X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24403"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-051-24403
 
| Well ID: 37-051-24403
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.769888, -79.41088 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.769888, -79.41088 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Fayette County, Pennsylvania|Fayette]]
 
| County: [[Fayette County, Pennsylvania|Fayette]]
Line 9: Line 9:
 
| Municipality: [[Henry Clay Township, Fayette County, Pennsylvania|Henry Clay Township]]
 
| Municipality: [[Henry Clay Township, Fayette County, Pennsylvania|Henry Clay Township]]
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[148468]]
+
| Well Pad ID: [[148468|148468]]
 
|-
 
|-
 
| Farm/Lease Name: HALL UNIT 1H
 
| Farm/Lease Name: HALL UNIT 1H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: No
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 39.769888
 
| Latitude: 39.769888
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 1958033
+
| 2010-2
| 2011-02-20
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD.UDI # 5 CEMENTING SURFACE CASING @ 572'  LOST CIRCULATION DURING CEMENT JOB USED 1" TUBING CEMENTING BACK TO SURFACE .RETURNS OF 9 SACKS OF CEMENT TO SURFACE. VOID AT 150' - 170' TOOK 90 BAGS OF CEMENT TO HAVE RETUNS BACK TO SURFACE.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1959309
+
| 2010-2
| 2011-03-22
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1960994
+
| 2011-1
| 2011-03-21
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| HORIZONTAL MARCELLUS, RIGGING UP WITH TRIPPLE RIG TO DRILL OUT BRIDGE PLUG @ 1400' TODAY.CLOSE LOOP SYSTEM WORKING GOOD. PLAN DRILLING @ 7645' (KOP) AFTER REMOVIING BRIDGE PLUG TODAY.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1961194
+
| 2011-2
| 2011-03-07
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD.UDI # 5 100' INTO ONODAGA,LOGGING AND CEMENTING BACK TO 7645'(KOP). SETTING BRIDGE PLUG @ 1400' AND MOVED OFF.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1977466
+
| 2011-2
| 2011-06-01
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1984202
+
| 2012-1
| 2011-03-31
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD. UDI # 61 DRILLING @ 12,605' TODAY. PLANNING (TD) TONIGHT @ 12,863'. RUNNING 51/2" CASING TONIGHT, CEMENTING LATE 4/2/2011.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1991476
+
| 2012-2
| 2011-07-26
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2092522
+
| 2013-1
| 2012-08-16
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Site ID sign in place, E&S and PPC plan on site, Three well heads in place, good vegetative growth, area fenced off and gated, no other activity at site, soil stockpile and sed trap still in place.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2013-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 117: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2014-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 126: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2014-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 135: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2015-02
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 144: Line 152:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 153: Line 161:
 
|-
 
|-
 
|-
 
|-
| 2010-2
+
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 162: Line 170:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 173: Line 187:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2011-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 876.1
 +
| Tons
 +
| LANDFILL
 +
| 100172
 +
| ARDEN LANDFILL
 +
| WASHINGTON
 +
| PA
 +
|-
 +
|-
 +
| 2011-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 517.88
 +
| Tons
 +
| LANDFILL
 +
| 100081
 +
| SOUTHERN ALLEGHENIES LANDFILL
 +
| DAVIDSVILLE
 +
| PA
 +
|-
 
|-
 
|-
 
| 2011-1
 
| 2011-1
 
| DRILLING FLUID WASTE
 
| DRILLING FLUID WASTE
| style="text-align:right;" | 1980.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| LANDFILL
 
| LANDFILL
Line 185: Line 221:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2011-2
 
| DRILL CUTTINGS
 
| DRILL CUTTINGS
| style="text-align:right;" | 876.1
+
| style="text-align:right;" | 128.0
 
| Tons
 
| Tons
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
| WASTE MANAGEMENT, INC  - ARDEN LANDFILL, INC.
+
| ARDEN LANDFILL
 
| WASHINGTON
 
| WASHINGTON
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2011-2
 
| DRILL CUTTINGS
 
| DRILL CUTTINGS
| style="text-align:right;" | 517.88
+
| style="text-align:right;" | 697.48
 
| Tons
 
| Tons
 
| LANDFILL
 
| LANDFILL
 
| 100081
 
| 100081
| WASTE MANAGEMENT, INC - SOUTHERN ALLEGHENIES
+
| SOUTHERN ALLEGHENIES LANDFILL
 
| DAVIDSVILLE
 
| DAVIDSVILLE
 
| PA
 
| PA
Line 212: Line 248:
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0253723
+
| WMGR123SW001
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| MASONTOWN
 
| PA
 
| PA
Line 220: Line 256:
 
| 2011-2
 
| 2011-2
 
| FRACING FLUID WASTE
 
| FRACING FLUID WASTE
| style="text-align:right;" | 1090.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0253723
+
| WMGR123SW001
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| MASONTOWN
 
| PA
 
| PA
Line 238: Line 274:
 
| WARREN
 
| WARREN
 
| OH
 
| OH
|-
 
|-
 
| 2011-2
 
| DRILL CUTTINGS
 
| style="text-align:right;" | 128.0
 
| Tons
 
| LANDFILL
 
| 100172
 
| WASTE MANAGEMENT, INC  - ARDEN LANDFILL, INC.
 
