If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0254250613002 | | Well ID: 0254250613002 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 51.109107, -113.489669 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Location: 00/13-06-025-25W4/2 |
|- | |- | ||
− | | Operator: | + | | Location Alias: 00/13-06-25-25 W4M |
+ | |- | ||
+ | | Location Alias 2: 00/13-06-025-25 W4/02 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 025 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 25 | ||
+ | |- | ||
+ | | Section: 06 | ||
+ | |- | ||
+ | | County/Municipality: [[Wheatland County,_Alberta|Wheatland County]] | ||
+ | |- | ||
+ | | Well Name: EMBER ENTICE 13-6-25-25 | ||
+ | |- | ||
+ | | Operator Name: [[Ember Resources Inc.]] | ||
+ | |- | ||
+ | | License Number: 0380988 | ||
|- | |- | ||
| License Date: 2007-08-24 | | License Date: 2007-08-24 | ||
|- | |- | ||
− | | | + | | License Status: Issued |
|- | |- | ||
− | | | + | | Spud Date: 2007-11-21 |
|- | |- | ||
− | | | + | | Final Drill Date: 2007-11-22 |
|- | |- | ||
− | | | + | | Well Total Depth: 712.00 m |
|- | |- | ||
− | | | + | | Surface Hole Latitude: 51.109107 |
|- | |- | ||
− | | | + | | Surface Hole Longitude: -113.489669 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
|- | |- | ||
− | | | + | | 2007-08-24 |
+ | | Obtained License | ||
|- | |- | ||
− | | | + | | 2007-11-21 |
+ | | Surface Casing Operation Performed | ||
|- | |- | ||
− | | | + | | 2007-11-22 |
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 2007-11-22 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 2007-11-22 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 2007-11-22 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 2007-11-25 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2007-12-09 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2008-01-06 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2008-01-18 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 2008-01-18 | ||
+ | | Well Mode changed to Testing | ||
+ | |- | ||
+ | | 2008-01-26 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 2008-02-11 | ||
+ | | Well Structure changed to Commingled | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2009-09-21 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 2009-12-15 | ||
+ | | Well Log Performed | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 2007-12-09 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 668.00 | ||
+ | | style="text-align: right;" | 671.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 347.60 | ||
+ | | style="text-align: right;" | 348.10 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 320.00 | ||
+ | | style="text-align: right;" | 321.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 285.50 | ||
+ | | style="text-align: right;" | 286.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 282.50 | ||
+ | | style="text-align: right;" | 283.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 361.00 | ||
+ | | style="text-align: right;" | 362.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 390.00 | ||
+ | | style="text-align: right;" | 399.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 385.00 | ||
+ | | style="text-align: right;" | 386.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 365.00 | ||
+ | | style="text-align: right;" | 366.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 547.10 | ||
+ | | style="text-align: right;" | 548.10 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 543.40 | ||
+ | | style="text-align: right;" | 544.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2008-01-06 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 651.00 | ||
+ | | style="text-align: right;" | 654.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 537.30 | ||
+ | | style="text-align: right;" | 537.80 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 550.30 | ||
+ | | style="text-align: right;" | 550.80 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 590.90 | ||
+ | | style="text-align: right;" | 591.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 589.20 | ||
+ | | style="text-align: right;" | 589.70 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 584.90 | ||
+ | | style="text-align: right;" | 585.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 519.50 | ||
+ | | style="text-align: right;" | 520.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 428.20 | ||
+ | | style="text-align: right;" | 428.70 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 425.80 | ||
+ | | style="text-align: right;" | 426.30 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 424.50 | ||
