X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0615113116002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0615113116002
 
| Well ID: 0615113116002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.324722, -115.629176 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.324722, -115.629176 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-31-061-11W5/2
 
| Location: 00/16-31-061-11W5/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/16-31-061-11 W5/02
 
| Location Alias 2: 00/16-31-061-11 W5/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 061
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 11
 +
|-
 +
| Section: 31
 
|-
 
|-
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
Line 17: Line 27:
 
| Well Name: ACCEL HOLDINGS CARSONN 16-31-61-11
 
| Well Name: ACCEL HOLDINGS CARSONN 16-31-61-11
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[ACCEL Canada Holdings Limited]]
 
|-
 
|-
 
| License Number: 0020434
 
| License Number: 0020434
Line 29: Line 39:
 
| Final Drill Date: 1961-03-31
 
| Final Drill Date: 1961-03-31
 
|-
 
|-
| Well Total Depth: 2663.6 m
+
| Well Total Depth: 2663.60 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.324722
 
| Surface Hole Latitude: 54.324722
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1961-02-17
 +
| Obtained License
 +
|-
 +
| 1961-03-05
 +
| Drill Stem Test Performed
 +
|-
 +
| 1961-03-31
 +
| Finished Drilling
 +
|-
 +
| 1961-03-31
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1961-04-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1961-04-02
 +
| Production Casing Operation Performed
 +
|-
 +
| 1961-04-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1961-05-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-01-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-01-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1990-08-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1990-08-18
 +
| Plug Back Performed
 +
|-
 +
| 1990-08-19
 +
| Well Log Performed
 +
|-
 +
| 1990-08-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-08-20
 +
| Well Log Performed
 +
|-
 +
| 1990-08-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1990-08-30
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1990-09-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-09-01
 +
| Well Log Performed
 +
|-
 +
| 1990-09-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1990-09-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-09-11
 +
| Well Log Performed
 +
|-
 +
| 1990-09-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1990-09-12
 +
| Well Log Performed
 +
|-
 +
| 1990-09-13
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1990-09-13
 +
| Plug Back Performed
 +
|-
 +
| 1990-09-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1990-09-14
 +
| Well Log Performed
 +
|-
 +
| 1990-09-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-09-18
 +
| Well Log Performed
 +
|-
 +
| 1990-09-19
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1990-09-19
 +
| Plug Back Performed
 +
|-
 +
| 1990-09-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1990-09-20
 +
| Plug Back Performed
 +
|-
 +
| 1990-09-20
 +
| Well Log Performed
 +
|-
 +
| 1990-09-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1990-11-01
 +
| Well Began Production
 +
|-
 +
| 1990-11-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1990-11-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1992-08-05
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1992-08-06
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1992-08-06
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1992-08-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-08-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-08-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2003-03-06
 +
| Well Log Performed
 +
|-
 +
| 2003-03-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-04
 +
| Well Log Performed
 +
|-
 +
| 2004-11-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-06
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-08
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-09
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2004-11-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-10
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-11
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-12
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2004-11-13
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2004-11-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-13
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-13
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2004-11-13
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2004-11-14
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2004-11-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-23
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-23
 +
| Well Log Performed
 +
|-
 +
| 2004-11-24
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2004-11-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-25
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-25
 +
| Well Log Performed
 +
|-
 +
| 2004-11-26
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2004-11-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-27
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-27
 +
| Well Log Performed
 +
|-
 +
| 2004-11-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-28
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2004-11-28
 +
| Plug Back Performed
 +
|-
 +
| 2004-11-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-11-29
 +
| Well Log Performed
 +
|-
 +
| 2004-11-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-11-30
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2004-11-30
 +
| Plug Back Performed
 +
|-
 +
| 2004-12-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2004-12-02
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2004-12-02
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2004-12-02
 +
| Plug Back Performed
 +
|-
 +
| 2005-12-01
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 387:
 
| 1961-04-28
 
| 1961-04-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2617.6
+
| style="text-align: right;" | 2617.60
| style="text-align: right;" | 2625.5
+
| style="text-align: right;" | 2625.50
| style="text-align: right;" | 7
 
