Difference between revisions of "37-003-22187"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22187
 
| Well ID: 37-003-22187
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.514333, -79.706388 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.514333, -79.706388 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Allegheny County, Pennsylvania|Allegheny]]
 
| County: [[Allegheny County, Pennsylvania|Allegheny]]
Line 9: Line 9:
 
| Municipality: [[Plum Borough, Allegheny County, Pennsylvania|Plum Borough]]
 
| Municipality: [[Plum Borough, Allegheny County, Pennsylvania|Plum Borough]]
 
|-
 
|-
| Operator Name: [[PENNECO OIL CO INC|PENNECO OIL CO INC]]
+
| Operator Name: [[PENNECO OIL CO INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: HANKEY UNIT 6H
 
|-
 
|-
 
| First Permit Date: 2011-05-16
 
| First Permit Date: 2011-05-16
Line 19: Line 23:
 
| Unconventional: No
 
| Unconventional: No
 
|-
 
|-
| Horizontal: Yes
+
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.514333
 
| Latitude: 40.514333
Line 28: Line 34:
 
|-
 
|-
 
|}
 
|}
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 7897.0
 +
| style="text-align:right;" | 92.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 130.2
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 20871.0
 +
| style="text-align:right;" | 366.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 117.86
 +
| style="text-align:right;" | 366.0
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 14620.0
 +
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 103.87
 +
| style="text-align:right;" | 365.0
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 12231.0
 +
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 76.79
 +
| style="text-align:right;" | 365.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2011-0
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 330.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095443
 +
| CREEKSIDE TREATMENT FACILITY
 +
| CREEKSIDE
 +
| PA
 +
|-
 +
|-
 +
| 2011-0
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 960.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2011-0
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
| TUNNELTON LIQUIDS TREATMENT FACILITY
 +
| SALTSBURG
 +
| PA
 +
|-
 +
|-
 +
| 2011-0
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 2.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2011-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 160.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2012-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 356.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 +
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2013-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 246.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
| CREEKSIDE TREATMENT FACILITY
 +
| CREEKSIDE
 +
| PA
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 35.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
| CREEKSIDE TREATMENT FACILITY
 +
| CREEKSIDE
 +
| PA
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 35: Line 199:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1983213
 
| 1983213
Line 41: Line 207:
 
| PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL.
 
| PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL.
 
ACCESS AND E&S OK.
 
ACCESS AND E&S OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 48: Line 216:
 
| No Violations Noted
 
| No Violations Noted
 
| CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL.
 
| CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 55: Line 225:
 
| No Violations Noted
 
| No Violations Noted
 
| RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK.
 
| RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 63: Line 235:
 
| RUNNING RODS TO RESUME DRILLING.
 
| RUNNING RODS TO RESUME DRILLING.
 
SITE, PIT, E&S, AND ACCESS, OK.
 
SITE, PIT, E&S, AND ACCESS, OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 70: Line 244:
 
| No Violations Noted
 
| No Violations Noted
 
| TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11.
 
| TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 77: Line 253:
 
| No Violations Noted
 
| No Violations Noted
 
| RIG IDLE. PROBLEMS WIT THREADS ON CASING.
 
| RIG IDLE. PROBLEMS WIT THREADS ON CASING.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 84: Line 262:
 
| No Violations Noted
 
| No Violations Noted
 
| On June 8th , 2011 I conducted a routine inspection of the above site.  The site was under construction but almost complete.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  E&S controls were in place.  The pit was constructed.  The operator should continue to inspect the E&S controls until site restoration is complete.
 
| On June 8th , 2011 I conducted a routine inspection of the above site.  The site was under construction but almost complete.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  E&S controls were in place.  The pit was constructed.  The operator should continue to inspect the E&S controls until site restoration is complete.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 91: Line 271:
 
| No Violations Noted
 
| No Violations Noted
 
| On June 14th , 2011 I conducted a routine inspection of the above site.  The rig was set up on site.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  E&S controls were in place.  The pit was constructed.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On June 14th , 2011 I conducted a routine inspection of the above site.  The rig was set up on site.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  E&S controls were in place.  The pit was constructed.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 98: Line 280:
 
| No Violations Noted
 
| No Violations Noted
 
| On June 24th , 2011 I conducted a routine inspection of the above site.  Drilling had started.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  Water trucks were on site.  E&S controls were in place.  The pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On June 24th , 2011 I conducted a routine inspection of the above site.  Drilling had started.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  Water trucks were on site.  E&S controls were in place.  The pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 106: Line 290:
 
| US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL.
 
| US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL.
 
KICK PLUG CEMENTED BACK TO 2492'.
 