+ | | style="text-align: right;" | 425.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 447.10 | ||
+ | | style="text-align: right;" | 447.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2008-01-26 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 651.00 | ||
+ | | style="text-align: right;" | 654.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 464.60 | ||
+ | | style="text-align: right;" | 467.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 450.90 | ||
+ | | style="text-align: right;" | 451.90 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-21 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 274.50 | ||
+ | | style="text-align: right;" | 591.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 274.50 | ||
+ | | style="text-align: right;" | 275.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 523.00 | ||
+ | | style="text-align: right;" | 525.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 492.50 | ||
+ | | style="text-align: right;" | 494.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 298.30 | ||
+ | | style="text-align: right;" | 299.30 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 417.00 | ||
+ | | style="text-align: right;" | 417.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-09-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 402.60 | ||
+ | | style="text-align: right;" | 403.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 2008 | ||
+ | | style="text-align: right;" | 96 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0254250613002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.109107,"lon":-113.489669,"icon":""}]} |
Location: 00/13-06-025-25W4/2 | |
Location Alias: 00/13-06-25-25 W4M | |
Location Alias 2: 00/13-06-025-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 13-6-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0380988 | |
License Date: 2007-08-24 | |
License Status: Issued | |
Spud Date: 2007-11-21 | |
Final Drill Date: 2007-11-22 | |
Well Total Depth: 712.00 m | |
Surface Hole Latitude: 51.109107 | |
Surface Hole Longitude: -113.489669 |
Date | Event |
---|---|
2007-08-24 | Obtained License |
2007-11-21 | Surface Casing Operation Performed |
2007-11-22 | Finished Drilling |
2007-11-22 | Production Casing Operation Performed |
2007-11-22 | Rig Released |
2007-11-22 | Well Mode changed to Drilled and Cased |
2007-11-25 | Well Log Performed |
2007-12-09 | Perforation Treatment Performed - Jet Perforation |
2008-01-06 | Perforation Treatment Performed - Jet Perforation |
2008-01-18 | Well Fluid changed to Gas |
2008-01-18 | Well Mode changed to Testing |
2008-01-26 | Perforation Treatment Performed - Fractured |
2008-02-11 | Well Structure changed to Commingled |
2009-09-12 | Perforation Treatment Performed - Jet Perforation |
2009-09-21 | Perforation Treatment Performed - Fractured |
2009-12-15 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-12-09 | Perforation | 668.00 | 671.00 | 13 |
2009-09-12 | Perforation | 347.60 | 348.10 | 13 |
2009-09-12 | Perforation | 320.00 | 321.00 | 13 |
2009-09-12 | Perforation | 285.50 | 286.50 | 13 |
2009-09-12 | Perforation | 282.50 | 283.50 | 13 |
2009-09-12 | Perforation | 361.00 | 362.00 | 13 |
2009-09-12 | Perforation | 390.00 | 399.00 | 13 |
2009-09-12 | Perforation | 385.00 | 386.00 | 13 |
2009-09-12 | Perforation | 365.00 | 366.00 | 13 |
2009-09-12 | Perforation | 547.10 | 548.10 | 13 |
2009-09-12 | Perforation | 543.40 | 544.40 | 13 |
2008-01-06 | Perforation | 651.00 | 654.00 | 13 |
2009-09-12 | Perforation | 537.30 | 537.80 | 13 |
2009-09-12 | Perforation | 550.30 | 550.80 | 13 |
2009-09-12 | Perforation | 590.90 | 591.40 | 13 |
2009-09-12 | Perforation | 589.20 | 589.70 | 13 |
2009-09-12 | Perforation | 584.90 | 585.40 | 13 |
2009-09-12 | Perforation | 519.50 | 520.50 | 13 |
2009-09-12 | Perforation | 428.20 | 428.70 | 13 |
2009-09-12 | Perforation | 425.80 | 426.30 | 13 |
2009-09-12 | Perforation | 424.50 | 425.00 | 13 |
2009-09-12 | Perforation | 447.10 | 447.60 | 13 |
2008-01-26 | Fracture | 651.00 | 654.00 | 0 |
2009-09-12 | Perforation | 464.60 | 467.60 | 13 |
2009-09-12 | Perforation | 450.90 | 451.90 | 13 |
2009-09-21 | Fracture | 274.50 | 591.40 | 0 |
2009-09-12 | Perforation | 274.50 | 275.00 | 13 |
2009-09-12 | Perforation | 523.00 | 525.00 | 13 |
2009-09-12 | Perforation | 492.50 | 494.50 | 13 |
2009-09-12 | Perforation | 298.30 | 299.30 | 13 |
2009-09-12 | Perforation | 417.00 | 417.50 | 13 |
2009-09-12 | Perforation | 402.60 | 403.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 96 | 0.0 | 0.0 | 0.0 |
For data sources see[5]