|-
 
| 1961-04-28
 
| Perforation
 
| style="text-align: right;" | 2627.4
 
| style="text-align: right;" | 2629.8
 
| style="text-align: right;" | 7
 
|-
 
| 1961-04-28
 
| Perforation
 
| style="text-align: right;" | 2634.1
 
| style="text-align: right;" | 2638.3
 
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
|-
 
| 1961-05-19
 
| Acid Treatment
 
| style="text-align: right;" | 2617.6
 
| style="text-align: right;" | 2638.3
 
| style="text-align: right;" | 0
 
|-
 
| 1980-01-19
 
| Perforation
 
| style="text-align: right;" | 2601
 
| style="text-align: right;" | 2607.5
 
| style="text-align: right;" | 13
 
|-
 
| 1980-01-20
 
| Acid Treatment
 
| style="text-align: right;" | 2601
 
| style="text-align: right;" | 2607.5
 
| style="text-align: right;" | 0
 
|-
 
| 1990-08-18
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 2595
 
| style="text-align: right;" | 2595
 
| style="text-align: right;" | 0
 
|-
 
| 1990-08-20
 
| Perforation
 
| style="text-align: right;" | 1652
 
| style="text-align: right;" | 1655.1
 
| style="text-align: right;" | 13
 
|-
 
| 1990-08-20
 
| Perforation
 
| style="text-align: right;" | 1612.4
 
| style="text-align: right;" | 1614.2
 
| style="text-align: right;" | 13
 
 
|-
 
|-
 
| 1990-08-28
 
| 1990-08-28
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1612.4
+
| style="text-align: right;" | 1612.40
| style="text-align: right;" | 1614.2
+
| style="text-align: right;" | 1614.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-08-30
 
| 1990-08-30
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1612.4
+
| style="text-align: right;" | 1612.40
| style="text-align: right;" | 1614.2
+
| style="text-align: right;" | 1614.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-09-01
 
| 1990-09-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1388
+
| style="text-align: right;" | 1388.00
| style="text-align: right;" | 1391
+
| style="text-align: right;" | 1391.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-09-01
 
| 1990-09-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1350.4
+
| style="text-align: right;" | 1350.40
| style="text-align: right;" | 1351.4
+
| style="text-align: right;" | 1351.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-09-01
 
| 1990-09-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1353
+
| style="text-align: right;" | 1353.00
| style="text-align: right;" | 1354.5
+
| style="text-align: right;" | 1354.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-09-01
 
| 1990-09-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1355.7
+
| style="text-align: right;" | 1355.70
| style="text-align: right;" | 1358
+
| style="text-align: right;" | 1358.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-09-01
 
| 1990-09-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1359
+
| style="text-align: right;" | 1359.00
| style="text-align: right;" | 1359.5
+
| style="text-align: right;" | 1359.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-09-09
 
| 1990-09-09
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1388
+
| style="text-align: right;" | 1388.00
| style="text-align: right;" | 1391
+
| style="text-align: right;" | 1391.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-09-11
 
| 1990-09-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1662
+
| style="text-align: right;" | 1662.00
| style="text-align: right;" | 1662.5
+
| style="text-align: right;" | 1662.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-09-12
 
| 1990-09-12
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1662
+
| style="text-align: right;" | 1662.00
| style="text-align: right;" | 1662.5
+
| style="text-align: right;" | 1662.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1961-04-28
 +
| Perforation
 +
| style="text-align: right;" | 2627.40
 +
| style="text-align: right;" | 2629.80
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1990-09-13
 
| 1990-09-13
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1612.4
+
| style="text-align: right;" | 1612.40
| style="text-align: right;" | 1614.2
+
| style="text-align: right;" | 1614.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-09-14
 
| 1990-09-14
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1388
+
| style="text-align: right;" | 1388.00
| style="text-align: right;" | 1391
+
| style="text-align: right;" | 1391.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-09-18
 
| 1990-09-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1652
+
| style="text-align: right;" | 1652.00
| style="text-align: right;" | 1655
+
| style="text-align: right;" | 1655.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-09-19
 
| 1990-09-19
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1548.4
+
| style="text-align: right;" | 1548.40
| style="text-align: right;" | 1650
+
| style="text-align: right;" | 1650.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-09-20
 
| 1990-09-20
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1377
+
| style="text-align: right;" | 1377.00
| style="text-align: right;" | 1385
+
| style="text-align: right;" | 1385.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-09-21
 
