If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0244251808002 | | Well ID: 0244251808002 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 51.044141, -113.470789 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Location: 00/08-18-024-25W4/2 |
|- | |- | ||
− | | Operator: | + | | Location Alias: 00/08-18-24-25 W4M |
+ | |- | ||
+ | | Location Alias 2: 00/08-18-024-25 W4/02 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 024 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 25 | ||
+ | |- | ||
+ | | Section: 18 | ||
+ | |- | ||
+ | | County/Municipality: [[Wheatland County,_Alberta|Wheatland County]] | ||
+ | |- | ||
+ | | Well Name: EMBER ENTICE 8-18-24-25 | ||
+ | |- | ||
+ | | Operator Name: [[Ember Resources Inc.]] | ||
+ | |- | ||
+ | | License Number: 0206346 | ||
|- | |- | ||
| License Date: 1997-09-19 | | License Date: 1997-09-19 | ||
|- | |- | ||
− | | Final Drilling Date: 1997-10- | + | | License Status: Issued |
+ | |- | ||
+ | | Spud Date: 1997-09-27 | ||
+ | |- | ||
+ | | Final Drill Date: 1997-10-03 | ||
+ | |- | ||
+ | | Well Total Depth: 1024.00 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 51.044141 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -113.470789 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1997-09-19 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1997-09-30 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 1997-10-03 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1997-10-03 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1997-10-03 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 1997-10-03 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1997-10-27 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1997-10-30 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1999-09-16 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1999-09-22 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1999-10-01 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 2002-07-02 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2002-10-07 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2002-10-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2002-12-01 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2002-12-15 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2003-01-09 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 2006-01-10 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2006-10-06 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 2006-10-16 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2006-10-16 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2006-10-23 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 2006-10-23 | ||
+ | | Well Fluid changed to Coalbed Methane-Coals Only | ||
+ | |- | ||
+ | | 2006-10-23 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 2017-04-24 | ||
+ | | Well Fluid changed to Coalbed Methane-Coals Only | ||
+ | |- | ||
+ | | 2017-04-24 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1997-10-30 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 919.00 | ||
+ | | style="text-align: right;" | 925.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2003-01-09 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 667.00 | ||
+ | | style="text-align: right;" | 669.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 609.90 | ||
+ | | style="text-align: right;" | 610.90 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 608.20 | ||
+ | | style="text-align: right;" | 608.70 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 572.90 | ||
+ | | style="text-align: right;" | 573.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 570.20 | ||
+ | | style="text-align: right;" | 572.20 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 568.50 | ||
+ | | style="text-align: right;" | 569.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 564.40 | ||
+ | | style="text-align: right;" | 565.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 549.90 | ||
+ | | style="text-align: right;" | 550.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 543.20 | ||
+ | | style="text-align: right;" | 544.20 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 487.10 | ||
+ | | style="text-align: right;" | 487.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-09-16 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 866.00 | ||
+ | | style="text-align: right;" | 869.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 483.40 | ||
+ | | style="text-align: right;" | 484.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 482.10 | ||
+ | | style="text-align: right;" | 482.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 473.60 | ||
+ | | style="text-align: right;" | 474.10 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 472.60 | ||
+ | | style="text-align: right;" | 473.10 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 468.10 | ||
+ | | style="text-align: right;" | 468.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 463.80 | ||
+ | | style="text-align: right;" | 464.30 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 450.00 | ||
+ | | style="text-align: right;" | 450.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 444.20 | ||
+ | | style="text-align: right;" | 444.70 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 436.40 | ||
+ | | style="text-align: right;" | 437.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 427.30 | ||
+ | | style="text-align: right;" | 427.80 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-09-22 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 819.00 | ||
+ | | style="text-align: right;" | 826.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 317.60 | ||
+ | | style="text-align: right;" | 318.10 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-09-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 306.00 | ||
+ | | style="text-align: right;" | 306.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2006-10-06 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 306.00 | ||
+ | | style="text-align: right;" | 610.90 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2006-10-16 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 114.00 | ||
+ | | style="text-align: right;" | 115.00 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 2006-10-16 |
+ | | Remedial Casing Cementing | ||
+ | | style="text-align: right;" | 114.00 | ||
+ | | style="text-align: right;" | 115.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1999-10-01 |
+ | | Fracture | ||
+ | | style="text-align: right;" | 819.00 | ||
