X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0595152002000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0595152002000
 
| Well ID: 0595152002000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.1104812, -116.2109546 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.111557, -116.211085 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: BLAZE WIND 2-20-59-15
+
| Location: 00/02-20-059-15W5/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/02-20-59-15 W5M
 +
|-
 +
| Location Alias 2: 00/02-20-059-15 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 059
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 15
 +
|-
 +
| Section: 20
 +
|-
 +
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
 +
|-
 +
| Well Name: TIDEWATER WIND 2-20-59-15
 +
|-
 +
| Operator Name: [[Tidewater Midstream and Infrastructure Ltd.]]
 +
|-
 +
| License Number: 0020896
 
|-
 
|-
 
| License Date: 1961-06-09
 
| License Date: 1961-06-09
 
|-
 
|-
| Final Drilling Date: 1961-08-09
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1961-06-18
 +
|-
 +
| Final Drill Date: 1961-08-09
 +
|-
 +
| Well Total Depth: 2778.30 m
 +
|-
 +
| Surface Hole Latitude: 54.111557
 +
|-
 +
| Surface Hole Longitude: -116.211085
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 
|-
 
|-
| Total Depth: 2778.3m
+
| 1961-06-09
 +
| Obtained License
 
|-
 
|-
| Fluid Type: Gas
+
| 1961-07-04
 +
| Drill Stem Test Performed
 
|-
 
|-
| Status: Abandoned Zone
+
| 1961-07-06
 +
| Lost Circulation Occurred
 
|-
 
|-
| Well Type: Not Applicable
+
| 1961-08-09
 +
| Finished Drilling
 
|-
 
|-
| Configuration: Vertical
+
| 1961-08-22
 +
| Production Casing Operation Performed
 
|-
 
|-
| Violations:
+
| 1961-08-25
 +
| Drill Stem Test Performed
 
|-
 
|-
| Latitude: 54.1104812
+
| 1961-08-25
 +
| Perforation Treatment Performed - Bullet Perforation
 
