X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0344260216000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0344260216000
 
| Well ID: 0344260216000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.8945687, -113.5748606 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.894938, -113.576443 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: DEVON WIM 16-2-34-26
+
| Location: 00/16-02-034-26W4/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/16-02-34-26 W4M
 +
|-
 +
| Location Alias 2: 00/16-02-034-26 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 034
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 02
 +
|-
 +
| County/Municipality: [[Kneehill County,_Alberta|Kneehill County]]
 +
|-
 +
| Well Name: CNRL WIM 16-2-34-26
 +
|-
 +
| Operator Name: [[Canadian Natural Resources Limited]]
 +
|-
 +
| License Number: 0323466
 
|-
 
|-
 
| License Date: 2005-01-06
 
| License Date: 2005-01-06
 
|-
 
|-
| Final Drilling Date: 2005-02-25
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 810.0m
+
| Spud Date: 2005-02-20
 
|-
 
|-
| Fluid Type: Cbm and Shale and Other Source
+
| Final Drill Date: 2005-02-25
 
|-
 
|-
| Status: Flowing
+
| Well Total Depth: 810.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 51.894938
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -113.576443
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Violations:
+
| 2005-01-06
 +
| Obtained License
 
|-
 
|-
| Latitude: 51.8945687
+
| 2005-02-21
 +
| Surface Casing Operation Performed
 
|-
 
|-
| Longitude: -113.5748606
+
| 2005-02-25
 +
| Finished Drilling
 +
|-
 +
| 2005-02-25
 +
| Well Log Performed
 +
|-
 +
| 2005-02-25
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2005-02-26
 +
| Production Casing Operation Performed
 +
|-
 +
| 2005-02-26
 +
| Rig Released
 +
|-
 +
| 2005-05-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-05-28
 +
| Well Log Performed
 +
|-
 +
| 2005-05-30
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2005-05-30
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2005-05-30
 +
| Well Mode changed to Testing
 +
|-
 +
| 2005-08-18
 +
| Well Began Production
 +
|-
 +
| 2005-08-18
 +
| Well Fluid changed to Coalbed Methane-Coals Only
 +
|-
 +
| 2005-08-18
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2010-01-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-01-25
 +
| Well Log Performed
 +
|-
 +
| 2010-01-26
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2010-02-02
 +
| Well Fluid changed to CBM and Shale and Other
 +
|-
 +
| 2010-02-02
 +
| Well Mode changed to Flowing
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 323.00
 +
| style="text-align: right;" | 324.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 621.60
 +
| style="text-align: right;" | 622.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 626.00
 +
| style="text-align: right;" | 627.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 638.00
 +
| style="text-align: right;" | 640.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 649.00
 +
| style="text-align: right;" | 651.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 657.30
 +
| style="text-align: right;" | 659.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 672.00
 +
| style="text-align: right;" | 673.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 679.30
 +
| style="text-align: right;" | 682.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 685.00
 +
| style="text-align: right;" | 686.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 692.00
 +
| style="text-align: right;" | 693.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 700.50
 +
| style="text-align: right;" | 701.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 419.00
 +
| style="text-align: right;" | 420.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 703.50
 +
| style="text-align: right;" | 705.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-30
 +
| Fracture
 +
| style="text-align: right;" | 323.00
 +
| style="text-align: right;" | 705.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-01-25
 +
| Perforation
 +
| style="text-align: right;" | 642.00
 +
| style="text-align: right;" | 644.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2010-01-25
 +
| Perforation
 +
| style="text-align: right;" | 557.80
 +
| style="text-align: right;" | 558.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2010-01-25
 +
| Perforation
 +
| style="text-align: right;" | 580.00
 +
| style="text-align: right;" | 582.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2010-01-25
 +
| Perforation
 +
| style="text-align: right;" | 587.50
 +
| style="text-align: right;" | 588.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2010-01-26
 +
| Fracture
 +
| style="text-align: right;" | 642.00
 +
| style="text-align: right;" | 644.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-01-26
 +
| Fracture
 +
| style="text-align: right;" | 557.80
 +
| style="text-align: right;" | 558.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-01-26
 +
| Fracture
 +
| style="text-align: right;" | 580.00
 +
| style="text-align: right;" | 582.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-01-26
 +
| Fracture
 +
| style="text-align: right;" | 587.50
 +
| style="text-align: right;" | 588.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 445.80
 +
| style="text-align: right;" | 446.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 488.40
 +
| style="text-align: right;" | 489.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 547.60
 +
| style="text-align: right;" | 548.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 600.90
 +
| style="text-align: right;" | 601.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 606.00
 +
| style="text-align: right;" | 607.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 610.50
 +
| style="text-align: right;" | 611.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-05-28
 +
| Perforation
 +
| style="text-align: right;" | 617.80
 +
| style="text-align: right;" | 618.80
 +
| style="text-align: right;" | 13
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2005
 +
| style="text-align: right;" | 3283
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 8622
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2007
 +
| style="text-align: right;" | 8741
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2008
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 8685
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 8723
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8783
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8735
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8735
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8783
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8735
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2183
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 11:09, 31 January 2021

