X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22211"

(Created page with "== Well Details == {{003-22211-Details}} __TOC__ == Well Inspection Data == {{003-22211-inspection}} == Production Data == {{003-22211-production}} == Waste Data == {{003-2221...")
 
Line 1: Line 1:
 
== Well Details ==
 
== Well Details ==
{{003-22211-Details}}
+
{| class="wikitable" width="95%"
 +
| Well ID: 003-22211
 +
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.625205, -79.783272 | width=100% | height=100% }}
 +
|-
 +
| County: [[Allegheny County, Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Frazer Township, Allegheny County, Pennsylvania|Frazer Township]]
 +
|-
 +
| Operator Name: [[RANGE RESOURCES APPALACHIA LLC]]
 +
|-
 +
| Farm/Lease Name: BAKERSTOWN ROAD UNIT 3H
 +
|-
 +
| First Permit Date: 2012-01-17
 +
|-
 +
| Last Permit Date: 2012-01-17
 +
|-
 +
| Spud Date: 2012-05-19
 +
|-
 +
| Unconventional: Yes
 +
|-
 +
| Horizontal: Yes
 +
|-
 +
| Producing: Yes
 +
|-
 +
| Violations: None
 +
|-
 +
| Latitude: 40.625205
 +
|-
 +
| Longitude: -79.783272
 +
|-
 +
|}
 
__TOC__
 
__TOC__
 
== Well Inspection Data ==
 
== Well Inspection Data ==
{{003-22211-inspection}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
|-
 +
| 2072475
 +
| 2012-05-16
 +
| No Violations Noted
 +
| ACCESS AND PAD ARE COMPLETE. E&S CONTROLS ARE IN PLACE. THE CELLAR IS IN.
 +
|
 +
|-
 +
|-
 +
| 2074535
 +
| 2012-05-31
 +
| No Violations Noted
 +
| CELLAR AND CONDUCTOR ARE IN.
 +
SITE AND E&S, OK.
 +
|
 +
|-
 +
|-
 +
| 2085946
 +
| 2012-07-06
 +
| No Violations Noted
 +
| TOP HOLE DRILLING IS COMPLETE. PATTERSON 317 WILL FINISH THIS WELL.
 +
|
 +
|-
 +
|-
 +
| 2090993
 +
| 2012-08-09
 +
| No Violations Noted
 +
| PATTERSON 317 PULLING DRILL RODS. SITE IS IN GOOD SHAPE.
 +
|
 +
|-
 +
|-
 +
| 2093416
 +
| 2012-07-31
 +
| No Violations Noted
 +
| PATTERSON 317 IS MOVING FROM 5H TO 3H.
 +
DRILLING WILL RESUME AT 2520'.
 +
|
 +
|-
 +
|-
 +
| 2096565
 +
| 2012-08-28
 +
| No Violations Noted
 +
| THE PRODUCTION CASING IS IN AND CEMENTED. THE SITE IS IN GOOD CONDITION.
 +
|
 +
|-
 +
|-
 +
| 2097861
 +
| 2012-09-05
 +
| No Violations Noted
 +
| John Ley, WQS, SWRO was on site to conduct a routine inspection.  At the time of the inspection, the well sign, E&S plan, and well permit were on site.  BMP's installed were functioning according to the E&S plan. Hill sides were temporarily stabilized with good growth.  No accelerated erosion or sedimentation issues were observed on site or on the gated access road.
 +
 
 +
The site was drilled but not frac'd.  Construction on the production equipment/tanks was taking place.
 +
|
 +
|-
 +
|-
 +
| 2106789
 +
| 2012-10-10
 +
| No Violations Noted
 +
| FOUR WELL PAD. ALL BEING FRACED. NO PROBLEMS.
 +
|
 +
|-
 +
|-
 +
| 2109240
 +
| 2012-10-15
 +
| No Violations Noted
 +
| FRAC COMPLETE. EQUIPTMENT MOVING FROM THE SITE.
 +
|
 +
|-
 +
|-
 +
| 2121260
 +
| 2012-11-29
 +
| No Violations Noted
 +
| WELL IS HOOKED UP AND PRODUCING. THE SITE IS IN GOOD CONDITION.
 +
|
 +
|-
 +
|-
 +
| 2123039
 +
| 2012-12-11
 +
| No Violations Noted
 +
| John Ley Water Quality Specialist SWRO was on site to conduct a routine inspection.  The site sign was in place and properly displayed the permits.  The site E&S controls and BMP's were well constructed and in good shape.  The access road was constructed according to plan and E&S controls were working properly.  The well was drilled.  The gathering line for the site was being constructed.  The BMP's were in place and hillsides in this area were temporarily stabilized.
 +
|
 +
|-
 +
|}
 
== Production Data ==
 
== Production Data ==
{{003-22211-production}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2012-2
 +
| style="text-align:right;" | 150585.0
 +
| style="text-align:right;" | 62.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2012-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|}
 