|-
 
|-
| Longitude: -116.2109546
+
| 1961-08-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1961-09-02
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1961-10-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1961-10-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-01-08
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1964-01-31
 +
| Well Began Production
 +
|-
 +
| 1964-01-31
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1964-01-31
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1964-08-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1964-08-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1964-08-27
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-09-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1965-03-04
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1965-03-04
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1965-03-04
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1965-03-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1965-03-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1965-09-08
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1965-09-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1965-09-09
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1965-09-10
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1965-09-10
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1965-09-11
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1965-09-17
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1965-09-17
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1965-09-21
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1965-09-30
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1974-09-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1974-10-22
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1974-10-22
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1974-10-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1974-10-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1974-10-29
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1974-10-29
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1974-11-01
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1978-07-19
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1978-07-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1978-07-24
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1978-07-25
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1978-07-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1978-07-27
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1978-07-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1978-07-29
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1978-08-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1978-08-02
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1996-11-06
 +
| Well Log Performed
 +
|-
 +
| 1996-11-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1996-11-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-11-28
 +
| Plug Back Performed
 +
|-
 +
| 1996-11-30
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1996-11-30
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1961-08-25
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2228.10
 +
| style="text-align: right;" | 2231.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1965-03-04
 +
| Cement Plug
 +
| style="text-align: right;" | 2732.50
 +
| style="text-align: right;" | 2757.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-03-11
 +
| Perforation
 +
| style="text-align: right;" | 2228.40
 +
| style="text-align: right;" | 2232.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1965-03-17
 +
| Acid Treatment
 +
| style="text-align: right;" | 2228.40
 +
| style="text-align: right;" | 2232.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-09-08
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2545.10
 +
| style="text-align: right;" | 2545.40
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1965-09-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2529.80
 +
| style="text-align: right;" | 2529.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-09-09
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2347.00
 +
| style="text-align: right;" | 2347.30
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1965-09-09
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2343.90
 +
| style="text-align: right;" | 2344.20
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1965-09-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2343.90
 +
| style="text-align: right;" | 2344.20
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1965-09-10
 +
| Acid Wash
 +
| style="text-align: right;" | 2343.90
 +
| style="text-align: right;" | 2347.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-09-11
 +
| Cement Plug
 +
| style="text-align: right;" | 2309.50
 +
| style="text-align: right;" | 2355.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-08-27
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2228.10
 +
| style="text-align: right;" | 2231.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-09-17
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2228.40
 +
| style="text-align: right;" | 2232.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-09-17
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2228.40
 +
| style="text-align: right;" | 2232.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-09-21
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2228.10
 +
| style="text-align: right;" | 2229.30
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1965-09-30
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2228.10
 +
| style="text-align: right;" | 2229.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-09-21
 +
| Perforation
 +
| style="text-align: right;" | 1734.30
 +
| style="text-align: right;" | 1737.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1974-09-21
 +
| Perforation
 +
| style="text-align: right;" | 1740.40
 +
| style="text-align: right;" | 1744.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1974-10-22
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1734.30
 +
| style="text-align: right;" | 1744.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-10-22
 +
| Cement Plug
 +
| style="text-align: right;" | 1738.90
 +
| style="text-align: right;" | 1744.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-10-25
 +
| Perforation
 +
| style="text-align: right;" | 1734.90
 +
| style="text-align: right;" | 1736.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1974-10-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 1734.90
 +
| style="text-align: right;" | 1736.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-09-02
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2756.60
 +
| style="text-align: right;" | 2757.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1974-10-29
 +
| Acid Treatment
 +
| style="text-align: right;" | 1734.90
 +
| style="text-align: right;" | 1736.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-10-29
 +
| Fracture
 +
| style="text-align: right;" | 1734.90
 +
| style="text-align: right;" | 1736.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-11-01
 +
| Acid Treatment
 +
| style="text-align: right;" | 1734.90
 +
| style="text-align: right;" | 1736.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1978-07-19
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1734.90
 +
| style="text-align: right;" | 1736.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1978-07-22
 +
| Perforation
 +
| style="text-align: right;" | 2147.30
 +
| style="text-align: right;" | 2148.80
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1978-07-24
 +
| Acid Wash
 +
| style="text-align: right;" | 2147.30
 +
| style="text-align: right;" | 2148.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1978-07-25
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2147.30
 +
| style="text-align: right;" | 2148.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1978-07-26
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2146.60
 +
| style="text-align: right;" | 2194.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1978-07-27
 +
| Perforation
 +
| style="text-align: right;" | 2141.50
 +
| style="text-align: right;" | 2143.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1978-07-27
 +
| Acid Wash
 +
| style="text-align: right;" | 2141.50
 +
| style="text-align: right;" | 2143.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-10-04
 +
| Perforation
 +
| style="text-align: right;" | 2747.80
 +
| style="text-align: right;" | 2757.20
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1978-07-29
 +
| Cement Plug
 +
| style="text-align: right;" | 2140.30
 +
| style="text-align: right;" | 2146.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1978-08-01
 +
| Perforation
 +
| style="text-align: right;" | 2132.40
 +
| style="text-align: right;" | 2133.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1978-08-01
 +
| Perforation
 +
| style="text-align: right;" | 2135.70
 +
| style="text-align: right;" | 2136.30
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1978-08-02
 +
| Acid Wash
 +
| style="text-align: right;" | 2132.40
 +
| style="text-align: right;" | 2136.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-11-28
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2112.20
 +
| style="text-align: right;" | 2120.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-11-28
 +
| Perforation
 +
| style="text-align: right;" | 615.00
 +
| style="text-align: right;" | 615.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-11-30
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 615.00
 +
| style="text-align: right;" | 615.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-11-30
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 615.00
 +
| style="text-align: right;" | 615.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-10-11
 +
| Acid Treatment
 +
| style="text-align: right;" | 2747.80
 +
| style="text-align: right;" | 2757.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-08-11
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2747.80
 +
| style="text-align: right;" | 2757.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-08-24
 +
| Perforation
 +
| style="text-align: right;" | 2749.30
 +
| style="text-align: right;" | 2753.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-08-27
 +
| Acid Treatment
 +
| style="text-align: right;" | 2749.30
 +
| style="text-align: right;" | 2753.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-09-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 2749.30
 +
| style="text-align: right;" | 2753.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 1961-07-06
 +
| Lost Circulation
 +
| style="text-align: right;" | 2151.60
 +
| style="text-align: right;" | 2151.60
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 14:54, 19 January 2021

Well Details

Well ID: 0595152002000
Loading map...
Location: 00/02-20-059-15W5/0
Location Alias: 00/02-20-59-15 W5M
Location Alias 2: 00/02-20-059-15 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 15
Section: 20
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 2-20-59-15
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0020896
License Date: 1961-06-09
License Status: Abandoned
Spud Date: 1961-06-18
Final Drill Date: 1961-08-09
Well Total Depth: 2778.30 m
Surface Hole Latitude: 54.111557
Surface Hole Longitude: -116.211085

