If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-125-24622 | | Well ID: 37-125-24622 | ||
| − | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.046425, -80.100852 | width=100% | height=100% }} |
|- | |- | ||
| County: [[Washington County, Pennsylvania|Washington]] | | County: [[Washington County, Pennsylvania|Washington]] | ||
| Line 9: | Line 9: | ||
| Municipality: [[West Bethlehem Township, Washington County, Pennsylvania|West Bethlehem Township]] | | Municipality: [[West Bethlehem Township, Washington County, Pennsylvania|West Bethlehem Township]] | ||
|- | |- | ||
| − | | Operator Name: [[ | + | | Operator Name: [[CHEVRON APPALACHIA LLC]] |
|- | |- | ||
| − | | Well Pad ID: [[147809]] | + | | Well Pad ID: [[147809|147809]] |
|- | |- | ||
| Farm/Lease Name: BERCOSKY UNIT 10H | | Farm/Lease Name: BERCOSKY UNIT 10H | ||
| Line 25: | Line 25: | ||
| Horizontal: Yes | | Horizontal: Yes | ||
|- | |- | ||
| − | | | + | | Well Status: ACTIVE |
|- | |- | ||
| − | | Violations: | + | | Violations: 0 |
|- | |- | ||
| Latitude: 40.046425 | | Latitude: 40.046425 | ||
|- | |- | ||
| Longitude: -80.100852 | | Longitude: -80.100852 | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
|- | |- | ||
|} | |} | ||
| Line 86: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
| + | |- | ||
| + | | 2011-2 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | |- | ||
| + | |- | ||
| + | | 2012-1 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | |- | ||
|- | |- | ||
| 2012-2 | | 2012-2 | ||
| Line 96: | Line 71: | ||
|- | |- | ||
|- | |- | ||
| − | | | + | | 2013-1 |
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | |- | ||
| + | |- | ||
| + | | 2013-2 | ||
| + | | style="text-align:right;" | 414000.0 | ||
| + | | style="text-align:right;" | 103.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-1 | ||
| + | | style="text-align:right;" | 473429.0 | ||
| + | | style="text-align:right;" | 181.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-2 | ||
| + | | style="text-align:right;" | 266739.0 | ||
| + | | style="text-align:right;" | 184.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| Line 105: | Line 107: | ||
|- | |- | ||
|- | |- | ||
| − | | | + | | 2015-02 |
| + | | style="text-align:right;" | 40449.0 | ||
| + | | style="text-align:right;" | 28.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| + | |- | ||
| + | |- | ||
| + | | 2015-01 | ||
| + | | style="text-align:right;" | 50514.0 | ||
| + | | style="text-align:right;" | 31.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | |- | ||
| + | |- | ||
| + | | 2015-03 | ||
| + | | style="text-align:right;" | 42323.0 | ||
| + | | style="text-align:right;" | 31.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| Line 114: | Line 134: | ||
|- | |- | ||
|} | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Oil and Gas Historical Production Report | ||
| + | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
| + | | date = 2015-05-26 | ||
| + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
| + | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
| Line 126: | Line 152: | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
|- | |- | ||
| − | | 2012- | + | | 2012-1 |
| DRILLING FLUID WASTE | | DRILLING FLUID WASTE | ||
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 970.0 |
| Bbl | | Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| − | | | + | | WMGR123SW001 |
| − | | | + | | RONCO WASTE PROCESSING FACILITY |
| MASONTOWN | | MASONTOWN | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2012-2 | ||
| + | | DRILL CUTTINGS | ||
| + | | style="text-align:right;" | 184.34 | ||
| + | | Tons | ||
| + | | LANDFILL | ||
| + | | 100419 | ||
| + | | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | ||
| + | | MCCLELLANDTOWN | ||
| PA | | PA | ||
|- | |- | ||
| Line 145: | Line 182: | ||
| REUSE FOR DRILLING OR PLUGGING | | REUSE FOR DRILLING OR PLUGGING | ||
| | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2012-2 | ||
| + | | DRILLING FLUID WASTE | ||
| + | | style="text-align:right;" | 680.14 | ||
| + | | Bbl | ||
| + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| + | | WMGR123SW001 | ||
| + | | RONCO WASTE PROCESSING FACILITY | ||
| + | | MASONTOWN | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2013-1 | ||
| + | | DRILL CUTTINGS | ||
| + | | style="text-align:right;" | 797.06 | ||
| + | | Tons | ||
| + | | LANDFILL | ||
| + | | 100172 | ||
| + | | ARDEN LANDFILL | ||
| + | | WASHINGTON | ||