+ | | style="text-align: right;" | 869.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2002-07-02 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 906.00 | ||
+ | | style="text-align: right;" | 911.00 | ||
+ | | style="text-align: right;" | 7 | ||
|- | |- | ||
− | | | + | | 2002-10-07 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 775.00 | ||
+ | | style="text-align: right;" | 778.00 | ||
+ | | style="text-align: right;" | 7 | ||
|- | |- | ||
− | | | + | | 2002-10-19 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 718.00 | ||
+ | | style="text-align: right;" | 720.00 | ||
+ | | style="text-align: right;" | 7 | ||
|- | |- | ||
− | | | + | | 2002-12-01 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 705.00 | ||
+ | | style="text-align: right;" | 707.00 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 2002-12-15 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 667.00 | ||
+ | | style="text-align: right;" | 669.00 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 2006 | ||
+ | | style="text-align: right;" | 1674 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2007 | ||
+ | | style="text-align: right;" | 8186 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2008 | ||
+ | | style="text-align: right;" | 8783 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2009 | ||
+ | | style="text-align: right;" | 8759 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | style="text-align: right;" | 7943 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | style="text-align: right;" | 8756 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | style="text-align: right;" | 8080 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | style="text-align: right;" | 8639 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | style="text-align: right;" | 8655 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | style="text-align: right;" | 8662 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | style="text-align: right;" | 8699 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | style="text-align: right;" | 8708 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | style="text-align: right;" | 8750 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | style="text-align: right;" | 8682 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2020 | ||
+ | | style="text-align: right;" | 2162 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0244251808002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.044141,"lon":-113.470789,"icon":""}]} |
Location: 00/08-18-024-25W4/2 | |
Location Alias: 00/08-18-24-25 W4M | |
Location Alias 2: 00/08-18-024-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 18 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 8-18-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0206346 | |
License Date: 1997-09-19 | |
License Status: Issued | |
Spud Date: 1997-09-27 | |
Final Drill Date: 1997-10-03 | |
Well Total Depth: 1024.00 m | |
Surface Hole Latitude: 51.044141 | |
Surface Hole Longitude: -113.470789 |
Date | Event |
---|---|
1997-09-19 | Obtained License |
1997-09-30 | Surface Casing Operation Performed |
1997-10-03 | Finished Drilling |
1997-10-03 | Production Casing Operation Performed |
1997-10-03 | Rig Released |
1997-10-03 | Well Mode changed to Drilled and Cased |
1997-10-27 | Well Log Performed |
1997-10-30 | Perforation Treatment Performed - Jet Perforation |
1999-09-16 | Perforation Treatment Performed - Jet Perforation |
1999-09-22 | Perforation Treatment Performed - Jet Perforation |
1999-10-01 | Perforation Treatment Performed - Fractured |
2002-07-02 | Perforation Treatment Performed - Jet Perforation |
2002-10-07 | Perforation Treatment Performed - Jet Perforation |
2002-10-19 | Perforation Treatment Performed - Jet Perforation |
2002-12-01 | Perforation Treatment Performed - Jet Perforation |
2002-12-15 | Perforation Treatment Performed - Jet Perforation |
2003-01-09 | Perforation Treatment Performed - Fractured |
2006-01-10 | Well Log Performed |
2006-09-28 | Perforation Treatment Performed - Jet Perforation |
2006-10-06 | Perforation Treatment Performed - Fractured |
2006-10-16 | Perforation Treatment Performed - Jet Perforation |
2006-10-16 | Perforation Treatment Performed - Remedial Casing |
2006-10-23 | Well Began Production |
2006-10-23 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-10-23 | Well Mode changed to Flowing |
2017-04-24 | Well Fluid changed to Coalbed Methane-Coals Only |
2017-04-24 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-10-30 | Perforation | 919.00 | 925.00 | 7 |
2003-01-09 | Fracture | 667.00 | 669.00 | 0 |
2006-09-28 | Perforation | 609.90 | 610.90 | 13 |
2006-09-28 | Perforation | 608.20 | 608.70 | 13 |
2006-09-28 | Perforation | 572.90 | 573.40 | 13 |
2006-09-28 | Perforation | 570.20 | 572.20 | 13 |
2006-09-28 | Perforation | 568.50 | 569.00 | 13 |
2006-09-28 | Perforation | 564.40 | 565.40 | 13 |
2006-09-28 | Perforation | 549.90 | 550.40 | 13 |
2006-09-28 | Perforation | 543.20 | 544.20 | 13 |
2006-09-28 | Perforation | 487.10 | 487.60 | 13 |
1999-09-16 | Perforation | 866.00 | 869.00 | 7 |
2006-09-28 | Perforation | 483.40 | 484.40 | 13 |
2006-09-28 | Perforation | 482.10 | 482.60 | 13 |
2006-09-28 | Perforation | 473.60 | 474.10 | 13 |
2006-09-28 | Perforation | 472.60 | 473.10 | 13 |
2006-09-28 | Perforation | 468.10 | 468.60 | 13 |
2006-09-28 | Perforation | 463.80 | 464.30 | 13 |
2006-09-28 | Perforation | 450.00 | 450.50 | 13 |
2006-09-28 | Perforation | 444.20 | 444.70 | 13 |
2006-09-28 | Perforation | 436.40 | 437.40 | 13 |
2006-09-28 | Perforation | 427.30 | 427.80 | 13 |
1999-09-22 | Perforation | 819.00 | 826.00 | 7 |
2006-09-28 | Perforation | 317.60 | 318.10 | 13 |
2006-09-28 | Perforation | 306.00 | 306.50 | 13 |
2006-10-06 | Fracture | 306.00 | 610.90 | 0 |
2006-10-16 | Perforation | 114.00 | 115.00 | 13 |
2006-10-16 | Remedial Casing Cementing | 114.00 | 115.00 | 0 |
1999-10-01 | Fracture | 819.00 | 869.00 | 0 |
2002-07-02 | Perforation | 906.00 | 911.00 | 7 |
2002-10-07 | Perforation | 775.00 | 778.00 | 7 |
2002-10-19 | Perforation | 718.00 | 720.00 | 7 |
2002-12-01 | Perforation | 705.00 | 707.00 | 13 |
2002-12-15 | Perforation | 667.00 | 669.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1674 | 0.0 | 0.0 | 0.0 |
2007 | 8186 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 7943 | 0.0 | 0.0 | 0.0 |
2011 | 8756 | 0.0 | 0.0 | 0.0 |
2012 | 8080 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8662 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]