X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28617"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28617
 
| Well ID: 37-129-28617
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.149088, -79.350433 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.149088, -79.350433 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
Line 9: Line 9:
 
| Municipality: [[Donegal Township, Westmoreland County, Pennsylvania|Donegal Township]]
 
| Municipality: [[Donegal Township, Westmoreland County, Pennsylvania|Donegal Township]]
 
|-
 
|-
| Operator Name: [[WPX ENERGY APPALACHIA LLC|WPX ENERGY APPALACHIA LLC]]
+
| Operator Name: [[WPX ENERGY APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[149187]]
+
| Well Pad ID: [[149187|149187]]
 
|-
 
|-
 
| Farm/Lease Name: RIAL 1-5H
 
| Farm/Lease Name: RIAL 1-5H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.149088
 
| Latitude: 40.149088
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 1983756
+
| 2011-1
| 2011-06-21
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Site visit was in response to OG-57 waiver request for a site within 100 feet of a wetland. Waiver is being approved with the following comments.  Site will be reworking a previously built pad and well and expanding it.  Currently no disturbance was within 100 feet of the wetlands.  Proper BMPs should be installed and maintain to protect the wetland area from all erosion and sedimentation.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2016821
+
| 2011-2
| 2011-11-03
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Site visit was due to spud notification.
+
| style="text-align:right;" | 0.0
Rig on site drilling top hole.
+
| style="text-align:right;" | 0.0
HRI was actively building fresh water storage impoundment.
+
| style="text-align:right;" | 0.0
Toes of slope had been hydroseeded early in the morning.
+
| style="text-align:right;" | 0.0
BMPs in place and working properly.
 
Pits dug but not yet lined.
 
No violations noted.
 
 
 
|
 
 
|-
 
|-
 
|-
 
|-
| 2023272
+
| 2012-1
| 2011-11-23
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| HORIZONTAL MARCELLUS
+
| style="text-align:right;" | 0.0
PATTERSON RIG 480 DRILLING ON WILLIAMS PAD.
+
| style="text-align:right;" | 0.0
E&S, PITS, AND HOUSE KEEPING GOOD
+
| style="text-align:right;" | 0.0
 
+
| style="text-align:right;" | 0.0
|  
 
 
|-
 
|-
 
|-
 
|-
| 2026138
+
| 2012-2
| 2011-12-12
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Site visit was due to spud notification.
+
| style="text-align:right;" | 0.0
Patterson-UTI Rig 480 was on site.  Jack Deuitt and Dave Sheffield were the company men.
+
| style="text-align:right;" | 0.0
Impoundment construction was complete.
+
| style="text-align:right;" | 0.0
Site pad was rutted and very muddy.  Company men stated that new stone would be installed after rig skid.
+
| style="text-align:right;" | 0.0
BMPs were in place. 
 
Drill pit was installed and sound.  One side of pit was near capacity (but within freeboard limits) with fluid.  Company men were notified.
 
No violations noted at this time.  
 
 
 
|
 
 
|-
 
|-
 
|-
 
|-
| 2031992
+
| 2013-1
| 2012-01-06
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2033845
+
| 2013-2
| 2012-01-13
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2043148
+
| 2014-1
| 2012-02-10
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Site visit was part of routine inspection.
+
| style="text-align:right;" | 0.0
Rig had completed drilling and was removed from site.
+
| style="text-align:right;" | 0.0
Pits were being dewatered and were scheduled fro removeal early next week.
+
| style="text-align:right;" | 0.0
Access road and site were stable.
+
| style="text-align:right;" | 0.0
E&S controls were in place and functioning properly.
 
No violations noted at this time.
 
