X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "1156052912004"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 1156052912004
 
| Well ID: 1156052912004
| style="height=100%; align=center" rowspan="14" | {{#display_map: 59.016182, -118.819584 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 59.016182, -118.819584 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/12-29-115-05W6/4
 
| Location: 00/12-29-115-05W6/4
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/12-29-115-05 W6/04
 
| Location Alias 2: 00/12-29-115-05 W6/04
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 115
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 05
 +
|-
 +
| Section: 29
 
|-
 
|-
 
| County/Municipality: [[Mackenzie County,_Alberta|Mackenzie County]]
 
| County/Municipality: [[Mackenzie County,_Alberta|Mackenzie County]]
Line 17: Line 27:
 
| Well Name: ACL VIRGO 12-29-115-5
 
| Well Name: ACL VIRGO 12-29-115-5
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Paramount Resources Ltd.]]
 
|-
 
|-
 
| License Number: 0041997
 
| License Number: 0041997
Line 29: Line 39:
 
| Final Drill Date: 1972-02-17
 
| Final Drill Date: 1972-02-17
 
|-
 
|-
| Well Total Depth: 1539.2 m
+
| Well Total Depth: 1539.20 m
 
|-
 
|-
 
| Surface Hole Latitude: 59.016182
 
| Surface Hole Latitude: 59.016182
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1972-01-27
 +
| Obtained License
 +
|-
 +
| 1972-02-13
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1972-02-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1972-02-17
 +
| Finished Drilling
 +
|-
 +
| 1972-02-17
 +
| Lost Circulation Occurred
 +
|-
 +
| 1972-02-17
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1972-02-17
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1972-02-27
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1974-07-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1975-10-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1977-08-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1977-08-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-07-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1982-07-19
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1982-07-24
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1982-09-13
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1982-09-13
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1982-09-20
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1982-09-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-08-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-08-12
 +
| Well Log Performed
 +
|-
 +
| 1984-08-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-08-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1994-02-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1994-02-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-02-27
 +
| Plug Back Performed
 +
|-
 +
| 1994-02-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1998-06-20
 +
| Well Log Performed
 +
|-
 +
| 1998-06-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1998-06-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-06-21
 +
| Plug Back Performed
 +
|-
 +
| 1998-06-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1998-06-22
 +
| Well Log Performed
 +
|-
 +
| 1998-06-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-06-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1998-07-03
 +
| Well Log Performed
 +
|-
 +
| 1998-07-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-07-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2005-03-28
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2005-03-28
 +
| Plug Back Performed
 +
|-
 +
| 2005-03-28
 +
| Well Log Performed
 +
|-
 +
| 2005-03-30
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2005-03-30
 +
| Plug Back Performed
 +
|-
 +
| 2005-04-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-04-08
 +
| Well Log Performed
 +
|-
 +
| 2005-04-13
 +
| Well Log Performed
 +
|-
 +
| 2005-04-14
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2005-04-15
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2005-04-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-04-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-04-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2008-04-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-04-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2008-04-08
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2008-04-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-04-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-04-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 270:
 
| 1972-02-17
 
| 1972-02-17
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 1452.7
+
| style="text-align: right;" | 1452.70
| style="text-align: right;" | 1539.2
+
| style="text-align: right;" | 1539.20
| style="text-align: right;" | 0
 
|-
 
| 1972-02-27
 
| Acid Treatment
 
| style="text-align: right;" | 1452.7
 
| style="text-align: right;" | 1477.4
 
| style="text-align: right;" | 0
 
|-
 
| 1974-07-03
 
| Acid Treatment
 
| style="text-align: right;" | 1452.7
 
| style="text-align: right;" | 1472.5
 
| style="text-align: right;" | 0
 
|-
 
| 1975-10-28
 
| Acid Treatment
 
| style="text-align: right;" | 1452.7
 
| style="text-align: right;" | 1472.5
 
| style="text-align: right;" | 0
 
|-
 
| 1977-08-26
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1432.6
 
| style="text-align: right;" | 1432.6
 
| style="text-align: right;" | 0
 
|-
 
| 1977-08-31
 
| Perforation
 
| style="text-align: right;" | 1357.6
 
| style="text-align: right;" | 1360.6
 
| style="text-align: right;" | 7
 
|-
 
| 1977-08-31
 
| Perforation
 
| style="text-align: right;" | 1361.2
 
| style="text-align: right;" | 1363.1
 
| style="text-align: right;" | 7
 
|-
 
| 1982-07-19
 
| Acid Treatment
 
| style="text-align: right;" | 1357.6
 
| style="text-align: right;" | 1363.1
 
| style="text-align: right;" | 0
 
|-
 
| 1982-07-19
 
| Cement Squeeze
 
| style="text-align: right;" | 1357.6
 
| style="text-align: right;" | 1363.1
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-07-24
 
| 1982-07-24
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 1452.7
+
| style="text-align: right;" | 1452.70
| style="text-align: right;" | 1539.2
+
| style="text-align: right;" | 1539.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-09-13
 
| 1982-09-13
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1452.7
+
| style="text-align: right;" | 1452.70
| style="text-align: right;" | 1533.2
+
| style="text-align: right;" | 1533.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-09-13
 