| PA | | PA | ||
|- | |- | ||
|- | |- | ||
| − | | | + | | 2013-1 |
| + | | DRILLING FLUID WASTE | ||
| + | | style="text-align:right;" | 46.0 | ||
| + | | Bbl | ||
| + | | REUSE OTHER THAN ROAD SPREADING | ||
| + | | | ||
| + | | REUSE FOR DRILLING OR PLUGGING | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2013-1 | ||
| DRILLING FLUID WASTE | | DRILLING FLUID WASTE | ||
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 7.15 |
| + | | Bbl | ||
| + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| + | | WMGR123SW001 | ||
| + | | RONCO WASTE PROCESSING FACILITY | ||
| + | | MASONTOWN | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2013-1 | ||
| + | | FRACING FLUID WASTE | ||
| + | | style="text-align:right;" | 504.0 | ||
| + | | Bbl | ||
| + | | REUSE OTHER THAN ROAD SPREADING | ||
| + | | | ||
| + | | REUSE FOR DRILLING OR PLUGGING | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2013-1 | ||
| + | | FRACING FLUID WASTE | ||
| + | | style="text-align:right;" | 434.22 | ||
| Bbl | | Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| − | | | + | | WMGR123SW001 |
| − | | | + | | RONCO WASTE PROCESSING FACILITY |
| MASONTOWN | | MASONTOWN | ||
| PA | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-1 | ||
| + | | DRILL CUTTINGS | ||
| + | | style="text-align:right;" | 1.77 | ||
| + | | Tons | ||
| + | | LANDFILL | ||
| + | | 100592 | ||
| + | | SOUTH HILLS LANDFILL | ||
| + | | SOUTH HILLS | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-1 | ||
| + | | FLOWBACK FRACTURING SAND | ||
| + | | style="text-align:right;" | 27.63 | ||
| + | | Tons | ||
| + | | LANDFILL | ||
| + | | 100172 | ||
| + | | ARDEN LANDFILL | ||
| + | | WASHINGTON | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-1 | ||
| + | | FRACING FLUID WASTE | ||
| + | | style="text-align:right;" | 6.0 | ||
| + | | Bbl | ||
| + | | REUSE OTHER THAN ROAD SPREADING | ||
| + | | | ||
| + | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-1 | ||
| + | | FRACING FLUID WASTE | ||
| + | | style="text-align:right;" | 192.0 | ||
| + | | Bbl | ||
| + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| + | | WMGR123SW001 | ||
| + | | RONCO WASTE PROCESSING FACILITY | ||
| + | | MASONTOWN | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-1 | ||
| + | | PRODUCED FLUID | ||
| + | | style="text-align:right;" | 3.0 | ||
| + | | Bbl | ||
| + | | REUSE OTHER THAN ROAD SPREADING | ||
| + | | | ||
| + | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-1 | ||
| + | | PRODUCED FLUID | ||
| + | | style="text-align:right;" | 17.0 | ||
| + | | Bbl | ||
| + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| + | | WMGR123SW001 | ||
| + | | RONCO WASTE PROCESSING FACILITY | ||
| + | | MASONTOWN | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-2 | ||
| + | | FLOWBACK FRACTURING SAND | ||
| + | | style="text-align:right;" | 1.92 | ||
| + | | Tons | ||
| + | | LANDFILL | ||
| + | | 100172 | ||
| + | | ARDEN LANDFILL | ||
| + | | WASHINGTON | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-2 | ||
| + | | FLOWBACK FRACTURING SAND | ||
| + | | style="text-align:right;" | 24.36 | ||
| + | | Tons | ||
| + | | RESIDUAL WASTE TRANSFER FACILITY | ||
| + | | MID074259565 | ||
| + | | US ECOLOGY | ||
| + | | DETROIT | ||
| + | | MI | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-2 | ||
| + | | FRACING FLUID WASTE | ||
| + | | style="text-align:right;" | 79.0 | ||
| + | | Bbl | ||
| + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
| + | | WMGR123SW001 | ||
| + | | RONCO WASTE PROCESSING FACILITY | ||
| + | | MASONTOWN | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2014-2 | ||
| + | | PRODUCED FLUID | ||
| + | | style="text-align:right;" | 1.0 | ||
| + | | Bbl | ||
| + | | REUSE OTHER THAN ROAD SPREADING | ||
| + | | | ||
| + | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Oil and Gas Historical Waste Report | ||
| + | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
| + | | date = 2015-05-26 | ||
| + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
| + | | accessdate = 2015-05-26 }}</ref> | ||
| + | == Inspection Data == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | INSPECTION ID | ||
| + | !scope="col" | DATE | ||
| + | !scope="col" | DESCRIPTION | ||
| + | !scope="col" | COMMENT | ||
| + | !scope="col" | VIOLATION ID | ||
| + | !scope="col" | VIOLATION CODE | ||
| + | !scope="col" | VIOLATION_COMMENT | ||
| + | |- | ||
| + | | 2052726 | ||
| + | | 2012-03-20 | ||
