road has been repaired. Operator has added water bars along lease road to slow drainage. Tank battery is in good repair. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | Field Visit or Inspection |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|- | |- | ||
| 1160828219 | | 1160828219 | ||
| 2012-01-26 | | 2012-01-26 | ||
− | | | + | | |
| Site has been graded and seeded, vegetation is established. Land owner uses lease road for his own use. All equipment has been removed. Lease road is also CEI right-of-way. | | Site has been graded and seeded, vegetation is established. Land owner uses lease road for his own use. All equipment has been removed. Lease road is also CEI right-of-way. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1184350808 | | 1184350808 | ||
| 2007-07-13 | | 2007-07-13 | ||
− | | | + | | |
− | | Well head has been installed, well is a rabbit well. Operator has solidified the working pit. Blow pit to the east of the working pit has not been solidified or closed. Pit linear has slipped from all sides of the pit. North end of the pit landowner has enlarged the pit. The pit is on a hill, the backside of the pit was checked, there was no indication of brine release down the hill. East of the pits and south of the pits approximately 6 small maple trees 10'-15' & 2 | + | | Well head has been installed, well is a rabbit well. Operator has solidified the working pit. Blow pit to the east of the working pit has not been solidified or closed. Pit linear has slipped from all sides of the pit. North end of the pit landowner has enlarged the pit. The pit is on a hill, the backside of the pit was checked, there was no indication of brine release down the hill. East of the pits and south of the pits approximately 6 small maple trees 10'-15' & 2-3 in diameter were showing signs of distress. Leaves were browning out. I spoke to Dan Horning on site, the trees could either be stressed from brine leaching into the soil or from drilling. Dan and the landowner was informed that they area was not suitable for pits to be cut and squeezed. Blow pit must be solidified and closed. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1218806218 | | 1218806218 | ||
| 2008-08-13 | | 2008-08-13 | ||
− | | | + | | |
| On site with Ed Schultz and Dan Horning from Hall and Horning. Also on site with Jay Cheslock DMRM supervisor. Lease road going down hill to the tank battery is not stable, it has rill erosion and gully erosion forming. Lease road is washing out from the top of the hill to the bottom. Sediment is being deposited at the bottom of the hill by a stream. Slope will needs stabilized, lease road needs to be constructed out of durable material. Suggested to operator that water bars may help slow the water. Diverting water at the top of the hill will also slow the velocity of the water. Tank battery is at the bottom of the hill. Operator is using a load line from the bottom of the hill to the top to of the hill to unload brine from the tank. Operator was advised to make repairs as quickly as possible. Well site is stable, vegetation is established. | | On site with Ed Schultz and Dan Horning from Hall and Horning. Also on site with Jay Cheslock DMRM supervisor. Lease road going down hill to the tank battery is not stable, it has rill erosion and gully erosion forming. Lease road is washing out from the top of the hill to the bottom. Sediment is being deposited at the bottom of the hill by a stream. Slope will needs stabilized, lease road needs to be constructed out of durable material. Suggested to operator that water bars may help slow the water. Diverting water at the top of the hill will also slow the velocity of the water. Tank battery is at the bottom of the hill. Operator is using a load line from the bottom of the hill to the top to of the hill to unload brine from the tank. Operator was advised to make repairs as quickly as possible. Well site is stable, vegetation is established. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1406318673 | ||
+ | | 2008-08-13 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1485966846 | | 1485966846 | ||
| 2010-09-15 | | 2010-09-15 | ||
− | | | + | | |
| The well was plugged to abandon. The entire plugging operation was witnessed. | | The well was plugged to abandon. The entire plugging operation was witnessed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1658110161 | ||
+ | | 2007-06-07 | ||
+ | | | ||
+ | | Fuel tanks on the back trailer has leaked onto the ground. Operator has pads socking up the fuel spill. More controls are needed. Spill is a few gallons. Drill depth is 3500'. Drilling on foam, pits are good. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1671186144 | | 1671186144 | ||
| 2008-08-05 | | 2008-08-05 | ||
− | | | + | | |
| Frac tank remains at the top of the hill, tank needs removed. Lease road from the top of the hill to the bottom of the hill is eroding. Lease road needs stabilized. Operator is using a load line to empty tank battery. There was a line from the bottom of the hill to the top. Well head site reclamation is outstanding. Operator used a temporary culvert for the stream crossing, culvert has been removed and is in the weeds, culvert needs removed from the site. | | Frac tank remains at the top of the hill, tank needs removed. Lease road from the top of the hill to the bottom of the hill is eroding. Lease road needs stabilized. Operator is using a load line to empty tank battery. There was a line from the bottom of the hill to the top. Well head site reclamation is outstanding. Operator used a temporary culvert for the stream crossing, culvert has been removed and is in the weeds, culvert needs removed from the site. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 693128958 | | 693128958 | ||