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-09 Obtained License
1961-07-04 Drill Stem Test Performed
1961-07-06 Lost Circulation Occurred
1961-08-09 Finished Drilling
1961-08-22 Production Casing Operation Performed
1961-08-25 Drill Stem Test Performed
1961-08-25 Perforation Treatment Performed - Bullet Perforation
1961-08-27 Perforation Treatment Performed - Cement Squeeze
1961-09-02 Perforation Treatment Performed - Bullet Perforation
1961-10-04 Perforation Treatment Performed - Jet Perforation
1961-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-08 Well Mode changed to Drilled and Cased
1964-01-31 Well Began Production
1964-01-31 Well Fluid changed to Gas
1964-01-31 Well Mode changed to Flowing
1964-08-11 Perforation Treatment Performed - Cement Squeeze
1964-08-24 Perforation Treatment Performed - Jet Perforation
1964-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-04 Perforation Treatment Performed - Cement Plug
1965-03-04 Well Fluid changed to Gas
1965-03-04 Well Mode changed to Abandoned Zone
1965-03-11 Perforation Treatment Performed - Jet Perforation
1965-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-08 Perforation Treatment Performed - Bullet Perforation
1965-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-09-09 Perforation Treatment Performed - Bullet Perforation
1965-09-10 Perforation Treatment Performed - Acid Wash - No Pressure
1965-09-10 Perforation Treatment Performed - Bullet Perforation
1965-09-11 Perforation Treatment Performed - Cement Plug
1965-09-17 Perforation Treatment Performed - Bullet Perforation
1965-09-17 Perforation Treatment Performed - Cement Squeeze
1965-09-21 Perforation Treatment Performed - Bullet Perforation
1965-09-30 Perforation Treatment Performed - Cement Squeeze
1974-09-21 Perforation Treatment Performed - Jet Perforation
1974-10-22 Perforation Treatment Performed - Cement Plug
1974-10-22 Perforation Treatment Performed - Cement Squeeze
1974-10-25 Perforation Treatment Performed - Jet Perforation
1974-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-29 Perforation Treatment Performed - Fractured
1974-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-19 Perforation Treatment Performed - Cement Squeeze
1978-07-22 Perforation Treatment Performed - Jet Perforation
1978-07-24 Perforation Treatment Performed - Acid Wash - No Pressure
1978-07-25 Perforation Treatment Performed - Cement Squeeze
1978-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-07-27 Perforation Treatment Performed - Acid Wash - No Pressure
1978-07-27 Perforation Treatment Performed - Jet Perforation
1978-07-29 Perforation Treatment Performed - Cement Plug
1978-08-01 Perforation Treatment Performed - Jet Perforation
1978-08-02 Perforation Treatment Performed - Acid Wash - No Pressure
1996-11-06 Well Log Performed
1996-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-28 Perforation Treatment Performed - Jet Perforation
1996-11-28 Plug Back Performed
1996-11-30 Perforation Treatment Performed - Remedial Casing
1996-11-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-25 Bullet Perforation 2228.10 2231.10 7
1965-03-04 Cement Plug 2732.50 2757.20 0
1965-03-11 Perforation 2228.40 2232.10 7
1965-03-17 Acid Treatment 2228.40 2232.10 0
1965-09-08 Bullet Perforation 2545.10 2545.40 16
1965-09-09 Packing Device Capped w/Cement 2529.80 2529.80 0
1965-09-09 Bullet Perforation 2347.00 2347.30 16
1965-09-09 Bullet Perforation 2343.90 2344.20 16
1965-09-10 Bullet Perforation 2343.90 2344.20 16
1965-09-10 Acid Wash 2343.90 2347.30 0
1965-09-11 Cement Plug 2309.50 2355.20 0
1961-08-27 Cement Squeeze 2228.10 2231.10 0
1965-09-17 Bullet Perforation 2228.40 2232.10 0
1965-09-17 Cement Squeeze 2228.40 2232.10 0
1965-09-21 Bullet Perforation 2228.10 2229.30 7
1965-09-30 Cement Squeeze 2228.10 2229.30 0
1974-09-21 Perforation 1734.30 1737.40 7
1974-09-21 Perforation 1740.40 1744.10 7
1974-10-22 Cement Squeeze 1734.30 1744.10 0
1974-10-22 Cement Plug 1738.90 1744.10 0
1974-10-25 Perforation 1734.90 1736.40 7
1974-10-28 Acid Treatment 1734.90 1736.40 0
1961-09-02 Bullet Perforation 2756.60 2757.20 13
1974-10-29 Acid Treatment 1734.90 1736.40 0
1974-10-29 Fracture 1734.90 1736.40 0
1974-11-01 Acid Treatment 1734.90 1736.40 0
1978-07-19 Cement Squeeze 1734.90 1736.40 0
1978-07-22 Perforation 2147.30 2148.80 3
1978-07-24 Acid Wash 2147.30 2148.80 0
1978-07-25 Cement Squeeze 2147.30 2148.80 0
1978-07-26 Packing Device Capped w/Cement 2146.60 2194.60 0
1978-07-27 Perforation 2141.50 2143.40 7
1978-07-27 Acid Wash 2141.50 2143.40 0
1961-10-04 Perforation 2747.80 2757.20 7
1978-07-29 Cement Plug 2140.30 2146.60 0
1978-08-01 Perforation 2132.40 2133.60 7
1978-08-01 Perforation 2135.70 2136.30 7
1978-08-02 Acid Wash 2132.40 2136.30 0
1996-11-28 Packing Device Capped w/Cement 2112.20 2120.20 0
1996-11-28 Perforation 615.00 615.50 13
1996-11-30 Remedial Casing Cementing 615.00 615.50 0
1996-11-30 Remedial Casing Cementing 615.00 615.50 0
1961-10-11 Acid Treatment 2747.80 2757.20 0
1964-08-11 Cement Squeeze 2747.80 2757.20 0
1964-08-24 Perforation 2749.30 2753.00 0
1964-08-27 Acid Treatment 2749.30 2753.00 0
1964-09-14 Acid Treatment 2749.30 2753.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-07-06 Lost Circulation 2151.60 2151.60

For data sources see[6]

References