| Well ID: 37-021-20842
 
| Well ID: 37-021-20842
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.402466, -78.773249 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.402466, -78.773249 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Cambria County, Pennsylvania|Cambria]]
 +
|-
 +
| Municipality: [[Croyle Township, Cambria County, Pennsylvania|Croyle Township]]
 
|-
 
|-
 
| Operator Name: [[T & F EXPLORATION LP]]
 
| Operator Name: [[T & F EXPLORATION LP]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: TELFORD L. MANGES 1
 
|-
 
|-
 
| First Permit Date: 1993-04-30
 
| First Permit Date: 1993-04-30
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.402466
 
| Latitude: 40.402466
Line 33: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1995-0
 +
| style="text-align:right;" | 64466.0
 +
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 4713.0
 +
| style="text-align:right;" | 182.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 4063.0
 +
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 
|-
 
|-
 
| 2011-0
 
| 2011-0
Line 43: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2012-0
| style="text-align:right;" | 4063.0
+
| style="text-align:right;" | 5408.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 89:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2013-0
| style="text-align:right;" | 4713.0
+
| style="text-align:right;" | 3803.0
| style="text-align:right;" | 182.0
+
| style="text-align:right;" | 273.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 1229.0
 +
| style="text-align:right;" | 122.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 107:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 72: Line 124:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 105.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 +
| JOSEPHINE
 +
| PA
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 80: Line 149:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 215336
 
| 215336
Line 85: Line 156:
 
| No Violations Noted
 
| No Violations Noted
 
| WETLANDS DETERM.
 
| WETLANDS DETERM.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 92: Line 165:
 
| No Violations Noted
 
| No Violations Noted
 
| AT 1675'; E&S, PIT OK
 
| AT 1675'; E&S, PIT OK
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 99: Line 174:
 
| No Violations Noted
 
| No Violations Noted
 
| KILLING WELL; E&S, PIT OK
 
| KILLING WELL; E&S, PIT OK
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 106: Line 183:
 
| No Violations Noted
 
| No Violations Noted
 
| E&S, PITS OK
 
| E&S, PITS OK
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 113: Line 192:
 
| No Violations Noted
 
| No Violations Noted
 
| CLEANING OUT; E&S, PIT OK
 
| CLEANING OUT; E&S, PIT OK
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 120: Line 201:
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLED; E&S, PITS OK
 
| DRILLED; E&S, PITS OK
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 127: Line 210:
 
| No Violations Noted
 
| No Violations Noted
 
| According to records, well was completed on 6/4/93 to a depth of 9,009 ft. DEP could not find well tag.  However, T&F stated in conversation that tag was on the well.    According to my conversation with T&F, well tag will be checked again.  No visible E&S concerns at the time of inspection.  No IW discharge issues.  Well head completed with 36", 13" and 4" flange with 4 gate valves with one valve in the off position.  According to T&F, the well has been placed inoperable since March 2009 due to pipe line repair.  Production equipment consisted of separator, heater, and two 100 bbl brine tanks.  No well head pressure gauge present.  DEP requested  a telephone call when the well is placed back into production.
 
| According to records, well was completed on 6/4/93 to a depth of 9,009 ft. DEP could not find well tag.  However, T&F stated in conversation that tag was on the well.    According to my conversation with T&F, well tag will be checked again.  No visible E&S concerns at the time of inspection.  No IW discharge issues.  Well head completed with 36", 13" and 4" flange with 4 gate valves with one valve in the off position.  According to T&F, the well has been placed inoperable since March 2009 due to pipe line repair.  Production equipment consisted of separator, heater, and two 100 bbl brine tanks.  No well head pressure gauge present.  DEP requested  a telephone call when the well is placed back into production.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 136: Line 221:
  
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 143: Line 230:
 
| No Violations Noted
 
| No Violations Noted
 
| According to records, well was completed on 6/4/93 to a depth of 9,009 ft. Well tag was present.    No visible E&S concerns at the time of inspection.  No IW discharge issues.  According to T&F, the well has been placed to production mode.  Transmission line to the well was repaired.  Production equipment consisted of separator, meter, heater, and three 100 bbl brine tanks (< 20 bbls fluid).
 
| According to records, well was completed on 6/4/93 to a depth of 9,009 ft. Well tag was present.    No visible E&S concerns at the time of inspection.  No IW discharge issues.  According to T&F, the well has been placed to production mode.  Transmission line to the well was repaired.  Production equipment consisted of separator, meter, heater, and three 100 bbl brine tanks (< 20 bbls fluid).
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 150: Line 239:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present.  Gas well was in production.
 