 
 
|
 
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2014-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 133: Line 116:
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2015-02
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 142: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 151: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 160: Line 143:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 174: Line 163:
 
| 2012-1
 
| 2012-1
 
| DRILL CUTTINGS
 
| DRILL CUTTINGS
| style="text-align:right;" | 1665.81
+
| style="text-align:right;" | 1.0
 
| Tons
 
| Tons
 
| LANDFILL
 
| LANDFILL
Line 180: Line 169:
 
| MOSTOLLER LANDFILL
 
| MOSTOLLER LANDFILL
 
| SOMERSET
 
| SOMERSET
 +
| PA
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 186.1
 +
| Tons
 +
| LANDFILL
 +
| 100277
 +
| WESTMORELAND WASTE LLC SANITARY LANDFILL
 +
| BELLE VERNON
 
| PA
 
| PA
 
|-
 
|-
Line 189: Line 189:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENVIRONMENTAL SERVICES
+
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| MOUNT PLEASANT
 
| PA
 
| PA
Line 196: Line 196:
 
| 2012-1
 
| 2012-1
 
| FRACING FLUID WASTE
 
| FRACING FLUID WASTE
| style="text-align:right;" | 15424.52
+
| style="text-align:right;" | 15.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENVIRONMENTAL SERVICES
+
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| MOUNT PLEASANT
 
| PA
 
| PA
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1983756
 +
| 2011-06-21
 +
| No Violations Noted
 +
| Site visit was in response to OG-57 waiver request for a site within 100 feet of a wetland.  Waiver is being approved with the following comments.  Site will be reworking a previously built pad and well and expanding it.  Currently no disturbance was within 100 feet of the wetlands.  Proper BMPs should be installed and maintain to protect the wetland area from all erosion and sedimentation.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2016821
 +
| 2011-11-03
 +
| No Violations Noted
 +
| Site visit was due to spud notification.
 +
Rig on site drilling top hole.
 +
HRI was actively building fresh water storage impoundment.
 +
Toes of slope had been hydroseeded early in the morning.
 +
BMPs in place and working properly.
 +
Pits dug but not yet lined.
 +
No violations noted.
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2023272
 +
| 2011-11-23
 +
| No Violations Noted
 +
| HORIZONTAL MARCELLUS
 +
PATTERSON RIG 480 DRILLING ON WILLIAMS PAD. 
 +
E&S, PITS, AND HOUSE KEEPING GOOD
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2026138
 +
| 2011-12-12
 +
| No Violations Noted
 +
| Site visit was due to spud notification.
 +
Patterson-UTI Rig 480 was on site.  Jack Deuitt and Dave Sheffield were the company men.
 +
Impoundment construction was complete.
 +
Site pad was rutted and very muddy.  Company men stated that new stone would be installed after rig skid.
 +
BMPs were in place. 
 +
Drill pit was installed and sound.  One side of pit was near capacity (but within freeboard limits) with fluid.  Company men were notified.
 +
No violations noted at this time.
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2031992
 +
| 2012-01-06
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2033845
 +
| 2012-01-13
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2043148
 +
| 2012-02-10
 +
| No Violations Noted
 +
| Site visit was part of routine inspection.
 +
Rig had completed drilling and was removed from site.
 +
Pits were being dewatered and were scheduled fro removeal early next week.
 +
Access road and site were stable.
 +
E&S controls were in place and functioning properly.
 +
No violations noted at this time.
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2146583
 +
| 2013-03-08
 +
| No Violations Noted
 +
| Routine inspection no issues noted.
 +
|
 +
|
 +
|
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2194517
| DRILL CUTTINGS
+
| 2013-08-09
| style="text-align:right;" | 186.1
+
| No Violations Noted
| Tons
+
| Inspected the site on 08/09/13. The site has 4 drilled wells on the well pad. One of the 4 wells has been Fracked. There is not a gathering pipeline constructed to the well pad. The new Act 9 was posted on site. The entrance road is well gravelled. The well pad had standing water on it. The fresh water impoundment had greater than 2 feet of freeboard. The flow back impoundment had greater than 2 feet of freeboard. There is not any citizen complaints against this site.
| LANDFILL
+
Inspected the site on 08/09/13. The site has 4 drilled wells on the well pad. One of the 4 wells has been Fracked. There is not a gathering pipeline constructed to the well pad. The new Act 9 was posted on site. The entrance road is well gravelled. The well pad had standing water on it. The fresh water impoundment had greater than 2 feet of freeboard. The flow back impoundment had greater than 2 feet of freeboard. There is not any citizen complaints against this site.
| 100277
+
 
| WESTMORELAND WASTE, LLC
+
|  
| BELLE VERNON
+
|  
| PA
+
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 04:30, 25 June 2015