| 1990-09-21
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1350.4
+
| style="text-align: right;" | 1350.40
| style="text-align: right;" | 1359.5
+
| style="text-align: right;" | 1359.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-08-05
 
| 1992-08-05
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1350.4
+
| style="text-align: right;" | 1350.40
| style="text-align: right;" | 1359.5
+
| style="text-align: right;" | 1359.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-08-07
 
| 1992-08-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1388
+
| style="text-align: right;" | 1388.00
| style="text-align: right;" | 1391
+
| style="text-align: right;" | 1391.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1992-08-09
 
| 1992-08-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1652
+
| style="text-align: right;" | 1652.00
| style="text-align: right;" | 1655
+
| style="text-align: right;" | 1655.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1992-08-11
 
| 1992-08-11
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1652
+
| style="text-align: right;" | 1652.00
| style="text-align: right;" | 1655
+
| style="text-align: right;" | 1655.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1961-04-28
 +
| Perforation
 +
| style="text-align: right;" | 2634.10
 +
| style="text-align: right;" | 2638.30
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2003-03-07
 
| 2003-03-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1651.1
+
| style="text-align: right;" | 1651.10
| style="text-align: right;" | 1654.5
+
| style="text-align: right;" | 1654.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2004-11-05
 
| 2004-11-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2103.7
+
| style="text-align: right;" | 2103.70
| style="text-align: right;" | 2105.7
+
| style="text-align: right;" | 2105.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-06
 
| 2004-11-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2088.5
+
| style="text-align: right;" | 2088.50
| style="text-align: right;" | 2096.5
+
| style="text-align: right;" | 2096.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-06
 
| 2004-11-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1926.5
+
| style="text-align: right;" | 1926.50
| style="text-align: right;" | 1928.5
+
| style="text-align: right;" | 1928.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-08
 
| 2004-11-08
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1911
+
| style="text-align: right;" | 1911.00
| style="text-align: right;" | 1919
+
| style="text-align: right;" | 1919.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-08
 
| 2004-11-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1692
+
| style="text-align: right;" | 1692.00
| style="text-align: right;" | 1694
+
| style="text-align: right;" | 1694.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-09
 
| 2004-11-09
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1692
+
| style="text-align: right;" | 1692.00
| style="text-align: right;" | 1694
+
| style="text-align: right;" | 1694.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-10
 
| 2004-11-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1625.8
+
| style="text-align: right;" | 1625.80
| style="text-align: right;" | 1679.5
+
| style="text-align: right;" | 1679.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-11
 
| 2004-11-11
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1596.5
+
| style="text-align: right;" | 1596.50
| style="text-align: right;" | 1604.5
+
| style="text-align: right;" | 1604.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-11
 
| 2004-11-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1573.5
+
| style="text-align: right;" | 1573.50
| style="text-align: right;" | 1575.5
+
| style="text-align: right;" | 1575.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 +
|-
 +
| 1961-05-19
 +
| Acid Treatment
 +
| style="text-align: right;" | 2617.60
 +
| style="text-align: right;" | 2638.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-12
 
| 2004-11-12
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1573.5
+
| style="text-align: right;" | 1573.50
| style="text-align: right;" | 1575.5
+
| style="text-align: right;" | 1575.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-13
 
| 2004-11-13
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1307.8
+
| style="text-align: right;" | 1307.80
| style="text-align: right;" | 1565
+
| style="text-align: right;" | 1565.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-13
 
| 2004-11-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 604
+
| style="text-align: right;" | 604.00
| style="text-align: right;" | 606
+
| style="text-align: right;" | 606.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-14
 
| 2004-11-14
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 604
+
| style="text-align: right;" | 604.00
| style="text-align: right;" | 606
+
| style="text-align: right;" | 606.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-23
 
| 2004-11-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 561
+
| style="text-align: right;" | 561.00
| style="text-align: right;" | 563
+
| style="text-align: right;" | 563.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-23
 
| 2004-11-23
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 588
+
| style="text-align: right;" | 588.00
| style="text-align: right;" | 596
+
| style="text-align: right;" | 596.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-24
 
| 2004-11-24
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 561
+
| style="text-align: right;" | 561.00
| style="text-align: right;" | 563
+
| style="text-align: right;" | 563.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-25
 