| At the time of inspection, no E&S issues were present.  Gas well was in production.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 155: Line 246:
 
| 2143526
 
| 2143526
 
| 2013-02-05
 
| 2013-02-05
| Cambria
 
| Croyle Twp
 
 
| No Violations Noted
 
| No Violations Noted
 +
| System was in production.  At the time of inspection, No E&S issues were present.
 +
|
 +
|
 +
|
 
|-
 
|-
 
|-
 
|-
Line 164: Line 257:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present.  Gas well was not in production
 
| At the time of inspection, no E&S issues were present.  Gas well was not in production
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2321383
 +
| 2014-10-16
 +
| No Violations Noted
 +
| At the time of inspection
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2337800
 +
| 2015-01-22
 +
| No Violations Noted
 +
| At the time of inspection
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 12:23, 26 June 2015

Well Details

Well ID: 37-021-20842
Loading map...
County: Cambria
Municipality: Croyle Township
Operator Name: T & F EXPLORATION LP
Well Pad ID:
Farm/Lease Name: TELFORD L. MANGES 1
First Permit Date: 1993-04-30
Last Permit Date: 1993-04-30
Spud Date: 1993-05-19
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.402466
Longitude: -78.773249

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1995-0 64466.0 365.0 0.0 0.0 0.0 0.0
2009-0 4713.0 182.0 0.0 0.0 0.0 0.0
2010-0 4063.0 365.0 0.0 0.0 0.0 0.0
2011-0 8795.0 365.0 0.0 0.0 0.0 0.0
2012-0 5408.0 365.0 0.0 0.0 0.0 0.0
2013-0 3803.0 273.0 0.0 0.0 0.0 0.0
2014-0 1229.0 122.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2014-0 PRODUCED FLUID 105.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
215336 1993-04-28 No Violations Noted WETLANDS DETERM.
215389 1993-05-26 No Violations Noted AT 1675'; E&S, PIT OK
215409 1993-06-04 No Violations Noted KILLING WELL; E&S, PIT OK
215421 1993-06-14 No Violations Noted E&S, PITS OK
215426 1993-06-21 No Violations Noted CLEANING OUT; E&S, PIT OK
215440 1993-07-06 No Violations Noted DRILLED; E&S, PITS OK
1814875 2009-07-17 No Violations Noted According to records, well was completed on 6/4/93 to a depth of 9,009 ft. DEP could not find well tag. However, T&F stated in conversation that tag was on the well. According to my conversation with T&F, well tag will be checked again. No visible E&S concerns at the time of inspection. No IW discharge issues. Well head completed with 36", 13" and 4" flange with 4 gate valves with one valve in the off position. According to T&F, the well has been placed inoperable since March 2009 due to pipe line repair. Production equipment consisted of separator, heater, and two 100 bbl brine tanks. No well head pressure gauge present. DEP requested a telephone call when the well is placed back into production.
1829179 2009-09-16 No Violations Noted According to records, well was completed on 6/4/93 to a depth of 9,009 ft. DEP could not find well tag. T&F added well tag to well head. No visible E&S concerns at the time of inspection. No IW discharge issues. Well head completed with 36", 13" and 4" flange with 4 gate valves with one valve in the off position. According to T&F, the well has been placed inoperable since March 2009 due to pipe line repair. Production equipment consisted of separator, heater, and two 100 bbl brine tanks. No well head pressure gauge present. Well is still inactive mode during the inspection.


2012154 2011-10-20 No Violations Noted According to records, well was completed on 6/4/93 to a depth of 9,009 ft. Well tag was present. No visible E&S concerns at the time of inspection. No IW discharge issues. According to T&F, the well has been placed to production mode. Transmission line to the well was repaired. Production equipment consisted of separator, meter, heater, and three 100 bbl brine tanks (< 20 bbls fluid).
2040781 2012-01-31 No Violations Noted At the time of inspection, no E&S issues were present. Gas well was in production.
2143526 2013-02-05 No Violations Noted System was in production. At the time of inspection, No E&S issues were present.
2237759 2014-01-16 No Violations Noted At the time of inspection, no E&S issues were present. Gas well was not in production
2321383 2014-10-16 No Violations Noted At the time of inspection
2337800 2015-01-22 No Violations Noted At the time of inspection