X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0605090207000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0605090207000
 
| Well ID: 0605090207000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.152932, -115.23202 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.152932, -115.232020 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-02-060-09W5/0
 
| Location: 00/07-02-060-09W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/07-02-060-09 W5/00
 
| Location Alias 2: 00/07-02-060-09 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 060
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 09
 +
|-
 +
| Section: 02
 
|-
 
|-
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
 
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
Line 17: Line 27:
 
| Well Name: IMP LOMBELL NORTH 7-2-60-9
 
| Well Name: IMP LOMBELL NORTH 7-2-60-9
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Canadian Natural Resources Limited]]
 
|-
 
|-
 
| License Number: 0023641
 
| License Number: 0023641
Line 29: Line 39:
 
| Final Drill Date: 1963-02-03
 
| Final Drill Date: 1963-02-03
 
|-
 
|-
| Well Total Depth: 1590.4 m
+
| Well Total Depth: 1590.40 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.152932
 
| Surface Hole Latitude: 54.152932
 
|-
 
|-
| Surface Hole Longitude: -115.23202
+
| Surface Hole Longitude: -115.232020
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1963-01-11
 +
| Obtained License
 +
|-
 +
| 1963-01-13
 +
| Lost Circulation Occurred
 +
|-
 +
| 1963-01-30
 +
| Drill Stem Test Performed
 +
|-
 +
| 1963-02-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1963-02-03
 +
| Finished Drilling
 +
|-
 +
| 1963-02-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1963-02-05
 +
| Production Casing Operation Performed
 +
|-
 +
| 1963-02-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1963-02-16
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1963-02-17
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1963-02-17
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1963-04-02
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1969-02-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1969-02-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1970-08-11
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2003-07-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2003-07-06
 +
| Plug Back Performed
 +
|-
 +
| 2003-07-06
 +
| Well Log Performed
 +
|-
 +
| 2003-07-06
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2003-07-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-07-07
 +
| Well Log Performed
 +
|-
 +
| 2003-07-09
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-08-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-08-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-08-25
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2006-08-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-08-26
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2006-08-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-08-26
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-08-26
 +
| Plug Back Performed
 +
|-
 +
| 2006-08-26
 +
| Well Log Performed
 +
|-
 +
| 2006-08-28
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 73: Line 194:
 
|-
 
|-
 
| 1963-02-16
 
| 1963-02-16
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 1550.5
+
| style="text-align: right;" | 1550.50
| style="text-align: right;" | 1553
+
| style="text-align: right;" | 1553.00
| style="text-align: right;" | 0
 
|-
 
| 1963-02-16
 
| Perforation
 
| style="text-align: right;" | 1554.8
 
| style="text-align: right;" | 1556
 
| style="text-align: right;" | 7
 
|-
 
| 1963-02-17
 
| Acid Wash 
 
| style="text-align: right;" | 1550.5
 
| style="text-align: right;" | 1556
 
| style="text-align: right;" | 0
 
|-
 
| 1963-02-17
 
| Fracture
 
| style="text-align: right;" | 1550.5
 
| style="text-align: right;" | 1556
 
| style="text-align: right;" | 0
 
|-
 
| 1969-02-05
 
| Perforation
 
| style="text-align: right;" | 1560.6
 
| style="text-align: right;" | 1566.7
 
| style="text-align: right;" | 7
 
|-
 
| 1969-02-13
 
| Acid Treatment
 
| style="text-align: right;" | 1560.6
 
| style="text-align: right;" | 1566.7
 
| style="text-align: right;" | 0
 
|-
 
| 2003-07-06
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1537
 
| style="text-align: right;" | 1545
 
| style="text-align: right;" | 0
 
|-
 
| 2003-07-07
 
| Perforation
 
| style="text-align: right;" | 1298.4
 
| style="text-align: right;" | 1303.3
 
| style="text-align: right;" | 20
 
|-
 
| 2003-07-09
 
| Fracture
 
| style="text-align: right;" | 1298.4
 
| style="text-align: right;" | 1303.3
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-08-23
 
| 2006-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1550
+
| style="text-align: right;" | 1550.00
| style="text-align: right;" | 1553
+
| style="text-align: right;" | 1553.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2006-08-23
 
| 2006-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1554
+
| style="text-align: right;" | 1554.00
| style="text-align: right;" | 1556
+
| style="text-align: right;" | 1556.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2006-08-23
 
| 2006-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1560.6
+
| style="text-align: right;" | 1560.60
| style="text-align: right;" | 1566.7
+
| style="text-align: right;" | 1566.70
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2006-08-25
 
| 2006-08-25
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1550
+
| style="text-align: right;" | 1550.00
| style="text-align: right;" | 1556
+
| style="text-align: right;" | 1556.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-08-25
 
| 2006-08-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1493
+
| style="text-align: right;" | 1493.00
| style="text-align: right;" | 1547
+
| style="text-align: right;" | 1547.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-08-25
 
| 2006-08-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1547
+
| style="text-align: right;" | 1547.00
| style="text-align: right;" | 1558
+
| style="text-align: right;" | 1558.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-08-26
 
| 2006-08-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 253
+
| style="text-align: right;" | 253.00
| style="text-align: right;" | 256
+
| style="text-align: right;" | 256.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-08-26
 
