If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
(Created page with "== Well Details == {{129-28779-Details}} __TOC__ == Well Inspection Data == {{129-28779-inspection}} == Production Data == {{129-28779-production}} == Waste Data == {{129-2877...") |
|||
Line 1: | Line 1: | ||
== Well Details == | == Well Details == | ||
− | { | + | {| class="wikitable" width="95%" |
+ | | Well ID: 129-28779 | ||
+ | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.508047, -79.545911 | width=100% | height=100% }} | ||
+ | |- | ||
+ | | County: [[Westmoreland County, Pennsylvania|Westmoreland]] | ||
+ | |- | ||
+ | | Municipality: [[Bell Township, Westmoreland County, Pennsylvania|Bell Township]] | ||
+ | |- | ||
+ | | Operator Name: [[CNX GAS CO LLC]] | ||
+ | |- | ||
+ | | Farm/Lease Name: KUHNS 3B | ||
+ | |- | ||
+ | | First Permit Date: 2012-04-12 | ||
+ | |- | ||
+ | | Last Permit Date: 2012-04-12 | ||
+ | |- | ||
+ | | Spud Date: 2012-04-12 | ||
+ | |- | ||
+ | | Unconventional: Yes | ||
+ | |- | ||
+ | | Horizontal: Yes | ||
+ | |- | ||
+ | | Producing: Yes | ||
+ | |- | ||
+ | | Violations: None | ||
+ | |- | ||
+ | | Latitude: 40.508047 | ||
+ | |- | ||
+ | | Longitude: -79.545911 | ||
+ | |- | ||
+ | |} | ||
__TOC__ | __TOC__ | ||
== Well Inspection Data == | == Well Inspection Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | INSPECTION ID | ||
+ | !scope="col" | DATE | ||
+ | !scope="col" | DESCRIPTION | ||
+ | !scope="col" | COMMENT | ||
+ | !scope="col" | VIOLATION ID | ||
+ | |- | ||
+ | | 2068980 | ||
+ | | 2012-05-14 | ||
+ | | No Violations Noted | ||
+ | | Waiting on rig to commence tophole drilling. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2080115 | ||
+ | | 2012-06-21 | ||
+ | | No Violations Noted | ||
+ | | Waiting on rig to commence tophole drilling. Inspection conducted w/OGI D. Catalano. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2085688 | ||
+ | | 2012-07-22 | ||
+ | | In Compliance with Policy | ||
+ | | Responded to a communication with an existing spring while drilling the 3B well. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2086685 | ||
+ | | 2012-07-23 | ||
+ | | No Violations Noted | ||
+ | | Falcon Drilling rig#28 nippling up to commence drilling 17 1/2” hole. Closed loop system being utilized. Pit lined and freeboard maintained. Inspection conducted w/OGI Supervisor D. Stivanson. Operator notified Department 22:34 07-21-12 of inadvertent returns associated with 20” cement job. WQS J. Carson conducted inspection 07-22-12. Referred to WQS S. Steingrabe 10:06 07-23-12 for follow up. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2086695 | ||
+ | | 2012-07-26 | ||
+ | | No Violations Noted | ||
+ | | Falcon Drilling rig#28 tripping out of 12 1/4” hole (2149’ TD) at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2092779 | ||
+ | | 2012-08-06 | ||
+ | | No Violations Noted | ||
+ | | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2097848 | ||
+ | | 2012-09-05 | ||
+ | | No Violations Noted | ||
+ | | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2134658 | ||
+ | | 2013-01-25 | ||
+ | | No Violations Noted | ||
+ | | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI D. Catalano. | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
== Production Data == | == Production Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | GAS QUANTITY | ||
+ | !scope="col" | GAS PRODUCTION DAYS | ||
+ | !scope="col" | CONDENSATE QUANTITY | ||
+ | !scope="col" | CONDENSATE PRODUCTION DAYS | ||
+ | !scope="col" | OIL QUANTITY | ||
+ | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
== Waste Data == | == Waste Data == | ||
− | { | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" | PERIOD | ||
+ | !scope="col" | TYPE | ||
+ | !scope="col" | QUANTITY | ||
+ | !scope="col" | UNITS | ||
+ | !scope="col" | DISPOSAL METHOD | ||
+ | !scope="col" | WASTE FACILITY PERMIT ID | ||
+ | !scope="col" | WASTE FACILITY NAME | ||
+ | !scope="col" | FACILITY CITY | ||
+ | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 2120.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR HYDRAULIC FRACTURING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 561.98 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | 100434 | ||
+ | | WASTE MANAGEMENT, INC - EVERGREEN LANDFILL | ||
+ | | BLAIRSVILLE | ||
+ | | PA | ||
+ | |- | ||
+ | |} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ |
Well ID: 129-28779 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.508047,"lon":-79.545911,"icon":""}]} |
County: Westmoreland | |
Municipality: Bell Township | |
Operator Name: CNX GAS CO LLC | |
Farm/Lease Name: KUHNS 3B | |
First Permit Date: 2012-04-12 | |
Last Permit Date: 2012-04-12 | |
Spud Date: 2012-04-12 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.508047 | |
Longitude: -79.545911 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2068980 | 2012-05-14 | No Violations Noted | Waiting on rig to commence tophole drilling. | |
2080115 | 2012-06-21 | No Violations Noted | Waiting on rig to commence tophole drilling. Inspection conducted w/OGI D. Catalano. | |
2085688 | 2012-07-22 | In Compliance with Policy | Responded to a communication with an existing spring while drilling the 3B well. | |
2086685 | 2012-07-23 | No Violations Noted | Falcon Drilling rig#28 nippling up to commence drilling 17 1/2” hole. Closed loop system being utilized. Pit lined and freeboard maintained. Inspection conducted w/OGI Supervisor D. Stivanson. Operator notified Department 22:34 07-21-12 of inadvertent returns associated with 20” cement job. WQS J. Carson conducted inspection 07-22-12. Referred to WQS S. Steingrabe 10:06 07-23-12 for follow up. | |
2086695 | 2012-07-26 | No Violations Noted | Falcon Drilling rig#28 tripping out of 12 1/4” hole (2149’ TD) at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained. | |
2092779 | 2012-08-06 | No Violations Noted | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. | |
2097848 | 2012-09-05 | No Violations Noted | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. | |
2134658 | 2013-01-25 | No Violations Noted | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI D. Catalano. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILLING FLUID WASTE | 2120.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | DRILL CUTTINGS | 561.98 | Tons | LANDFILL | 100434 | WASTE MANAGEMENT, INC - EVERGREEN LANDFILL | BLAIRSVILLE | PA |