X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0434102110002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0434102110002
 
| Well ID: 0434102110002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.722832, -111.389733 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.722832, -111.389733 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-21-043-10W4/2
 
| Location: 00/10-21-043-10W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/10-21-043-10 W4/02
 
| Location Alias 2: 00/10-21-043-10 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 043
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 10
 +
|-
 +
| Section: 21
 
|-
 
|-
 
| County/Municipality: [[Flagstaff County,_Alberta|Flagstaff County]]
 
| County/Municipality: [[Flagstaff County,_Alberta|Flagstaff County]]
Line 17: Line 27:
 
| Well Name: CLEO ENERGY KILLAM 10-21-43-10
 
| Well Name: CLEO ENERGY KILLAM 10-21-43-10
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cleo Energy Corp.]]
 
|-
 
|-
 
| License Number: 0060900
 
| License Number: 0060900
Line 29: Line 39:
 
| Final Drill Date: 1976-11-06
 
| Final Drill Date: 1976-11-06
 
|-
 
|-
| Well Total Depth: 777.2 m
+
| Well Total Depth: 777.20 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.722832
 
| Surface Hole Latitude: 52.722832
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1976-11-01
 +
| Obtained License
 +
|-
 +
| 1976-11-02
 +
| Lost Circulation Occurred
 +
|-
 +
| 1976-11-06
 +
| Finished Drilling
 +
|-
 +
| 1976-11-06
 +
| Production Casing Operation Performed
 +
|-
 +
| 1976-11-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-08-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1977-08-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-08-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-11-01
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1983-01-19
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1983-01-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1983-01-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-04-27
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2008-04-27
 +
| Well Log Performed
 +
|-
 +
| 2008-04-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-04-28
 +
| Plug Back Performed
 +
|-
 +
| 2008-04-28
 +
| Well Log Performed
 +
|-
 +
| 2008-05-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-05-03
 +
| Plug Back Performed
 +
|-
 +
| 2008-05-03
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2008-05-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-05-04
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-05-04
 +
| Well Log Performed
 +
|-
 +
| 2008-05-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-05-05
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-05-05
 +
| Well Log Performed
 +
|-
 +
| 2008-05-06
 +
| Well Log Performed
 +
|-
 +
| 2008-05-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2008-05-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-05-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-05-12
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-05-20
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 195:
 
| 1976-11-11
 
| 1976-11-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 608.4
+
| style="text-align: right;" | 608.40
| style="text-align: right;" | 609.9
+
| style="text-align: right;" | 609.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 1977-08-07
 
| Perforation
 
| style="text-align: right;" | 722.4
 
| style="text-align: right;" | 723.6
 
| style="text-align: right;" | 7
 
|-
 
| 1977-08-07
 
| Perforation
 
| style="text-align: right;" | 717.8
 
| style="text-align: right;" | 719
 
| style="text-align: right;" | 7
 
|-
 
| 1977-08-07
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 720.9
 
| style="text-align: right;" | 720.9
 
| style="text-align: right;" | 0
 
|-
 
| 1977-08-07
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 714.8
 
| style="text-align: right;" | 714.8
 
| style="text-align: right;" | 0
 
|-
 
| 1977-08-08
 
| Perforation
 
| style="text-align: right;" | 688.2
 
| style="text-align: right;" | 689.8
 
| style="text-align: right;" | 7
 
|-
 
| 1983-01-19
 
| Perforation
 
| style="text-align: right;" | 252
 
| style="text-align: right;" | 252.3
 
| style="text-align: right;" | 15
 
|-
 
| 1983-01-19
 
| Cement Squeeze
 
| style="text-align: right;" | 252
 
| style="text-align: right;" | 252.3
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1983-01-26
 
| 1983-01-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 608.4
+
| style="text-align: right;" | 602.90
| style="text-align: right;" | 609.9
+
| style="text-align: right;" | 605.90
| style="text-align: right;" | 13
 
|-
 
| 1983-01-26
 
| Perforation
 
| style="text-align: right;" | 602.9
 
| style="text-align: right;" | 605.9
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2008-04-27
 
| 2008-04-27
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 703.5
+
| style="text-align: right;" | 703.50
| style="text-align: right;" | 714.8
+
| style="text-align: right;" | 714.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-04-28
 
| 2008-04-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 666
+
| style="text-align: right;" | 666.00
| style="text-align: right;" | 677
+
| style="text-align: right;" | 677.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-05-03
 
| 2008-05-03
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 582
+
| style="text-align: right;" | 582.00
| style="text-align: right;" | 593
+
| style="text-align: right;" | 593.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-05-04
 
| 2008-05-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 347
+
| style="text-align: right;" | 347.00
| style="text-align: right;" | 348
+
| style="text-align: right;" | 348.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-05-04
 
| 2008-05-04
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 347
+
| style="text-align: right;" | 347.00
| style="text-align: right;" | 348
+
| style="text-align: right;" | 348.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-05-05
 
| 2008-05-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 227
+
| style="text-align: right;" | 227.00
| style="text-align: right;" | 228
+
| style="text-align: right;" | 228.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-05-05
 
| 2008-05-05
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 227
+
| style="text-align: right;" | 227.00
| style="text-align: right;" | 228
+
| style="text-align: right;" | 228.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-05-12
 
| 2008-05-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 480
+
| style="text-align: right;" | 480.00
| style="text-align: right;" | 481
+
| style="text-align: right;" | 481.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2008-05-12
 
| 2008-05-12
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 480
+
| style="text-align: right;" | 480.00
| style="text-align: right;" | 481
+
| style="text-align: right;" | 481.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-07
 +
| Perforation
 +
| style="text-align: right;" | 722.40
 +
| style="text-align: right;" | 723.60
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2008-05-12
 
| 2008-05-12
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 480
+
| style="text-align: right;" | 480.00
| style="text-align: right;" | 481
+
| style="text-align: right;" | 481.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-05-12
 
| 2008-05-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 457
+
| style="text-align: right;" | 457.00
| style="text-align: right;" | 476
+
| style="text-align: right;" | 476.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-07
 +
| Perforation
 +
| style="text-align: right;" | 717.80
 +
| style="text-align: right;" | 719.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1977-08-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 720.90
 +
| style="text-align: right;" | 720.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 714.80
 +
| style="text-align: right;" | 714.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-08
 +
| Perforation
 +
| style="text-align: right;" | 688.20
 +
| style="text-align: right;" | 689.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1983-01-19
 +
| Perforation
 +
| style="text-align: right;" | 252.00
 +
| style="text-align: right;" | 252.30
 +
| style="text-align: right;" | 15
 +
|-
 +
| 1983-01-19
 +
| Cement Squeeze
 +
| style="text-align: right;" | 252.00
 +
| style="text-align: right;" | 252.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1983-01-26
 +
| Perforation
 +
| style="text-align: right;" | 608.40
 +
| style="text-align: right;" | 609.90
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
Line 202: Line 323:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 251: Line 386:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 23:13, 19 January 2021

Well Details

Well ID: 0434102110002
Loading map...
Location: 00/10-21-043-10W4/2
Location Alias: 00/10-21-43-10 W4M
Location Alias 2: 00/10-21-043-10 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 10
Section: 21
County/Municipality: Flagstaff County
Well Name: CLEO ENERGY KILLAM 10-21-43-10
Operator Name: Cleo Energy Corp.
License Number: 0060900
License Date: 1976-11-01
License Status: Suspension
Spud Date: 1976-11-02
Final Drill Date: 1976-11-06
Well Total Depth: 777.20 m
Surface Hole Latitude: 52.722832
Surface Hole Longitude: -111.389733

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-01 Obtained License
1976-11-02 Lost Circulation Occurred
1976-11-06 Finished Drilling
1976-11-06 Production Casing Operation Performed
1976-11-11 Perforation Treatment Performed - Jet Perforation
1977-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-08-07 Perforation Treatment Performed - Jet Perforation
1977-08-08 Perforation Treatment Performed - Jet Perforation
1977-11-01 Well Mode changed to Drilled and Cased
1983-01-19 Perforation Treatment Performed - Cement Squeeze
1983-01-19 Perforation Treatment Performed - Jet Perforation
1983-01-26 Perforation Treatment Performed - Jet Perforation
2008-04-27 Perforation Treatment Performed - Cement Plug
2008-04-27 Well Log Performed
2008-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-04-28 Plug Back Performed
2008-04-28 Well Log Performed
2008-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-05-03 Plug Back Performed
2008-05-03 Well Mode changed to Abandoned Zone
2008-05-04 Perforation Treatment Performed - Jet Perforation
2008-05-04 Perforation Treatment Performed - Remedial Casing
2008-05-04 Well Log Performed
2008-05-05 Perforation Treatment Performed - Jet Perforation
2008-05-05 Perforation Treatment Performed - Remedial Casing
2008-05-05 Well Log Performed
2008-05-06 Well Log Performed
2008-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-05-12 Perforation Treatment Performed - Jet Perforation
2008-05-12 Perforation Treatment Performed - Remedial Casing
2008-05-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-11 Perforation 608.40 609.90 13
1983-01-26 Perforation 602.90 605.90 13
2008-04-27 Cement Plug 703.50 714.80 0
2008-04-28 Packing Device Capped w/Cement 666.00 677.00 0
2008-05-03 Packing Device Capped w/Cement 582.00 593.00 0
2008-05-04 Perforation 347.00 348.00 20
2008-05-04 Remedial Casing Cementing 347.00 348.00 0
2008-05-05 Perforation 227.00 228.00 20
2008-05-05 Remedial Casing Cementing 227.00 228.00 0
2008-05-12 Perforation 480.00 481.00 20
2008-05-12 Acid Treatment 480.00 481.00 0
1977-08-07 Perforation 722.40 723.60 7
2008-05-12 Remedial Casing Cementing 480.00 481.00 0
2008-05-12 Packing Device Capped w/Cement 457.00 476.00 0
1977-08-07 Perforation 717.80 719.00 7
1977-08-07 Packing Device Capped w/Cement 720.90 720.90 0
1977-08-07 Packing Device Capped w/Cement 714.80 714.80 0
1977-08-08 Perforation 688.20 689.80 7
1983-01-19 Perforation 252.00 252.30 15
1983-01-19 Cement Squeeze 252.00 252.30 0
1983-01-26 Perforation 608.40 609.90 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-11-02 Lost Circulation 19.50 46.00

For data sources see[5]

References