If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 239: | Line 239: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0234180905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.94167,"lon":-112.467586,"icon":""}]} |
Location: 00/05-09-023-18W4/0 | |
Location Alias: 00/05-09-23-18 W4M | |
Location Alias 2: 00/05-09-023-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 18 | |
Section: 09 | |
County/Municipality: County of Newell | |
Well Name: EDALIS ENERGY COUNTESS 5-9-23-18 | |
Operator Name: Edalis Energy Inc. | |
License Number: 0214875 | |
License Date: 1998-05-01 | |
License Status: Amended | |
Spud Date: 1998-05-13 | |
Final Drill Date: 1998-05-17 | |
Well Total Depth: 1305.00 m | |
Surface Hole Latitude: 50.941670 | |
Surface Hole Longitude: -112.467586 |
Date | Event |
---|---|
1998-05-01 | Obtained License |
1998-05-14 | Surface Casing Operation Performed |
1998-05-17 | Finished Drilling |
1998-05-17 | Well Log Performed |
1998-05-18 | Drill Stem Test Performed |
1998-05-19 | Production Casing Operation Performed |
1998-05-19 | Rig Released |
1998-05-19 | Well Mode changed to Drilled and Cased |
1998-09-10 | Well Log Performed |
1999-05-08 | Perforation Treatment Performed - Jet Perforation |
1999-05-08 | Well Log Performed |
2001-09-17 | Perforation Treatment Performed - Jet Perforation |
2001-09-17 | Well Log Performed |
2001-09-19 | Well Log Performed |
2001-10-12 | Well Log Performed |
2001-10-13 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-05-08 | Perforation | 1246.50 | 1249.50 | 17 |
2001-09-17 | Perforation | 1273.00 | 1276.00 | 17 |
2001-09-17 | Perforation | 1268.00 | 1271.50 | 17 |
2001-10-13 | Cement Squeeze | 1246.50 | 1249.50 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2001-10-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]