X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-21130"

m
m (Wiki moved page 117-21130 to 42-117-21130)
(No difference)

Revision as of 21:24, 10 May 2014

Well Details

Well ID: 117-21130
Loading map...
County: Tioga
Municipality: Bloss Township
Operator Name: SENECA RESOURCES CORP
Farm/Lease Name: DCNR 595 PAD I 48H 50309
First Permit Date: 2011-01-24
Last Permit Date: 2011-08-03
Spud Date: 2011-07-07
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.680858
Longitude: -77.137408

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2000874 2011-09-06 No Violations Noted
2032598 2012-01-05 No Violations Noted
2056915 2012-04-04 No Violations Noted
2068339 2012-05-15 No Violations Noted Open flow detected at C annulus vent (9 5/8" x 13 3/8"). B annulus vent (5 /12" x 9 5/8") plumbed to tank.
2068343 2012-05-15 No Violations Noted Open flow detected at C annulus vent (9 5/8" x 13 3/8"). B annulus vent (5 1/2" x 9 5/8") plumbed to tank.
2077825 2012-06-20 No Violations Noted slopes stabilized

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-2 DRILL CUTTINGS 958.77 Tons LANDFILL 743884 PHOENIX RESOURCES LANDFILL WELLSBORO PA
2012-1 DRILL CUTTINGS 327.77 Tons LANDFILL 743884 PHOENIX RESOURCES LANDFILL WELLSBORO PA

References