If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 318: | Line 318: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0354080314020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.980665,"lon":-111.066641,"icon":""}]} |
Location: 02/14-03-035-08W4/0 | |
Location Alias: 02/14-03-35-08 W4M | |
Location Alias 2: 02/14-03-035-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 08 | |
Section: 03 | |
County/Municipality: Special Areas No. 4 | |
Well Name: KARVE PROVOST 14-3-35-8 | |
Operator Name: Karve Energy Inc. | |
License Number: 0276329 | |
License Date: 2002-11-20 | |
License Status: Issued | |
Spud Date: 2002-11-22 | |
Final Drill Date: 2002-11-23 | |
Well Total Depth: 910.00 m | |
Surface Hole Latitude: 51.980665 | |
Surface Hole Longitude: -111.066641 |
Date | Event |
---|---|
2002-11-20 | Obtained License |
2002-11-22 | Surface Casing Operation Performed |
2002-11-23 | Finished Drilling |
2002-11-24 | Production Casing Operation Performed |
2002-11-24 | Rig Released |
2002-11-24 | Well Mode changed to Drilled and Cased |
2002-12-05 | Well Log Performed |
2002-12-07 | Perforation Treatment Performed - Jet Perforation |
2002-12-07 | Well Log Performed |
2003-01-14 | Well Began Production |
2003-01-14 | Well Fluid changed to Crude Oil |
2003-01-14 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-12-07 | Perforation | 875.00 | 877.00 | 17 |
2002-12-07 | Perforation | 866.50 | 870.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 7773 | 0.0 | 0.0 | 0.0 |
2004 | 8070 | 0.0 | 0.0 | 0.0 |
2005 | 6906 | 0.0 | 0.0 | 0.0 |
2006 | 8477 | 0.0 | 0.0 | 0.0 |
2007 | 8757 | 0.0 | 0.0 | 0.0 |
2008 | 8512 | 0.0 | 0.0 | 0.0 |
2009 | 8590 | 0.0 | 0.0 | 0.0 |
2010 | 8627 | 0.0 | 0.0 | 0.0 |
2011 | 8662 | 0.0 | 0.0 | 0.0 |
2012 | 7763 | 0.0 | 0.0 | 0.0 |
2013 | 7766 | 0.0 | 0.0 | 0.0 |
2014 | 8628 | 0.0 | 0.0 | 0.0 |
2015 | 8564 | 0.0 | 0.0 | 0.0 |
2016 | 7574 | 0.0 | 0.0 | 0.0 |
2017 | 8493 | 0.0 | 0.0 | 0.0 |
2018 | 8543 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]