KICK PLUG CEMENTED BACK TO 2492'.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 113: Line 299:
 
| No Violations Noted
 
| No Violations Noted
 
| On July 6th , 2011 I conducted a routine inspection of the above site.  Drilling had started.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  The next/bigger rig had moved in.  E&S controls were in place.  The pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On July 6th , 2011 I conducted a routine inspection of the above site.  Drilling had started.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  The next/bigger rig had moved in.  E&S controls were in place.  The pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 120: Line 308:
 
| No Violations Noted
 
| No Violations Noted
 
| On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint.  Drilling was occurring.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  12 frac tanks were at the site.  E&S controls were in place.  The pit appeared to be in good condition.  A small slip was developing on the fill slope.  Crews were on site to make repairs.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint.  Drilling was occurring.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  12 frac tanks were at the site.  E&S controls were in place.  The pit appeared to be in good condition.  A small slip was developing on the fill slope.  Crews were on site to make repairs.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 127: Line 317:
 
| No Violations Noted
 
| No Violations Noted
 
| On August 3rd , 2011 I conducted a routine inspection of the above site.  Drilling was completed and the rig was tearing down.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.    E&S controls were in place.  The pit appeared to be in good condition.  The silt sock required maintenance. The operator was contacted.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On August 3rd , 2011 I conducted a routine inspection of the above site.  Drilling was completed and the rig was tearing down.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.    E&S controls were in place.  The pit appeared to be in good condition.  The silt sock required maintenance. The operator was contacted.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 134: Line 326:
 
| No Violations Noted
 
| No Violations Noted
 
| On August 4th  , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site.  The necessary repairs had been completed.  The rig had moved offsite.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.    E&S controls were in place.  The pits appeared to be in good condition.  Crews were cleaning the mud tanks.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On August 4th  , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site.  The necessary repairs had been completed.  The rig had moved offsite.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.    E&S controls were in place.  The pits appeared to be in good condition.  Crews were cleaning the mud tanks.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 141: Line 335:
 
| No Violations Noted
 
| No Violations Noted
 
| RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION.
 
| RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 148: Line 344:
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE.
 
| HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 155: Line 353:
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492'
 
| HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492'
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 163: Line 363:
 
| DRILLING COMPLETE AND THE RIG IS GONE.
 
| DRILLING COMPLETE AND THE RIG IS GONE.
 
SITE, PIT, E&S, AND ACCESS, IS OK.
 
SITE, PIT, E&S, AND ACCESS, IS OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 172: Line 374:
 
FRACK TANKS ARE SET AND A NEW PIT HAS BEEN DUG.
 
FRACK TANKS ARE SET AND A NEW PIT HAS BEEN DUG.
 
THE SITE IS CLEAN AND DOZED.
 
THE SITE IS CLEAN AND DOZED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 182: Line 386:
 
THE WELL WILL BE FRACED ON 8/18/11.  
 
THE WELL WILL BE FRACED ON 8/18/11.  
 
SITE, PIT,, E&S, AND ACCESS GOOD.
 
SITE, PIT,, E&S, AND ACCESS GOOD.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 189: Line 395:
 
| No Violations Noted
 
| No Violations Noted
 
| RUNNING TUBING TO PUMP AIR TO CLEAN HOLE.
 
| RUNNING TUBING TO PUMP AIR TO CLEAN HOLE.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 196: Line 404:
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING.
 
| WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 203: Line 413:
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED.
 
| HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 211: Line 423:
 
| THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL.  
 
| THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL.  
 
THE SITE IS RESTORED.
 
THE SITE IS RESTORED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 218: Line 432:
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley WQS SWRO, was on site to complete a routine inspection.  The well was equipped for production.  Brine tank located onsite appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in on the access road or well-site.  The site had at least 70% vegetation on the hillsides.
 
| John Ley WQS SWRO, was on site to complete a routine inspection.  The well was equipped for production.  Brine tank located onsite appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in on the access road or well-site.  The site had at least 70% vegetation on the hillsides.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Oil and Gas Historical Inspection Report
!scope="col" | PERIOD
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
!scope="col" | GAS QUANTITY
+
| date = 2015-05-26
!scope="col" | GAS PRODUCTION DAYS
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
!scope="col" | CONDENSATE QUANTITY
+
| accessdate = 2015-05-27 }}</ref>
!scope="col" | CONDENSATE PRODUCTION DAYS
+
== References ==
!scope="col" | OIL QUANTITY
+
{{reflist}}
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
| 2012-0
 
| style="text-align:right;" | 20871.0
 
| style="text-align:right;" | 366.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 117.86
 