| 2004-11-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 549.5
+
| style="text-align: right;" | 549.50
| style="text-align: right;" | 557.5
+
| style="text-align: right;" | 557.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-25
 
| 2004-11-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 545
+
| style="text-align: right;" | 545.00
| style="text-align: right;" | 547
+
| style="text-align: right;" | 547.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-26
 
| 2004-11-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 545
+
| style="text-align: right;" | 545.00
| style="text-align: right;" | 547
+
| style="text-align: right;" | 547.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1980-01-19
 +
| Perforation
 +
| style="text-align: right;" | 2601.00
 +
| style="text-align: right;" | 2607.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2004-11-27
 
| 2004-11-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 529
+
| style="text-align: right;" | 529.00
| style="text-align: right;" | 539
+
| style="text-align: right;" | 539.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-27
 
| 2004-11-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 505
+
| style="text-align: right;" | 505.00
| style="text-align: right;" | 507
+
| style="text-align: right;" | 507.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-28
 
| 2004-11-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 492.3
+
| style="text-align: right;" | 492.30
| style="text-align: right;" | 500.3
+
| style="text-align: right;" | 500.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-28
 
| 2004-11-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 436
+
| style="text-align: right;" | 436.00
| style="text-align: right;" | 438
+
| style="text-align: right;" | 438.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-28
 
| 2004-11-28
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 436
+
| style="text-align: right;" | 436.00
| style="text-align: right;" | 438
+
| style="text-align: right;" | 438.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-28
 
| 2004-11-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 419
+
| style="text-align: right;" | 419.00
| style="text-align: right;" | 429
+
| style="text-align: right;" | 429.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-29
 
| 2004-11-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 362
+
| style="text-align: right;" | 362.00
| style="text-align: right;" | 364
+
| style="text-align: right;" | 364.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2004-11-30
 
| 2004-11-30
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 362
+
| style="text-align: right;" | 362.00
| style="text-align: right;" | 364
+
| style="text-align: right;" | 364.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-11-30
 
| 2004-11-30
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 337.5
+
| style="text-align: right;" | 337.50
| style="text-align: right;" | 352.8
+
| style="text-align: right;" | 352.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-12-01
 
| 2004-12-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 296
+
| style="text-align: right;" | 296.00
| style="text-align: right;" | 298
+
| style="text-align: right;" | 298.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 +
|-
 +
| 1980-01-20
 +
| Acid Treatment
 +
| style="text-align: right;" | 2601.00
 +
| style="text-align: right;" | 2607.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-12-02
 
| 2004-12-02
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 296
+
| style="text-align: right;" | 296.00
| style="text-align: right;" | 298
+
| style="text-align: right;" | 298.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-12-02
 
| 2004-12-02
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 270.5
+
| style="text-align: right;" | 270.50
| style="text-align: right;" | 289.5
+
| style="text-align: right;" | 289.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1990-08-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2595.00
 +
| style="text-align: right;" | 2595.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1990-08-20
 +
| Perforation
 +
| style="text-align: right;" | 1652.00
 +
| style="text-align: right;" | 1655.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1990-08-20
 +
| Perforation
 +
| style="text-align: right;" | 1612.40
 +
| style="text-align: right;" | 1614.20
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
Line 442: Line 755:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 475: Line 802:
 
| 1990
 
| 1990
 
| style="text-align: right;" | 657
 
| style="text-align: right;" | 657
| style="text-align: right;" | 1588.8
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 54.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1991
 
| 1991
 
| style="text-align: right;" | 6707
 
| style="text-align: right;" | 6707
| style="text-align: right;" | 7876.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2690.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1992
 
| 1992
 
| style="text-align: right;" | 4761
 
| style="text-align: right;" | 4761
| style="text-align: right;" | 2181.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1740.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 495: Line 822:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 510: Line 837:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 00:45, 20 January 2021

Well Details

Well ID: 0615113116002
Loading map...
Location: 00/16-31-061-11W5/2
Location Alias: 00/16-31-61-11 W5M
Location Alias 2: 00/16-31-061-11 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 11
Section: 31
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 16-31-61-11
Operator Name: ACCEL Canada Holdings Limited
License Number: 0020434
License Date: 1961-02-17
License Status: Abandoned
Spud Date: 1961-02-24
Final Drill Date: 1961-03-31
Well Total Depth: 2663.60 m
Surface Hole Latitude: 54.324722
Surface Hole Longitude: -115.629176