| 2006-08-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 253
+
| style="text-align: right;" | 253.00
| style="text-align: right;" | 256
+
| style="text-align: right;" | 256.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-08-26
 
| 2006-08-26
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 78
+
| style="text-align: right;" | 78.00
| style="text-align: right;" | 256
+
| style="text-align: right;" | 256.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-08-26
 
| 2006-08-26
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1285
+
| style="text-align: right;" | 1285.00
| style="text-align: right;" | 1293
+
| style="text-align: right;" | 1293.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-02-16
 +
| Perforation
 +
| style="text-align: right;" | 1554.80
 +
| style="text-align: right;" | 1556.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1963-02-17
 +
| Acid Wash
 +
| style="text-align: right;" | 1550.50
 +
| style="text-align: right;" | 1556.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-02-17
 +
| Fracture
 +
| style="text-align: right;" | 1550.50
 +
| style="text-align: right;" | 1556.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1969-02-05
 +
| Perforation
 +
| style="text-align: right;" | 1560.60
 +
| style="text-align: right;" | 1566.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1969-02-13
 +
| Acid Treatment
 +
| style="text-align: right;" | 1560.60
 +
| style="text-align: right;" | 1566.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-07-06
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1537.00
 +
| style="text-align: right;" | 1545.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-07-07
 +
| Perforation
 +
| style="text-align: right;" | 1298.40
 +
| style="text-align: right;" | 1303.30
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2003-07-09
 +
| Fracture
 +
| style="text-align: right;" | 1298.40
 +
| style="text-align: right;" | 1303.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 190: Line 311:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 239: Line 374:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 19:19, 19 January 2021

Well Details

Well ID: 0605090207000
Loading map...
Location: 00/07-02-060-09W5/0
Location Alias: 00/07-02-60-09 W5M
Location Alias 2: 00/07-02-060-09 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 09
Section: 02
County/Municipality: Woodlands County
Well Name: IMP LOMBELL NORTH 7-2-60-9
Operator Name: Canadian Natural Resources Limited
License Number: 0023641
License Date: 1963-01-11
License Status: Abandoned
Spud Date: 1963-01-12
Final Drill Date: 1963-02-03
Well Total Depth: 1590.40 m
Surface Hole Latitude: 54.152932
Surface Hole Longitude: -115.232020

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-11 Obtained License
1963-01-13 Lost Circulation Occurred
1963-01-30 Drill Stem Test Performed
1963-02-01 Drill Stem Test Performed
1963-02-03 Finished Drilling
1963-02-04 Drill Stem Test Performed
1963-02-05 Production Casing Operation Performed
1963-02-16 Perforation Treatment Performed - Jet Perforation
1963-02-16 Perforation Treatment Performed - Selective Jet Perforations
1963-02-17 Perforation Treatment Performed - Acid Wash - No Pressure
1963-02-17 Perforation Treatment Performed - Fractured
1963-04-02 Well Mode changed to Drilled and Cased
1969-02-05 Perforation Treatment Performed - Jet Perforation
1969-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-08-11 Well Mode changed to Drilled and Cased
2003-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-06 Plug Back Performed
2003-07-06 Well Log Performed
2003-07-06 Well Mode changed to Abandoned Zone
2003-07-07 Perforation Treatment Performed - Jet Perforation
2003-07-07 Well Log Performed
2003-07-09 Perforation Treatment Performed - Fractured
2006-08-23 Perforation Treatment Performed - Jet Perforation
2006-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-25 Perforation Treatment Performed - Cement Squeeze
2006-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-26 Perforation Treatment Performed - Cement Plug
2006-08-26 Perforation Treatment Performed - Jet Perforation
2006-08-26 Perforation Treatment Performed - Remedial Casing
2006-08-26 Plug Back Performed
2006-08-26 Well Log Performed
2006-08-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-16 Selective Jet Perforations 1550.50 1553.00 0
2006-08-23 Perforation 1550.00 1553.00 7
2006-08-23 Perforation 1554.00 1556.00 7
2006-08-23 Perforation 1560.60 1566.70 7
2006-08-25 Cement Squeeze 1550.00 1556.00 0
2006-08-25 Packing Device Capped w/Cement 1493.00 1547.00 0
2006-08-25 Packing Device Capped w/Cement 1547.00 1558.00 0
2006-08-26 Perforation 253.00 256.00 13
2006-08-26 Remedial Casing Cementing 253.00 256.00 0
2006-08-26 Cement Plug 78.00 256.00 0
2006-08-26 Packing Device Capped w/Cement 1285.00 1293.00 0
1963-02-16 Perforation 1554.80 1556.00 7
1963-02-17 Acid Wash 1550.50 1556.00 0
1963-02-17 Fracture 1550.50 1556.00 0
1969-02-05 Perforation 1560.60 1566.70 7
1969-02-13 Acid Treatment 1560.60 1566.70 0
2003-07-06 Packing Device Capped w/Cement 1537.00 1545.00 0
2003-07-07 Perforation 1298.40 1303.30 20
2003-07-09 Fracture 1298.40 1303.30 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1963-01-13 Lost Circulation 122.80 122.80

For data sources see[5]

References