Well Details

Well ID: 37-129-28617
Loading map...
County: Westmoreland
Municipality: Donegal Township
Operator Name: WPX ENERGY APPALACHIA LLC
Well Pad ID: 149187
Farm/Lease Name: RIAL 1-5H
First Permit Date: 2011-06-29
Last Permit Date: 2011-06-29
Spud Date: 2011-12-02
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.149088
Longitude: -79.350433

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILL CUTTINGS 1.0 Tons LANDFILL 101571 MOSTOLLER LANDFILL SOMERSET PA
2012-1 DRILL CUTTINGS 186.1 Tons LANDFILL 100277 WESTMORELAND WASTE LLC SANITARY LANDFILL BELLE VERNON PA
2012-1 DRILLING FLUID WASTE 480.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2012-1 FRACING FLUID WASTE 15.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1983756 2011-06-21 No Violations Noted Site visit was in response to OG-57 waiver request for a site within 100 feet of a wetland. Waiver is being approved with the following comments. Site will be reworking a previously built pad and well and expanding it. Currently no disturbance was within 100 feet of the wetlands. Proper BMPs should be installed and maintain to protect the wetland area from all erosion and sedimentation.
2016821 2011-11-03 No Violations Noted Site visit was due to spud notification.

Rig on site drilling top hole. HRI was actively building fresh water storage impoundment. Toes of slope had been hydroseeded early in the morning. BMPs in place and working properly. Pits dug but not yet lined. No violations noted.

2023272 2011-11-23 No Violations Noted HORIZONTAL MARCELLUS

PATTERSON RIG 480 DRILLING ON WILLIAMS PAD. E&S, PITS, AND HOUSE KEEPING GOOD

2026138 2011-12-12 No Violations Noted Site visit was due to spud notification.

Patterson-UTI Rig 480 was on site. Jack Deuitt and Dave Sheffield were the company men. Impoundment construction was complete. Site pad was rutted and very muddy. Company men stated that new stone would be installed after rig skid. BMPs were in place. Drill pit was installed and sound. One side of pit was near capacity (but within freeboard limits) with fluid. Company men were notified. No violations noted at this time.

2031992 2012-01-06 No Violations Noted
2033845 2012-01-13 No Violations Noted
2043148 2012-02-10 No Violations Noted Site visit was part of routine inspection.

Rig had completed drilling and was removed from site. Pits were being dewatered and were scheduled fro removeal early next week. Access road and site were stable. E&S controls were in place and functioning properly. No violations noted at this time.

2146583 2013-03-08 No Violations Noted Routine inspection no issues noted.
2194517 2013-08-09 No Violations Noted Inspected the site on 08/09/13. The site has 4 drilled wells on the well pad. One of the 4 wells has been Fracked. There is not a gathering pipeline constructed to the well pad. The new Act 9 was posted on site. The entrance road is well gravelled. The well pad had standing water on it. The fresh water impoundment had greater than 2 feet of freeboard. The flow back impoundment had greater than 2 feet of freeboard. There is not any citizen complaints against this site.

Inspected the site on 08/09/13. The site has 4 drilled wells on the well pad. One of the 4 wells has been Fracked. There is not a gathering pipeline constructed to the well pad. The new Act 9 was posted on site. The entrance road is well gravelled. The well pad had standing water on it. The fresh water impoundment had greater than 2 feet of freeboard. The flow back impoundment had greater than 2 feet of freeboard. There is not any citizen complaints against this site.

For data sources see[3]

References