Well ID: 34-035-22138 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.4802784409,"lon":-81.4860547246,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-11-16 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.4802784409 | |
Longitude: -81.4860547246 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1269041678 | 2013-10-22 | The producing unit consists of a mechanical plunger lift unit and above-ground storage tank (AST) battery. The battery is comprised of 1 100-barrel steel production tank and 1 50-barrel brine tank, separator unit, and Dominion metering run. The wellhead and battery are both enclosed in separate board-on-board fences. The load-outs are bull-plugged. The ID and secondary containment are good. The unit is fitted with carbon canister, low-pressure relief valve, and spark arrestor. Gates are locked. Lease road is in good condition and areas impacted by drilling have been restored. No problems noted and passes preliminary restoration. | ||||
-1417512898 | 2010-02-18 | No violations Company on site grading out topsoil which is still wet . | ||||
-1941885355 | 2009-11-20 | walked perimeter with gas meter NO GAS DETECTED or ODORS. Checked blow line 70' to separator set up to control the flow of drill mud to pits
Drilling at 3124' Prognosis for Lockport 2993'-3405' (Newburgh 3180'-3187') |
||||
-480935182 | 2009-11-24 | on site for permit condition cementing 4 1/2"casing | ||||
1061446790 | 2012-01-05 | On 01/05/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. | ||||
1116707684 | 2010-01-13 | company still working on well site. Company met with school to change location of tank battery to south of well into hill side. New location LAT/LONG 41.47991 081.48639 also advise Ralph Gregory
to send Pepper Pike the location. |
||||
1262614080 | 2009-11-16 | On site checking permit condition, digging pits on southwest side, location fenced in with construction fencing; Surface pit lined filling with fire hydrate water ,started to drill hole for conductor.
Estimated cementing time 1:30 -2:00 PM |
||||
1262628486 | 2009-11-16 | cementing conductor pipe 113/4" to 40'with 50 sacks class A cement.
(Company drilling this well while school is on Thanksgiving Break) |
||||
1308097606 | 2009-12-17 | service crew on site preparing to fracture well. | ||||
1349914660 | 2009-11-17 | BOP test passed | ||||
871272847 | 2009-11-17 | drilled surface hole to 395' will set 361' of 85/8" casing with 200 sacks of class A. Good returns to surface Approximately 8 bbls of cement returns to surface.
Berea at 200'-260' (drilling samples) |