Well Details

Well ID: 0344260216000
Loading map...
Location: 00/16-02-034-26W4/0
Location Alias: 00/16-02-34-26 W4M
Location Alias 2: 00/16-02-034-26 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 26
Section: 02
County/Municipality: Kneehill County
Well Name: CNRL WIM 16-2-34-26
Operator Name: Canadian Natural Resources Limited
License Number: 0323466
License Date: 2005-01-06
License Status: Issued
Spud Date: 2005-02-20
Final Drill Date: 2005-02-25
Well Total Depth: 810.00 m
Surface Hole Latitude: 51.894938
Surface Hole Longitude: -113.576443

For data sources see[1][2]

Well History

Date Event
2005-01-06 Obtained License
2005-02-21 Surface Casing Operation Performed
2005-02-25 Finished Drilling
2005-02-25 Well Log Performed
2005-02-25 Well Mode changed to Drilled and Cased
2005-02-26 Production Casing Operation Performed
2005-02-26 Rig Released
2005-05-28 Perforation Treatment Performed - Jet Perforation
2005-05-28 Well Log Performed
2005-05-30 Perforation Treatment Performed - Fractured
2005-05-30 Well Fluid changed to Gas
2005-05-30 Well Mode changed to Testing
2005-08-18 Well Began Production
2005-08-18 Well Fluid changed to Coalbed Methane-Coals Only
2005-08-18 Well Mode changed to Flowing
2010-01-25 Perforation Treatment Performed - Jet Perforation
2010-01-25 Well Log Performed
2010-01-26 Perforation Treatment Performed - Fractured
2010-02-02 Well Fluid changed to CBM and Shale and Other
2010-02-02 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-28 Perforation 323.00 324.00 13
2005-05-28 Perforation 621.60 622.60 13
2005-05-28 Perforation 626.00 627.00 13
2005-05-28 Perforation 638.00 640.00 13
2005-05-28 Perforation 649.00 651.70 13
2005-05-28 Perforation 657.30 659.80 13
2005-05-28 Perforation 672.00 673.00 13
2005-05-28 Perforation 679.30 682.30 13
2005-05-28 Perforation 685.00 686.00 13
2005-05-28 Perforation 692.00 693.00 13
2005-05-28 Perforation 700.50 701.50 13
2005-05-28 Perforation 419.00 420.00 13
2005-05-28 Perforation 703.50 705.00 13
2005-05-30 Fracture 323.00 705.00 0
2010-01-25 Perforation 642.00 644.50 7
2010-01-25 Perforation 557.80 558.60 7
2010-01-25 Perforation 580.00 582.00 7
2010-01-25 Perforation 587.50 588.50 7
2010-01-26 Fracture 642.00 644.50 0
2010-01-26 Fracture 557.80 558.60 0
2010-01-26 Fracture 580.00 582.00 0
2010-01-26 Fracture 587.50 588.50 0
2005-05-28 Perforation 445.80 446.80 13
2005-05-28 Perforation 488.40 489.40 13
2005-05-28 Perforation 547.60 548.60 13
2005-05-28 Perforation 600.90 601.90 13
2005-05-28 Perforation 606.00 607.00 13
2005-05-28 Perforation 610.50 611.50 13
2005-05-28 Perforation 617.80 618.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3283 0.0 0.0 0.0
2006 8622 0.0 0.0 0.0
2007 8741 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8685 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8723 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References