| 2007-10-18 | | 2007-10-18 | ||
− | | | + | | |
| Pits have been filled, graded and seeded. Vegetation is established. Tank battery has been installed, affected area has been graded and seeded. Lease road from the creek east needs to be restored. Lease road is washing out, rill erosion. One 110 BBL tank and one 35 BBL tank on site. | | Pits have been filled, graded and seeded. Vegetation is established. Tank battery has been installed, affected area has been graded and seeded. Lease road from the creek east needs to be restored. Lease road is washing out, rill erosion. One 110 BBL tank and one 35 BBL tank on site. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -886268154 | ||
+ | | 2007-06-14 | ||
+ | | | ||
+ | | Rig has moved off, service rig has moved on. Pit liners have slipped form the north east side of the pit. Called Randy Hall informed him that pits need closed. Pits are no longer capable of contained brine. Drainage is contained on site. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-055-21952 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.62023068,"lon":-81.18809718,"icon":""}]} |
County: Geauga | |
Municipality: | |
Operator Name: ALLIED OIL FIELD SERVICES LTD | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2007-06-03 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Final Restoration | |
Violations: 0 | |
Latitude: 41.62023068 | |
Longitude: -81.18809718 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2007-0 | 45.0 | 0.0 | ||||
2008-0 | 1638.0 | 0.0 | ||||
2009-0 | 788.0 | 0.0 | ||||
2012-0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1152367165 | 2009-05-08 | Lease road has been repaired. Operator has added water bars along lease road to slow drainage. Tank battery is in good repair. | Field Visit or Inspection | |||
1160828219 | 2012-01-26 | Site has been graded and seeded, vegetation is established. Land owner uses lease road for his own use. All equipment has been removed. Lease road is also CEI right-of-way. | ||||
1184350808 | 2007-07-13 | Well head has been installed, well is a rabbit well. Operator has solidified the working pit. Blow pit to the east of the working pit has not been solidified or closed. Pit linear has slipped from all sides of the pit. North end of the pit landowner has enlarged the pit. The pit is on a hill, the backside of the pit was checked, there was no indication of brine release down the hill. East of the pits and south of the pits approximately 6 small maple trees 10'-15' & 2-3 in diameter were showing signs of distress. Leaves were browning out. I spoke to Dan Horning on site, the trees could either be stressed from brine leaching into the soil or from drilling. Dan and the landowner was informed that they area was not suitable for pits to be cut and squeezed. Blow pit must be solidified and closed. | ||||
1218806218 | 2008-08-13 | On site with Ed Schultz and Dan Horning from Hall and Horning. Also on site with Jay Cheslock DMRM supervisor. Lease road going down hill to the tank battery is not stable, it has rill erosion and gully erosion forming. Lease road is washing out from the top of the hill to the bottom. Sediment is being deposited at the bottom of the hill by a stream. Slope will needs stabilized, lease road needs to be constructed out of durable material. Suggested to operator that water bars may help slow the water. Diverting water at the top of the hill will also slow the velocity of the water. Tank battery is at the bottom of the hill. Operator is using a load line from the bottom of the hill to the top to of the hill to unload brine from the tank. Operator was advised to make repairs as quickly as possible. Well site is stable, vegetation is established. | ||||
-1406318673 | 2008-08-13 | |||||
1485966846 | 2010-09-15 | The well was plugged to abandon. The entire plugging operation was witnessed. | ||||
-1658110161 | 2007-06-07 | Fuel tanks on the back trailer has leaked onto the ground. Operator has pads socking up the fuel spill. More controls are needed. Spill is a few gallons. Drill depth is 3500'. Drilling on foam, pits are good. | ||||
1671186144 | 2008-08-05 | Frac tank remains at the top of the hill, tank needs removed. Lease road from the top of the hill to the bottom of the hill is eroding. Lease road needs stabilized. Operator is using a load line to empty tank battery. There was a line from the bottom of the hill to the top. Well head site reclamation is outstanding. Operator used a temporary culvert for the stream crossing, culvert has been removed and is in the weeds, culvert needs removed from the site. | ||||
693128958 | 2007-10-18 | Pits have been filled, graded and seeded. Vegetation is established. Tank battery has been installed, affected area has been graded and seeded. Lease road from the creek east needs to be restored. Lease road is washing out, rill erosion. One 110 BBL tank and one 35 BBL tank on site. | ||||
-886268154 | 2007-06-14 | Rig has moved off, service rig has moved on. Pit liners have slipped form the north east side of the pit. Called Randy Hall informed him that pits need closed. Pits are no longer capable of contained brine. Drainage is contained on site. |
For data sources see[2]