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-02-17 Obtained License
1961-03-05 Drill Stem Test Performed
1961-03-31 Finished Drilling
1961-03-31 Well Mode changed to Drilled and Cased
1961-04-01 Drill Stem Test Performed
1961-04-02 Production Casing Operation Performed
1961-04-28 Perforation Treatment Performed - Jet Perforation
1961-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-19 Perforation Treatment Performed - Jet Perforation
1980-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-18 Plug Back Performed
1990-08-19 Well Log Performed
1990-08-20 Perforation Treatment Performed - Jet Perforation
1990-08-20 Well Log Performed
1990-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-01 Perforation Treatment Performed - Jet Perforation
1990-09-01 Well Log Performed
1990-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-11 Perforation Treatment Performed - Jet Perforation
1990-09-11 Well Log Performed
1990-09-12 Perforation Treatment Performed - Cement Squeeze
1990-09-12 Well Log Performed
1990-09-13 Perforation Treatment Performed - Cement Squeeze
1990-09-13 Plug Back Performed
1990-09-14 Perforation Treatment Performed - Cement Squeeze
1990-09-14 Well Log Performed
1990-09-18 Perforation Treatment Performed - Jet Perforation
1990-09-18 Well Log Performed
1990-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-19 Plug Back Performed
1990-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-20 Plug Back Performed
1990-09-20 Well Log Performed
1990-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-01 Well Began Production
1990-11-01 Well Fluid changed to Gas
1990-11-01 Well Mode changed to Flowing
1992-08-05 Perforation Treatment Performed - Cement Plug
1992-08-06 Well Fluid changed to Gas
1992-08-06 Well Mode changed to Suspended
1992-08-07 Perforation Treatment Performed - Jet Perforation
1992-08-09 Perforation Treatment Performed - Jet Perforation
1992-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-06 Well Log Performed
2003-03-07 Perforation Treatment Performed - Jet Perforation
2004-11-04 Well Log Performed
2004-11-05 Perforation Treatment Performed - Jet Perforation
2004-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-06 Perforation Treatment Performed - Jet Perforation
2004-11-06 Plug Back Performed
2004-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-08 Perforation Treatment Performed - Jet Perforation
2004-11-08 Plug Back Performed
2004-11-09 Perforation Treatment Performed - Remedial Casing
2004-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-10 Plug Back Performed
2004-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-11 Perforation Treatment Performed - Jet Perforation
2004-11-11 Plug Back Performed
2004-11-12 Perforation Treatment Performed - Remedial Casing
2004-11-13 Perforation Treatment Performed - Cement Plug
2004-11-13 Perforation Treatment Performed - Jet Perforation
2004-11-13 Plug Back Performed
2004-11-13 Well Fluid changed to Gas
2004-11-13 Well Mode changed to Abandoned Zone
2004-11-14 Perforation Treatment Performed - Remedial Casing
2004-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-23 Perforation Treatment Performed - Jet Perforation
2004-11-23 Plug Back Performed
2004-11-23 Well Log Performed
2004-11-24 Perforation Treatment Performed - Remedial Casing
2004-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-25 Perforation Treatment Performed - Jet Perforation
2004-11-25 Plug Back Performed
2004-11-25 Well Log Performed
2004-11-26 Perforation Treatment Performed - Remedial Casing
2004-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-27 Perforation Treatment Performed - Jet Perforation
2004-11-27 Plug Back Performed
2004-11-27 Well Log Performed