| style="text-align:right;" | 366.0
 
|-
 
|-
 
| 2011-0
 
| style="text-align:right;" | 7897.0
 
| style="text-align:right;" | 92.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 130.2
 
| style="text-align:right;" | 92.0
 
|-
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 356.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2011-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 330.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
|-
 
|-
 
| 2011-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 960.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2011-0
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 2450.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2011-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 160.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2011-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 1890.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
|-
 
|}
 
==References==
 
{{Reflist}}
 
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 03:14, 25 June 2015

Well Details

Well ID: 37-003-22187
Loading map...
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: HANKEY UNIT 6H
First Permit Date: 2011-05-16
Last Permit Date: 2011-05-16
Spud Date: 2011-06-13
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.514333
Longitude: -79.706388

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 7897.0 92.0 0.0 0.0 130.2 92.0
2012-0 20871.0 366.0 0.0 0.0 117.86 366.0
2013-0 14620.0 365.0 0.0 0.0 103.87 365.0
2014-0 12231.0 365.0 0.0 0.0 76.79 365.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-0 DRILLING FLUID WASTE 330.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 DRILLING FLUID WASTE 960.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2011-0 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-0 FRACING FLUID WASTE 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2011-0 PRODUCED FLUID 160.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2012-0 PRODUCED FLUID 356.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2013-0 PRODUCED FLUID 246.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2014-0 PRODUCED FLUID 35.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1983213 2011-06-08 No Violations Noted PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL.

ACCESS AND E&S OK.

1983776 2011-06-14 No Violations Noted CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL.
1983786 2011-06-16 No Violations Noted RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK.
1983787 2011-06-24 No Violations Noted RUNNING RODS TO RESUME DRILLING.

SITE, PIT, E&S, AND ACCESS, OK.

1983788 2011-06-28 No Violations Noted TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11.
1983789 2011-06-15 No Violations Noted RIG IDLE. PROBLEMS WIT THREADS ON CASING.
1985337 2011-06-08 No Violations Noted On June 8th , 2011 I conducted a routine inspection of the above site. The site was under construction but almost complete. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete.
1986504 2011-06-14 No Violations Noted On June 14th , 2011 I conducted a routine inspection of the above site. The rig was set up on site. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1986608 2011-06-24 No Violations Noted On June 24th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. Water trucks were on site. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1991678 2011-07-06 No Violations Noted US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL.

KICK PLUG CEMENTED BACK TO 2492'.

1992021 2011-07-06 No Violations Noted On July 6th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. The next/bigger rig had moved in. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993478 2011-07-26 No Violations Noted On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint. Drilling was occurring. The access road was in good condition. A Site ID and E&S plan were posted at the site. 12 frac tanks were at the site. E&S controls were in place. The pit appeared to be in good condition. A small slip was developing on the fill slope. Crews were on site to make repairs. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993497 2011-08-03 No Violations Noted On August 3rd , 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was tearing down. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition. The silt sock required maintenance. The operator was contacted. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993503 2011-08-04 No Violations Noted On August 4th , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site. The necessary repairs had been completed. The rig had moved offsite. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pits appeared to be in good condition. Crews were cleaning the mud tanks. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993798 2011-07-26 No Violations Noted RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION.
1993803 2011-07-18 No Violations Noted HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE.
1993812 2011-07-13 No Violations Noted HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492'
1998345 2011-08-03 No Violations Noted DRILLING COMPLETE AND THE RIG IS GONE.

SITE, PIT, E&S, AND ACCESS, IS OK.

1998347 2011-08-05 No Violations Noted THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE.

FRACK TANKS ARE SET AND A NEW PIT HAS BEEN DUG. THE SITE IS CLEAN AND DOZED.

2001758 2011-08-16 No Violations Noted HORIZONTAL OIL WELL.

SERVICE RIG SET UP RUNNING PIPE. THE WELL WILL BE FRACED ON 8/18/11. SITE, PIT,, E&S, AND ACCESS GOOD.

2001797 2011-08-29 No Violations Noted RUNNING TUBING TO PUMP AIR TO CLEAN HOLE.
2001799 2011-08-24 No Violations Noted WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING.
2035041 2012-01-04 No Violations Noted HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED.
2054231 2012-02-22 No Violations Noted THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL.

THE SITE IS RESTORED.

2106083 2012-10-04 No Violations Noted John Ley WQS SWRO, was on site to complete a routine inspection. The well was equipped for production. Brine tank located onsite appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in on the access road or well-site. The site had at least 70% vegetation on the hillsides.

For data sources see[3]