| WASHINGTON
 
| PA
 
|-
 
|-
 
| 2011-2
 
| DRILL CUTTINGS
 
| style="text-align:right;" | 697.48
 
| Tons
 
| LANDFILL
 
| 100081
 
| WASTE MANAGEMENT, INC - SOUTHERN ALLEGHENIES
 
| DAVIDSVILLE
 
| PA
 
 
|-
 
|-
 
|-
 
|-
Line 267: Line 281:
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0253723
+
| WMGR123SW001
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| MASONTOWN
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Waste Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1958033
 +
| 2011-02-20
 +
| No Violations Noted
 +
| HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD.UDI # 5 CEMENTING SURFACE CASING @ 572'  LOST CIRCULATION DURING CEMENT JOB USED 1" TUBING CEMENTING BACK TO SURFACE .RETURNS OF 9 SACKS OF CEMENT TO SURFACE. VOID AT 150' - 170' TOOK 90 BAGS OF CEMENT TO HAVE RETUNS BACK TO SURFACE.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1959309
 +
| 2011-03-22
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1960994
 +
| 2011-03-21
 +
| No Violations Noted
 +
| HORIZONTAL MARCELLUS, RIGGING UP WITH TRIPPLE RIG TO DRILL OUT BRIDGE PLUG @ 1400' TODAY.CLOSE LOOP SYSTEM WORKING GOOD. PLAN DRILLING @ 7645' (KOP) AFTER REMOVIING BRIDGE PLUG TODAY.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1961194
 +
| 2011-03-07
 +
| No Violations Noted
 +
| HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD.UDI # 5 100' INTO ONODAGA,LOGGING AND CEMENTING BACK TO 7645'(KOP). SETTING BRIDGE PLUG @ 1400' AND MOVED OFF.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1977466
 +
| 2011-06-01
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1984202
 +
| 2011-03-31
 +
| No Violations Noted
 +
| HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD. UDI # 61 DRILLING @ 12,605' TODAY. PLANNING (TD) TONIGHT @ 12,863'. RUNNING 51/2" CASING TONIGHT, CEMENTING LATE 4/2/2011.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1991476
 +
| 2011-07-26
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2092522
 +
| 2012-08-16
 +
| No Violations Noted
 +
| Site ID sign in place, E&S and PPC plan on site, Three well heads in place, good vegetative growth, area fenced off and gated, no other activity at site, soil stockpile and sed trap still in place.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2204627
 +
| 2013-08-27
 +
| No Violations Noted
 +
| Id sign and e&s ok. No production equipment on wells.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2367485
 +
| 2015-04-16
 +
| No Violations Noted
 +
|  On 04/16/15 at approximately 1130 hours I conducted a routine complete inspection of the Hall Unit. The site appeared well vegetated. The Act 9 sign was in place and visible. No violations were observed at the time of inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Inspection Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 18:33, 26 June 2015

Well Details

Well ID: 37-051-24403
Loading map...
County: Fayette
Municipality: Henry Clay Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148468
Farm/Lease Name: HALL UNIT 1H
First Permit Date: 2010-11-24
Last Permit Date: 2010-11-24
Spud Date: 2011-03-21
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.769888
Longitude: -79.41088

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 DRILL CUTTINGS 876.1 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2011-1 DRILL CUTTINGS 517.88 Tons LANDFILL 100081 SOUTHERN ALLEGHENIES LANDFILL DAVIDSVILLE PA
2011-1 DRILLING FLUID WASTE 1.0 Bbl LANDFILL NY STATE #32S11 ALLIED WASTE SYSTEMS NIAGARA FALLS NY
2011-2 DRILL CUTTINGS 128.0 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2011-2 DRILL CUTTINGS 697.48 Tons LANDFILL 100081 SOUTHERN ALLEGHENIES LANDFILL DAVIDSVILLE PA
2011-2 DRILLING FLUID WASTE 158.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 PRODUCED FLUID 540.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163 PATRIOT WATER TREATMENT WARREN OH
2012-1 FRACING FLUID WASTE 20.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1958033 2011-02-20 No Violations Noted HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD.UDI # 5 CEMENTING SURFACE CASING @ 572' LOST CIRCULATION DURING CEMENT JOB USED 1" TUBING CEMENTING BACK TO SURFACE .RETURNS OF 9 SACKS OF CEMENT TO SURFACE. VOID AT 150' - 170' TOOK 90 BAGS OF CEMENT TO HAVE RETUNS BACK TO SURFACE.
1959309 2011-03-22 No Violations Noted
1960994 2011-03-21 No Violations Noted HORIZONTAL MARCELLUS, RIGGING UP WITH TRIPPLE RIG TO DRILL OUT BRIDGE PLUG @ 1400' TODAY.CLOSE LOOP SYSTEM WORKING GOOD. PLAN DRILLING @ 7645' (KOP) AFTER REMOVIING BRIDGE PLUG TODAY.
1961194 2011-03-07 No Violations Noted HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD.UDI # 5 100' INTO ONODAGA,LOGGING AND CEMENTING BACK TO 7645'(KOP). SETTING BRIDGE PLUG @ 1400' AND MOVED OFF.
1977466 2011-06-01 No Violations Noted
1984202 2011-03-31 No Violations Noted HORIZONTAL MARCELLUS, CLOSED LOOP SYSTEM WORKING GOOD. UDI # 61 DRILLING @ 12,605' TODAY. PLANNING (TD) TONIGHT @ 12,863'. RUNNING 51/2" CASING TONIGHT, CEMENTING LATE 4/2/2011.
1991476 2011-07-26 No Violations Noted
2092522 2012-08-16 No Violations Noted Site ID sign in place, E&S and PPC plan on site, Three well heads in place, good vegetative growth, area fenced off and gated, no other activity at site, soil stockpile and sed trap still in place.
2204627 2013-08-27 No Violations Noted Id sign and e&s ok. No production equipment on wells.
2367485 2015-04-16 No Violations Noted On 04/16/15 at approximately 1130 hours I conducted a routine complete inspection of the Hall Unit. The site appeared well vegetated. The Act 9 sign was in place and visible. No violations were observed at the time of inspection.

For data sources see[3]

References