== Waste Data ==
 
== Waste Data ==
{{003-22211-waste}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2012-2
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 595.24
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PAR000519462
 +
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
 +
| NEW CASTLE
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 4795.07
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 29.76
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 39.16
 +
| Tons
 +
| LANDFILL
 +
| 100592
 +
| SOUTH HILLS LANDFILL
 +
| SOUTH HILLS
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 256.93
 +
| Tons
 +
| LANDFILL
 +
| 100280
 +
| USA VALLEY FACILITY, INC
 +
| IRWIN
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 140.75
 +
| Tons
 +
| LANDFILL
 +
| 100172
 +
| WASTE MANAGEMENT, INC  - ARDEN LANDFILL, INC.
 +
| WASHINGTON
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| FLOWBACK FRACTURING SAND
 +
| style="text-align:right;" | 7.74
 +
| Tons
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PAR806239
 +
| WEAVERTOWN ENVIRONMENTAL GROUP
 +
| MCDONALD
 +
| PA
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 428.55
 +
| Tons
 +
| LANDFILL
 +
| 100172
 +
| WASTE MANAGEMENT, INC  - ARDEN LANDFILL, INC.
 +
| WASHINGTON
 +
| PA
 +
|-
 +
|-
 +
| 2012-1
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 42.86
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PAR806239
 +
| WEAVERTOWN ENVIRONMENTAL GROUP
 +
| MCDONALD
 +
| PA
 +
|-
 +
|}
 
__NOEDITSECTION__
 
__NOEDITSECTION__

Revision as of 16:22, 30 April 2014

Well Details

Well ID: 003-22211
Loading map...
County: Allegheny
Municipality: Frazer Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Farm/Lease Name: BAKERSTOWN ROAD UNIT 3H
First Permit Date: 2012-01-17
Last Permit Date: 2012-01-17
Spud Date: 2012-05-19
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 40.625205
Longitude: -79.783272

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2072475 2012-05-16 No Violations Noted ACCESS AND PAD ARE COMPLETE. E&S CONTROLS ARE IN PLACE. THE CELLAR IS IN.
2074535 2012-05-31 No Violations Noted CELLAR AND CONDUCTOR ARE IN.

SITE AND E&S, OK.

2085946 2012-07-06 No Violations Noted TOP HOLE DRILLING IS COMPLETE. PATTERSON 317 WILL FINISH THIS WELL.
2090993 2012-08-09 No Violations Noted PATTERSON 317 PULLING DRILL RODS. SITE IS IN GOOD SHAPE.
2093416 2012-07-31 No Violations Noted PATTERSON 317 IS MOVING FROM 5H TO 3H.

DRILLING WILL RESUME AT 2520'.

2096565 2012-08-28 No Violations Noted THE PRODUCTION CASING IS IN AND CEMENTED. THE SITE IS IN GOOD CONDITION.
2097861 2012-09-05 No Violations Noted John Ley, WQS, SWRO was on site to conduct a routine inspection. At the time of the inspection, the well sign, E&S plan, and well permit were on site. BMP's installed were functioning according to the E&S plan. Hill sides were temporarily stabilized with good growth. No accelerated erosion or sedimentation issues were observed on site or on the gated access road.

The site was drilled but not frac'd. Construction on the production equipment/tanks was taking place.

2106789 2012-10-10 No Violations Noted FOUR WELL PAD. ALL BEING FRACED. NO PROBLEMS.
2109240 2012-10-15 No Violations Noted FRAC COMPLETE. EQUIPTMENT MOVING FROM THE SITE.
2121260 2012-11-29 No Violations Noted WELL IS HOOKED UP AND PRODUCING. THE SITE IS IN GOOD CONDITION.
2123039 2012-12-11 No Violations Noted John Ley Water Quality Specialist SWRO was on site to conduct a routine inspection. The site sign was in place and properly displayed the permits. The site E&S controls and BMP's were well constructed and in good shape. The access road was constructed according to plan and E&S controls were working properly. The well was drilled. The gathering line for the site was being constructed. The BMP's were in place and hillsides in this area were temporarily stabilized.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 150585.0 62.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILLING FLUID WASTE 595.24 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA (NEW CASTLE) NEW CASTLE PA
2012-2 FRACING FLUID WASTE 4795.07 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 29.76 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 DRILL CUTTINGS 39.16 Tons LANDFILL 100592 SOUTH HILLS LANDFILL SOUTH HILLS PA
2012-2 DRILL CUTTINGS 256.93 Tons LANDFILL 100280 USA VALLEY FACILITY, INC IRWIN PA
2012-2 DRILL CUTTINGS 140.75 Tons LANDFILL 100172 WASTE MANAGEMENT, INC - ARDEN LANDFILL, INC. WASHINGTON PA
2012-2 FLOWBACK FRACTURING SAND 7.74 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR806239 WEAVERTOWN ENVIRONMENTAL GROUP MCDONALD PA
2012-1 DRILL CUTTINGS 428.55 Tons LANDFILL 100172 WASTE MANAGEMENT, INC - ARDEN LANDFILL, INC. WASHINGTON PA
2012-1 DRILLING FLUID WASTE 42.86 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR806239 WEAVERTOWN ENVIRONMENTAL GROUP MCDONALD PA