If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 256: | Line 256: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0354042803002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.028153,"lon":-110.517602,"icon":""}]} |
Location: 00/03-28-035-04W4/2 | |
Location Alias: 00/03-28-35-04 W4M | |
Location Alias 2: 00/03-28-035-04 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 04 | |
Section: 28 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ACL PROVOST 3-28-35-4 | |
Operator Name: Karve Energy Inc. | |
License Number: 0114677 | |
License Date: 1985-05-16 | |
License Status: Issued | |
Spud Date: 1985-05-31 | |
Final Drill Date: 1985-06-03 | |
Well Total Depth: 891.00 m | |
Surface Hole Latitude: 52.028153 | |
Surface Hole Longitude: -110.517602 |
Date | Event |
---|---|
1985-05-16 | Obtained License |
1985-06-01 | Surface Casing Operation Performed |
1985-06-03 | Finished Drilling |
1985-06-03 | Well Mode changed to Drilled and Cased |
1985-06-04 | Well Log Performed |
1985-06-05 | Drill Stem Test Performed |
1985-06-06 | Drill Stem Test Performed |
1985-06-07 | Production Casing Operation Performed |
1985-06-07 | Rig Released |
1985-11-28 | Well Log Performed |
1985-11-29 | Perforation Treatment Performed - Jet Perforation |
1985-12-03 | Perforation Treatment Performed - Fractured |
1985-12-04 | Well Log Performed |
1998-12-18 | Perforation Treatment Performed - Jet Perforation |
1998-12-18 | Well Log Performed |
1998-12-18 | Well Mode changed to Drilled and Cased |
1999-02-01 | Perforation Treatment Performed - Fractured |
2000-05-23 | Well Structure changed to Commingled |
2010-12-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-11-29 | Perforation | 799.50 | 802.00 | 7 |
1985-11-29 | Perforation | 814.50 | 817.00 | 7 |
1985-12-03 | Fracture | 814.50 | 817.00 | 0 |
1998-12-18 | Perforation | 704.00 | 705.00 | 20 |
1998-12-18 | Perforation | 707.00 | 709.00 | 20 |
1999-02-01 | Fracture | 704.00 | 709.00 | 0 |
2010-12-13 | Packing Device Capped w/Cement | 805.50 | 813.50 | 0 |
For data sources see[4]