2004-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-28 Perforation Treatment Performed - Jet Perforation
2004-11-28 Perforation Treatment Performed - Remedial Casing
2004-11-28 Plug Back Performed
2004-11-29 Perforation Treatment Performed - Jet Perforation
2004-11-29 Well Log Performed
2004-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-30 Perforation Treatment Performed - Remedial Casing
2004-11-30 Plug Back Performed
2004-12-01 Perforation Treatment Performed - Jet Perforation
2004-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-02 Perforation Treatment Performed - Remedial Casing
2004-12-02 Plug Back Performed
2005-12-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-04-28 Perforation 2617.60 2625.50 7
1990-08-28 Acid Treatment 1612.40 1614.20 0
1990-08-30 Acid Treatment 1612.40 1614.20 0
1990-09-01 Perforation 1388.00 1391.00 13
1990-09-01 Perforation 1350.40 1351.40 13
1990-09-01 Perforation 1353.00 1354.50 13
1990-09-01 Perforation 1355.70 1358.00 13
1990-09-01 Perforation 1359.00 1359.50 13
1990-09-09 Acid Treatment 1388.00 1391.00 0
1990-09-11 Perforation 1662.00 1662.50 13
1990-09-12 Cement Squeeze 1662.00 1662.50 0
1961-04-28 Perforation 2627.40 2629.80 7
1990-09-13 Cement Squeeze 1612.40 1614.20 0
1990-09-14 Cement Squeeze 1388.00 1391.00 0
1990-09-18 Perforation 1652.00 1655.00 13
1990-09-19 Packing Device Capped w/Cement 1548.40 1650.00 0
1990-09-20 Packing Device Capped w/Cement 1377.00 1385.00 0
1990-09-21 Acid Treatment 1350.40 1359.50 0
1992-08-05 Cement Plug 1350.40 1359.50 0
1992-08-07 Perforation 1388.00 1391.00 13
1992-08-09 Perforation 1652.00 1655.00 13
1992-08-11 Acid Treatment 1652.00 1655.00 0
1961-04-28 Perforation 2634.10 2638.30 7
2003-03-07 Perforation 1651.10 1654.50 13
2004-11-05 Perforation 2103.70 2105.70 17
2004-11-06 Packing Device Capped w/Cement 2088.50 2096.50 0
2004-11-06 Perforation 1926.50 1928.50 17
2004-11-08 Packing Device Capped w/Cement 1911.00 1919.00 0
2004-11-08 Perforation 1692.00 1694.00 17
2004-11-09 Remedial Casing Cementing 1692.00 1694.00 0
2004-11-10 Packing Device Capped w/Cement 1625.80 1679.50 0
2004-11-11 Packing Device Capped w/Cement 1596.50 1604.50 0
2004-11-11 Perforation 1573.50 1575.50 17
1961-05-19 Acid Treatment 2617.60 2638.30 0
2004-11-12 Remedial Casing Cementing 1573.50 1575.50 0
2004-11-13 Cement Plug 1307.80 1565.00 0
2004-11-13 Perforation 604.00 606.00 17
2004-11-14 Remedial Casing Cementing 604.00 606.00 0
2004-11-23 Perforation 561.00 563.00 17
2004-11-23 Packing Device Capped w/Cement 588.00 596.00 0
2004-11-24 Remedial Casing Cementing 561.00 563.00 0
2004-11-25 Packing Device Capped w/Cement 549.50 557.50 0
2004-11-25 Perforation 545.00 547.00 17
2004-11-26 Remedial Casing Cementing 545.00 547.00 0
1980-01-19 Perforation 2601.00 2607.50 13
2004-11-27 Packing Device Capped w/Cement 529.00 539.00 0
2004-11-27 Perforation 505.00 507.00 17
2004-11-28 Packing Device Capped w/Cement 492.30 500.30 0
2004-11-28 Perforation 436.00 438.00 17
2004-11-28 Remedial Casing Cementing 436.00 438.00 0
2004-11-28 Packing Device Capped w/Cement 419.00 429.00 0
2004-11-29 Perforation 362.00 364.00 17
2004-11-30 Remedial Casing Cementing 362.00 364.00 0
2004-11-30 Packing Device Capped w/Cement 337.50 352.80 0
2004-12-01 Perforation 296.00 298.00 17
1980-01-20 Acid Treatment 2601.00 2607.50 0
2004-12-02 Remedial Casing Cementing 296.00 298.00 0
2004-12-02 Packing Device Capped w/Cement 270.50 289.50 0
1990-08-18 Packing Device Capped w/Cement 2595.00 2595.00 0
1990-08-20 Perforation 1652.00 1655.10 13
1990-08-20 Perforation 1612.40 1614.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 657 0.0 0.0 0.0
1991 6707 0.0 0.0 0.0
1992 4761 0.0 0.0 0.0

For data sources see[5]

References