X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20200"

Line 4: Line 4:
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.605111, -75.993483 | width=100% | height=100% }}  
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.605111, -75.993483 | width=100% | height=100% }}  
 
|-
 
|-
| County: [[wikipedia:Wyoming County, Pennsylvania|Wyoming]]
+
| County: [[Wyoming County, Pennsylvania|Wyoming]]
 
|-
 
|-
| Municipality: [[wikipedia:Washington Township, Wyoming County, Pennsylvania|Washington Township]]
+
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
 
|-
 
|-
 
| Operator Name: [[wikipedia:CARRIZO (MARCELLUS) LLC|CARRIZO (MARCELLUS) LLC]]
 
| Operator Name: [[wikipedia:CARRIZO (MARCELLUS) LLC|CARRIZO (MARCELLUS) LLC]]

Revision as of 20:19, 4 May 2014

Well Details

Well ID: 131-20200
Loading map...
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Farm/Lease Name: KILE 4H
First Permit Date: 2011-07-19
Last Permit Date: 2011-07-19
Spud Date: 2011-09-21
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 2
Latitude: 41.605111
Longitude: -75.993483

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2002147 2011-09-13 No Violations Noted
2005303 2011-09-26 No Violations Noted Spud rig is drilling now.
2009500 2011-10-11 No Violations Noted Falcon 14, Comp. man - Kevin Barnhill, moved in Oct 6, 2011

drilling on air, at 1444' checked cellar - no bubbles discussed need for csg crew to put plastic under csg, and need to fix holes in containment. 13 3/8" @ 700' w/ 710 sx , 15.4 ppg, 35 bbls cement to surf.

2010713 2011-10-13 No Violations Noted Falcon 14 Comp. Man - Wayne Simon

9 5/8" @ 1672' w/ 525 sx Type 1 ( BJ), 15.0 ppg, 11 bbls return to surf. (10/12/2011), 22 cent., every other jt. Skidded to the 3H - presently rigging up.

2036987 2012-01-25 No Violations Noted
2049766 2012-03-12 No Violations Noted
2054777 2012-03-28 Violation(s) Noted 635539
2054777 2012-03-28 Violation(s) Noted 635540
2054788 2012-03-27 Pending Nabors M 61, Comp Man - John Savage checked drillers log @ 6492'

Air drilling - quite dusty. Switching to OBM this evening. BOP test 3/23/12 good. Diesel off containment, 4 x 15' on one side and 20 x 4' on the other side, spill appears to have happened on containment at a corner and leaked down through. John Savage says a 5 gal bucket of diesel was spilled on containment. Discussed need to clean up areas of OBM on containment in waste area, 1' sq area of tan material in chem area( soap), oil around vac unit, and holes in containment in area of OBM tanks.

2060107 2012-04-09 No Violations Noted Nabors M 61 Comp. Man - Skip McClelland @ TD = 16435'

Tully 5907' Hamilton 6059' U Marc 7784' Ch Val 7876' L Marc 7876' TVD 6600 - 6800' 200 t0 400 units gas TD ed on 8th. Coming out of hole.

Discussed need to clean up oily areas on containment and be sure to clean up pad after rig moves - previous spills.

2123570 2012-12-14 No Violations Noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 61111.0 16.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 522.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2011-2 DRILL CUTTINGS 726.53 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH
2012-1 DRILL CUTTINGS 1611.0 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH