X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0515031806000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0515031806000
 
| Well ID: 0515031806000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.40282300000001214, -114.432487999999978 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.402823, -114.432488 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-18-051-03W5/0
 
| Location: 00/06-18-051-03W5/0
 +
|-
 +
| Location Alias: 00/06-18-51-03 W5M
 +
|-
 +
| Location Alias 2: 00/06-18-051-03 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 051
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 18
 +
|-
 +
| County/Municipality: [[Parkland County,_Alberta|Parkland County]]
 
|-
 
|-
 
| Well Name: ESSO ET AL HIGHVALE 6-18-51-3
 
| Well Name: ESSO ET AL HIGHVALE 6-18-51-3
 +
|-
 +
| Operator Name: [[Imperial Oil Resources Limited]]
 +
|-
 +
| License Number: 0119672
 
|-
 
|-
 
| License Date: 1985-11-26
 
| License Date: 1985-11-26
 
|-
 
|-
| Final Drilling Date: 1985-12-19
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1985-12-15
 +
|-
 +
| Final Drill Date: 1985-12-19
 +
|-
 +
| Well Total Depth: 1130.00 m
 +
|-
 +
| Surface Hole Latitude: 53.402823
 +
|-
 +
| Surface Hole Longitude: -114.432488
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1985-11-26
 +
| Obtained License
 +
|-
 +
| 1985-12-16
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-12-19
 +
| Finished Drilling
 +
|-
 +
| 1985-12-19
 +
| Well Log Performed
 +
|-
 +
| 1985-12-19
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1985-12-20
 +
| Production Casing Operation Performed
 +
|-
 +
| 1985-12-20
 +
| Rig Released
 +
|-
 +
| 1986-01-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-01-10
 +
| Well Began Production
 +
|-
 +
| 1986-01-10
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1986-01-10
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1989-07-21
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1989-07-21
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1989-07-27
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1989-07-27
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1993-08-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1993-08-26
 +
| Plug Back Performed
 +
|-
 +
| 1993-08-26
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1993-08-26
 +
| Well Log Performed
 +
|-
 +
| 1993-08-26
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1993-09-07
 +
| Well Abandoned
 +
|-
 +
| 2012-09-23
 +
| Well Log Performed
 +
|-
 +
| 2012-10-30
 +
| Well Log Performed
 
|-
 
|-
| Total Depth: 1130.0m
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Fluid Type: Crude Oil
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Status: Abandoned
+
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
| Well Type: Not Applicable
+
| 1986-01-06
 +
| Perforation
 +
| style="text-align: right;" | 1105.50
 +
| style="text-align: right;" | 1107.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 1993-08-26
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1089.50
 +
| style="text-align: right;" | 1097.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 53.40282300000001214
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| Longitude: -114.432487999999978
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1986
 +
| style="text-align: right;" | 3794
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1987
 +
| style="text-align: right;" | 3115
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1988
 +
| style="text-align: right;" | 7426
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1989
 +
| style="text-align: right;" | 3286
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 22:52, 19 January 2021

Well Details

Well ID: 0515031806000
Loading map...
Location: 00/06-18-051-03W5/0
Location Alias: 00/06-18-51-03 W5M
Location Alias 2: 00/06-18-051-03 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 03
Section: 18
County/Municipality: Parkland County
Well Name: ESSO ET AL HIGHVALE 6-18-51-3
Operator Name: Imperial Oil Resources Limited
License Number: 0119672
License Date: 1985-11-26
License Status: RecCertified
Spud Date: 1985-12-15
Final Drill Date: 1985-12-19
Well Total Depth: 1130.00 m
Surface Hole Latitude: 53.402823
Surface Hole Longitude: -114.432488

For data sources see[1][2]

Well History

Date Event
1985-11-26 Obtained License
1985-12-16 Surface Casing Operation Performed
1985-12-19 Finished Drilling
1985-12-19 Well Log Performed
1985-12-19 Well Mode changed to Drilled and Cased
1985-12-20 Production Casing Operation Performed
1985-12-20 Rig Released
1986-01-06 Perforation Treatment Performed - Jet Perforation
1986-01-10 Well Began Production
1986-01-10 Well Fluid changed to Crude Oil
1986-01-10 Well Mode changed to Flowing
1989-07-21 Well Fluid changed to Crude Oil
1989-07-21 Well Mode changed to Pumping
1989-07-27 Well Fluid changed to Crude Oil
1989-07-27 Well Mode changed to Suspended
1993-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-26 Plug Back Performed
1993-08-26 Well Fluid changed to Crude Oil
1993-08-26 Well Log Performed
1993-08-26 Well Mode changed to Abandoned
1993-09-07 Well Abandoned
2012-09-23 Well Log Performed
2012-10-30 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-06 Perforation 1105.50 1107.00 13
1993-08-26 Packing Device Capped w/Cement 1089.50 1097.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 3794 0.0 0.0 0.0
1987 3115 0.0 0.0 0.0
1988 7426 0.0 0.0 0.0
1989 3286 0.0 0.0 0.0

For data sources see[5]

References