If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 241: | Line 241: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0304181006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.553827,"lon":-112.455344,"icon":""}]} |
Location: 00/06-10-030-18W4/0 | |
Location Alias: 00/06-10-30-18 W4M | |
Location Alias 2: 00/06-10-030-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 18 | |
Section: 10 | |
County/Municipality: Starland County | |
Well Name: MARQUEE MICHI 6-10-30-18 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0134498 | |
License Date: 1988-06-23 | |
License Status: Suspension | |
Spud Date: 1989-02-23 | |
Final Drill Date: 1989-02-28 | |
Well Total Depth: 1368.00 m | |
Surface Hole Latitude: 51.553827 | |
Surface Hole Longitude: -112.455344 |
Date | Event |
---|---|
1988-06-23 | Obtained License |
1989-02-24 | Surface Casing Operation Performed |
1989-02-28 | Finished Drilling |
1989-02-28 | Well Log Performed |
1989-03-02 | Drill Stem Test Performed |
1989-03-03 | Production Casing Operation Performed |
1989-03-03 | Rig Released |
1989-03-15 | Well Log Performed |
1989-03-16 | Perforation Treatment Performed - Jet Perforation |
1989-03-16 | Well Log Performed |
1989-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-19 | Perforation Treatment Performed - Jet Perforation |
1989-12-09 | Well Mode changed to Drilled and Cased |
1990-03-18 | Well Mode changed to Drilled and Cased |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-03-16 | Perforation | 1348.70 | 1350.50 | 13 |
1989-03-16 | Perforation | 1345.80 | 1347.30 | 13 |
1989-03-16 | Perforation | 1318.00 | 1321.80 | 13 |
1989-03-16 | Perforation | 1315.20 | 1316.60 | 13 |
1989-03-16 | Perforation | 1312.80 | 1314.60 | 13 |
1989-03-17 | Acid Treatment | 1312.80 | 1350.50 | 0 |
1989-03-19 | Perforation | 1278.50 | 1282.50 | 13 |
For data sources see[4]