X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-015-20281"

m
Line 241: Line 241:
 
|-
 
|-
 
|}
 
|}
 +
==References==
 +
{{Reflist}}
 +
 
__NOEDITSECTION__
 
__NOEDITSECTION__

Revision as of 21:52, 9 May 2014

Well Details

Well ID: 015-20281
Loading map...
County: Bradford
Municipality: Springfield Township
Operator Name: EOG RESOURCES INC
Farm/Lease Name: GUINAN 2H
First Permit Date: 2009-05-14
Last Permit Date: 2010-03-16
Spud Date: 2010-04-26
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.871398
Longitude: -76.692416

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1887161 2010-05-21 No Violations Noted
1890963 2010-06-11 No Violations Noted Conducted Inspection with DEP expert John Vittitow. Met onsit with EOG Field Drilling Superintendent Robert Dysart, HWD Tool Pusher Mike Bigelow, EOG Wellsite Supervisor Kelly Spoonts, EOG Wellsite Supervisor Kevin Russell and Dallas Morris Tool Pusher Jerry Barnes. HWD Rig #4 rigged up over the hole and drilling operations are suspended, painting in process. HWD Rig #4 is prepared to resume drilling at 4,100'. The planned MTD is 9,133'.

Bruce Jankura performed a review / audit of the documents in the onsite office trailer. He found the following in good order; -BOP test charts and datasheet. -Casing data for the shallow portion of the well. -Guinan #2H Multi-fold file binder Performed a walk around with the above personnel. There were no environmental or compliance violations observed. Inspected BOP, accumulator, rig floor controls and remote controlsJob Safety Analysis meeting notes were available for review.


1890993 2010-06-09 No Violations Noted On location with Doug Welsh to witness BOP test. all test were ok and bop is ok. CASING PROGRAM !!! ran 82 ft 16" casing cemented to surface** ran 379 ft 11 3/4 casing cemented to surface with 15 bbl return*** ran 1400 ft 8 5/8 casing cemented to surface with 30 bbl return to surface.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 482030.0 184.0 0.0 0.0 0.0 0.0
2012-1 559473.0 182.0 0.0 0.0 0.0 0.0
2011-2 542588.0 184.0 0.0 0.0 0.0 0.0
2011-1 153869.0 89.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 115.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 295.0 Bbl STORAGE PENDING DISPOSAL OR REUSE STORAGE PENDING DISPOSAL OR REUSE PA
2011-1 DRILL CUTTINGS 92.86 Tons LANDFILL 31346244 CASELLA WASTE SYSTEMS PAINTED POST NY
2011-1 PRODUCED FLUID 426.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2011-2 FLOWBACK FRACTURING SAND 146.0 Tons LANDFILL 8-4630-00010/00 HAKES C&D LANDFILL PAINTED POST NY
2011-2 PRODUCED FLUID 100.0 Bbl INJECTION DISPOSAL WELL 34-049-23127 NORTH STAR YOUNGSTOWN OH
2011-2 PRODUCED FLUID 4200.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 1948.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING

References