X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0604222306000"

m
m
 
Line 207: Line 207:
 
| style="text-align: right;" | 805.90
 
| style="text-align: right;" | 805.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 1977-03-03
 
| Acid Treatment
 
| style="text-align: right;" | 804.70
 
| style="text-align: right;" | 805.90
 
| style="text-align: right;" | 0
 
|-
 
| 1979-07-19
 
| Cement Squeeze
 
| style="text-align: right;" | 804.70
 
| style="text-align: right;" | 805.90
 
| style="text-align: right;" | 0
 
|-
 
| 1979-07-20
 
| Cement Squeeze
 
| style="text-align: right;" | 804.70
 
| style="text-align: right;" | 805.90
 
| style="text-align: right;" | 0
 
|-
 
| 1979-07-25
 
| Perforation
 
| style="text-align: right;" | 804.70
 
| style="text-align: right;" | 805.90
 
| style="text-align: right;" | 7
 
|-
 
| 1979-07-26
 
| Acid Treatment
 
| style="text-align: right;" | 804.70
 
| style="text-align: right;" | 805.90
 
| style="text-align: right;" | 0
 
|-
 
| 1979-07-29
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 801.00
 
| style="text-align: right;" | 801.00
 
| style="text-align: right;" | 0
 
|-
 
| 1979-07-29
 
| Perforation
 
| style="text-align: right;" | 789.40
 
| style="text-align: right;" | 790.70
 
| style="text-align: right;" | 7
 
|-
 
| 1979-07-30
 
| Acid Wash
 
| style="text-align: right;" | 789.40
 
| style="text-align: right;" | 790.70
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1979-07-31
 
| 1979-07-31
Line 314: Line 266:
 
| style="text-align: right;" | 767.00
 
| style="text-align: right;" | 767.00
 
| style="text-align: right;" | 775.00
 
| style="text-align: right;" | 775.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-03-03
 +
| Acid Treatment
 +
| style="text-align: right;" | 804.70
 +
| style="text-align: right;" | 805.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-07-19
 +
| Cement Squeeze
 +
| style="text-align: right;" | 804.70
 +
| style="text-align: right;" | 805.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-07-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 804.70
 +
| style="text-align: right;" | 805.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-07-25
 +
| Perforation
 +
| style="text-align: right;" | 804.70
 +
| style="text-align: right;" | 805.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1979-07-26
 +
| Acid Treatment
 +
| style="text-align: right;" | 804.70
 +
| style="text-align: right;" | 805.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-07-29
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 801.00
 +
| style="text-align: right;" | 801.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-07-29
 +
| Perforation
 +
| style="text-align: right;" | 789.40
 +
| style="text-align: right;" | 790.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1979-07-30
 +
| Acid Wash
 +
| style="text-align: right;" | 789.40
 +
| style="text-align: right;" | 790.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 390: Line 390:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:31, 19 January 2021

Well Details

Well ID: 0604222306000
Loading map...
Location: 00/06-23-060-22W4/0
Location Alias: 00/06-23-60-22 W4M
Location Alias 2: 00/06-23-060-22 W4/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 22
Section: 23
County/Municipality: Thorhild County
Well Name: AMOCO THORHILD 6-23-60-22
Operator Name: Bellatrix Exploration Ltd.
License Number: 0062344
License Date: 1977-01-25
License Status: RecCertified
Spud Date: 1977-01-25
Final Drill Date: 1977-01-28
Well Total Depth: 829.10 m
Surface Hole Latitude: 54.200956
Surface Hole Longitude: -113.193855

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-01-25 Obtained License
1977-01-28 Finished Drilling
1977-01-28 Well Log Performed
1977-01-29 Drill Stem Test Performed
1977-01-29 Production Casing Operation Performed
1977-01-30 Drill Stem Test Performed
1977-01-31 Well Mode changed to Drilled and Cased
1977-02-26 Perforation Treatment Performed - Jet Perforation
1977-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-02-22 Well Began Production
1979-02-22 Well Fluid changed to Gas
1979-02-22 Well Mode changed to Flowing
1979-07-19 Perforation Treatment Performed - Cement Squeeze
1979-07-20 Perforation Treatment Performed - Cement Squeeze
1979-07-25 Perforation Treatment Performed - Jet Perforation
1979-07-25 Well Log Performed
1979-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-07-29 Perforation Treatment Performed - Jet Perforation
1979-07-29 Well Fluid changed to Gas
1979-07-29 Well Mode changed to Abandoned Zone
1979-07-30 Perforation Treatment Performed - Acid Wash - No Pressure
1979-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-01 Perforation Treatment Performed - Cement Squeeze
1979-08-03 Perforation Treatment Performed - Jet Perforation
1984-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-12 Perforation Treatment Performed - Jet Perforation
1984-07-17 Well Log Performed
1985-12-09 Perforation Treatment Performed - Fractured
1987-10-06 Perforation Treatment Performed - Cement Squeeze
1987-10-06 Plug Back Performed
1987-10-08 Perforation Treatment Performed - Jet Perforation
1998-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-18 Plug Back Performed
1998-12-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-02-26 Perforation 804.70 805.90 13
1979-07-31 Acid Treatment 789.40 790.70 0
1979-08-01 Cement Squeeze 789.40 790.70 0
1979-08-03 Perforation 783.70 786.40 6
1984-06-12 Packing Device Capped w/Cement 765.00 765.00 0
1984-06-12 Perforation 484.60 486.40 13
1985-12-09 Fracture 484.60 486.40 0
1987-10-06 Cement Squeeze 484.60 486.40 0
1987-10-08 Perforation 783.70 786.40 6
1998-12-18 Packing Device Capped w/Cement 780.00 788.00 0
1998-12-18 Packing Device Capped w/Cement 767.00 775.00 0
1977-03-03 Acid Treatment 804.70 805.90 0
1979-07-19 Cement Squeeze 804.70 805.90 0
1979-07-20 Cement Squeeze 804.70 805.90 0
1979-07-25 Perforation 804.70 805.90 7
1979-07-26 Acid Treatment 804.70 805.90 0
1979-07-29 Packing Device Capped w/Cement 801.00 801.00 0
1979-07-29 Perforation 789.40 790.70 7
1979-07-30 Acid Wash 789.40 790.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1268 0.0 0.0 0.0

For data sources see[5]

References