X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0334212713002"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0334212713002
 
| Well ID: 0334212713002
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.864024, -112.90574 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.864024, -112.905740 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/13-27-033-21W4/2
 
| Location: 00/13-27-033-21W4/2
Line 43: Line 43:
 
| Surface Hole Latitude: 51.864024
 
| Surface Hole Latitude: 51.864024
 
|-
 
|-
| Surface Hole Longitude: -112.90574
+
| Surface Hole Longitude: -112.905740
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 150: Line 150:
 
| style="text-align: right;" | 502.00
 
| style="text-align: right;" | 502.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
|-
 
| 2006-01-26
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 490.00
 
| style="text-align: right;" | 498.80
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 424.00
+
| style="text-align: right;" | 297.40
| style="text-align: right;" | 424.30
+
| style="text-align: right;" | 297.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 388.50
+
| style="text-align: right;" | 295.80
| style="text-align: right;" | 389.00
+
| style="text-align: right;" | 296.10
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 367.90
+
| style="text-align: right;" | 286.70
| style="text-align: right;" | 368.50
+
| style="text-align: right;" | 288.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 356.70
+
| style="text-align: right;" | 285.40
| style="text-align: right;" | 357.20
+
| style="text-align: right;" | 286.40
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 314.60
+
| style="text-align: right;" | 279.00
| style="text-align: right;" | 315.50
+
| style="text-align: right;" | 279.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 305.90
+
| style="text-align: right;" | 270.60
| style="text-align: right;" | 306.60
+
| style="text-align: right;" | 274.20
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 303.70
+
| style="text-align: right;" | 266.30
| style="text-align: right;" | 305.10
+
| style="text-align: right;" | 266.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 297.40
+
| style="text-align: right;" | 244.10
| style="text-align: right;" | 297.70
+
| style="text-align: right;" | 244.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 295.80
+
| style="text-align: right;" | 242.20
| style="text-align: right;" | 296.10
+
| style="text-align: right;" | 242.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 286.70
+
| style="text-align: right;" | 224.20
| style="text-align: right;" | 288.00
+
| style="text-align: right;" | 224.90
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 +
|-
 +
| 2006-01-26
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 490.00
 +
| style="text-align: right;" | 498.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-01-27
 +
| Fracture
 +
| style="text-align: right;" | 224.20
 +
| style="text-align: right;" | 424.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 285.40
+
| style="text-align: right;" | 424.00
| style="text-align: right;" | 286.40
+
| style="text-align: right;" | 424.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 279.00
+
| style="text-align: right;" | 388.50
| style="text-align: right;" | 279.70
+
| style="text-align: right;" | 389.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 270.60
+
| style="text-align: right;" | 367.90
| style="text-align: right;" | 274.20
+
| style="text-align: right;" | 368.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 266.30
+
| style="text-align: right;" | 356.70
| style="text-align: right;" | 266.70
+
| style="text-align: right;" | 357.20
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 244.10
+
| style="text-align: right;" | 314.60
| style="text-align: right;" | 244.70
+
| style="text-align: right;" | 315.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 242.20
+
| style="text-align: right;" | 305.90
| style="text-align: right;" | 242.50
+
| style="text-align: right;" | 306.60
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-01-27
 
| 2006-01-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 224.20
+
| style="text-align: right;" | 303.70
| style="text-align: right;" | 224.90
+
| style="text-align: right;" | 305.10
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
|-
 
| 2006-01-27
 
| Fracture
 
| style="text-align: right;" | 224.20
 
| style="text-align: right;" | 424.30
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 417: Line 417:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 04:20, 31 January 2021

Well Details

Well ID: 0334212713002
Loading map...
Location: 00/13-27-033-21W4/2
Location Alias: 00/13-27-33-21 W4M
Location Alias 2: 00/13-27-033-21 W4/02
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 21
Section: 27
County/Municipality: Starland County
Well Name: 981384 RUMSEY 13-27-33-21
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0340598
License Date: 2005-10-20
License Status: Issued
Spud Date: 2005-12-29
Final Drill Date: 2005-12-31
Well Total Depth: 729.00 m
Surface Hole Latitude: 51.864024
Surface Hole Longitude: -112.905740

For data sources see[1][2]

Well History

Date Event
2005-10-20 Obtained License
2005-12-30 Surface Casing Operation Performed
2005-12-31 Finished Drilling
2005-12-31 Well Mode changed to Drilled and Cased
2006-01-01 Production Casing Operation Performed
2006-01-01 Rig Released
2006-01-08 Well Log Performed
2006-01-19 Perforation Treatment Performed - Jet Perforation
2006-01-19 Well Log Performed
2006-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-26 Plug Back Performed
2006-01-27 Perforation Treatment Performed - Fractured
2006-01-27 Perforation Treatment Performed - Jet Perforation
2006-01-27 Well Log Performed
2006-02-06 Well Began Production
2006-02-06 Well Fluid changed to Coalbed Methane-Coals Only
2006-02-06 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-19 Perforation 500.00 502.00 17
2006-01-27 Perforation 297.40 297.70 17
2006-01-27 Perforation 295.80 296.10 17
2006-01-27 Perforation 286.70 288.00 17
2006-01-27 Perforation 285.40 286.40 17
2006-01-27 Perforation 279.00 279.70 17
2006-01-27 Perforation 270.60 274.20 17
2006-01-27 Perforation 266.30 266.70 17
2006-01-27 Perforation 244.10 244.70 17
2006-01-27 Perforation 242.20 242.50 17
2006-01-27 Perforation 224.20 224.90 17
2006-01-26 Packing Device Capped w/Cement 490.00 498.80 0
2006-01-27 Fracture 224.20 424.30 0
2006-01-27 Perforation 424.00 424.30 17
2006-01-27 Perforation 388.50 389.00 17
2006-01-27 Perforation 367.90 368.50 17
2006-01-27 Perforation 356.70 357.20 17
2006-01-27 Perforation 314.60 315.50 17
2006-01-27 Perforation 305.90 306.60 17
2006-01-27 Perforation 303.70 305.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7700 0.0 0.0 0.0
2007 8553 0.0 0.0 0.0
2008 8452 0.0 0.0 0.0
2009 8623 0.0 0.0 0.0
2010 8464 0.0 0.0 0.0
2011 8618 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 1368 0.0 0.0 0.0

For data sources see[5]

References