| + | | No Violations Noted | ||
| + | | Location is under construction. Dirt is being moved to level out pad so stone can be hauled in. | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2071529 | ||
| + | | 2012-05-16 | ||
| + | | In Compliance with Policy | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2084835 | ||
| + | | 2012-07-02 | ||
| + | | In Compliance with Policy | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2090938 | ||
| + | | 2012-08-10 | ||
| + | | No Violations Noted | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 2122326 | ||
| + | | 2012-10-25 | ||
| + | | No Violations Noted | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | | | ||
|- | |- | ||
|} | |} | ||
| − | ==References== | + | For data sources see<ref>{{cite web |
| − | {{ | + | | title = Oil and Gas Historical Inspection Report |
| − | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
| + | | date = 2015-05-26 | ||
| + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
| + | | accessdate = 2015-05-27 }}</ref> | ||
| + | == References == | ||
| + | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] | ||
| Well ID: 37-125-24622 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.046425,"lon":-80.100852,"icon":""}]} |
| County: Washington | |
| Municipality: West Bethlehem Township | |
| Operator Name: CHEVRON APPALACHIA LLC | |
| Well Pad ID: 147809 | |
| Farm/Lease Name: BERCOSKY UNIT 10H | |
| First Permit Date: 2011-11-21 | |
| Last Permit Date: 2011-11-21 | |
| Spud Date: 2012-03-29 | |
| Unconventional: Yes | |
| Horizontal: Yes | |
| Well Status: ACTIVE | |
| Violations: 0 | |
| Latitude: 40.046425 | |
| Longitude: -80.100852 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2013-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2013-2 | 414000.0 | 103.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2014-1 | 473429.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2014-2 | 266739.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2015-02 | 40449.0 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2015-01 | 50514.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2015-03 | 42323.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|---|---|---|---|---|---|---|---|
| 2012-1 | DRILLING FLUID WASTE | 970.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
| 2012-2 | DRILL CUTTINGS | 184.34 | Tons | LANDFILL | 100419 | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | MCCLELLANDTOWN | PA |
| 2012-2 | DRILLING FLUID WASTE | 340.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
| 2012-2 | DRILLING FLUID WASTE | 680.14 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
| 2013-1 | DRILL CUTTINGS | 797.06 | Tons | LANDFILL | 100172 | ARDEN LANDFILL | WASHINGTON | PA |
| 2013-1 | DRILLING FLUID WASTE | 46.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
| 2013-1 | DRILLING FLUID WASTE | 7.15 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
| 2013-1 | FRACING FLUID WASTE | 504.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
| 2013-1 | FRACING FLUID WASTE | 434.22 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
| 2014-1 | DRILL CUTTINGS | 1.77 | Tons | LANDFILL | 100592 | SOUTH HILLS LANDFILL | SOUTH HILLS | PA |
| 2014-1 | FLOWBACK FRACTURING SAND | 27.63 | Tons | LANDFILL | 100172 | ARDEN LANDFILL | WASHINGTON | PA |
| 2014-1 | FRACING FLUID WASTE | 6.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
| 2014-1 | FRACING FLUID WASTE | 192.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
| 2014-1 | PRODUCED FLUID | 3.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
| 2014-1 | PRODUCED FLUID | 17.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
| 2014-2 | FLOWBACK FRACTURING SAND | 1.92 | Tons | LANDFILL | 100172 | ARDEN LANDFILL | WASHINGTON | PA |
| 2014-2 | FLOWBACK FRACTURING SAND | 24.36 | Tons | RESIDUAL WASTE TRANSFER FACILITY | MID074259565 | US ECOLOGY | DETROIT | MI |
| 2014-2 | FRACING FLUID WASTE | 79.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
| 2014-2 | PRODUCED FLUID | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| 2052726 | 2012-03-20 | No Violations Noted | Location is under construction. Dirt is being moved to level out pad so stone can be hauled in. | |||
| 2071529 | 2012-05-16 | In Compliance with Policy | ||||
| 2084835 | 2012-07-02 | In Compliance with Policy | ||||
| 2090938 | 2012-08-10 | No Violations Noted | ||||
| 2122326 | 2012-10-25 | No Violations Noted |
For data sources see[3]