| 1982-09-13
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1536
+
| style="text-align: right;" | 1536.00
| style="text-align: right;" | 1539
+
| style="text-align: right;" | 1539.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-09-20
 
| 1982-09-20
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 1533
+
| style="text-align: right;" | 1533.00
| style="text-align: right;" | 1536
+
| style="text-align: right;" | 1536.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-09-21
 
| 1982-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
| style="text-align: right;" | 1477
+
| style="text-align: right;" | 1477.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1982-09-21
 
| 1982-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1483
+
| style="text-align: right;" | 1483.00
| style="text-align: right;" | 1485
+
| style="text-align: right;" | 1485.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1984-08-11
 
| 1984-08-11
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
| style="text-align: right;" | 1477
+
| style="text-align: right;" | 1477.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-08-13
 
| 1984-08-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
| style="text-align: right;" | 1477
+
| style="text-align: right;" | 1477.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1984-08-14
 
| 1984-08-14
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
| style="text-align: right;" | 1477
+
| style="text-align: right;" | 1477.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-02-27
 
| 1994-02-27
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
| style="text-align: right;" | 1485
+
| style="text-align: right;" | 1485.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1972-02-27
 +
| Acid Treatment
 +
| style="text-align: right;" | 1452.70
 +
| style="text-align: right;" | 1477.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-02-27
 
| 1994-02-27
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1465
+
| style="text-align: right;" | 1465.00
| style="text-align: right;" | 1467
+
| style="text-align: right;" | 1467.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-02-28
 
| 1994-02-28
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1465
+
| style="text-align: right;" | 1465.00
| style="text-align: right;" | 1467
+
| style="text-align: right;" | 1467.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-06-21
 
| 1998-06-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1447
+
| style="text-align: right;" | 1447.00
| style="text-align: right;" | 1455
+
| style="text-align: right;" | 1455.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-06-21
 
| 1998-06-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1344.7
+
| style="text-align: right;" | 1344.70
| style="text-align: right;" | 1352
+
| style="text-align: right;" | 1352.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1998-06-22
 
| 1998-06-22
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1344.7
+
| style="text-align: right;" | 1344.70
| style="text-align: right;" | 1352
+
| style="text-align: right;" | 1352.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-06-23
 
| 1998-06-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1269.4
+
| style="text-align: right;" | 1269.40
| style="text-align: right;" | 1273.8
+
| style="text-align: right;" | 1273.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1998-06-24
 
| 1998-06-24
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1269.4
+
| style="text-align: right;" | 1269.40
| style="text-align: right;" | 1273.8
+
| style="text-align: right;" | 1273.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998-07-04
 
| 1998-07-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1281
+
| style="text-align: right;" | 1281.00
| style="text-align: right;" | 1282.5
+
| style="text-align: right;" | 1282.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1998-07-04
 
| 1998-07-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1283.5
+
| style="text-align: right;" | 1283.50
| style="text-align: right;" | 1285
+
| style="text-align: right;" | 1285.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1998-07-13
 
| 1998-07-13
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1281
+
| style="text-align: right;" | 1281.00
| style="text-align: right;" | 1285
+
| style="text-align: right;" | 1285.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-07-03
 +
| Acid Treatment
 +
| style="text-align: right;" | 1452.70
 +
| style="text-align: right;" | 1472.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-03-28
 
| 2005-03-28
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1269.4
+
| style="text-align: right;" | 1269.40
| style="text-align: right;" | 1285
+
| style="text-align: right;" | 1285.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-03-30
 
| 2005-03-30
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1344.7
+
| style="text-align: right;" | 1344.70
| style="text-align: right;" | 1352
+
| style="text-align: right;" | 1352.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-04-04
 
| 2005-04-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1465
+
| style="text-align: right;" | 1465.00
| style="text-align: right;" | 1467
+
| style="text-align: right;" | 1467.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2005-04-14
 
| 2005-04-14
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 1533.2
+
| style="text-align: right;" | 1533.20
| style="text-align: right;" | 1539.2
+
| style="text-align: right;" | 1539.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-04-15
 
| 2005-04-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1465
+
| style="text-align: right;" | 1465.00
| style="text-align: right;" | 1467
+
| style="text-align: right;" | 1467.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2005-04-15
 
| 2005-04-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1469.4
+
| style="text-align: right;" | 1469.40
| style="text-align: right;" | 1471.9
+
| style="text-align: right;" | 1471.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2005-04-15
 
| 2005-04-15
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1465
+
| style="text-align: right;" | 1465.00
| style="text-align: right;" | 1471.9
+
| style="text-align: right;" | 1471.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-04-21
 
| 2005-04-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1474
+
| style="text-align: right;" | 1474.00
| style="text-align: right;" | 1477
+
| style="text-align: right;" | 1477.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2005-04-23
 
| 2005-04-23
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1465
+
| style="text-align: right;" | 1465.00
| style="text-align: right;" | 1477
+
| style="text-align: right;" | 1477.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-04-06
 
| 2008-04-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1508
+
| style="text-align: right;" | 1508.00
| style="text-align: right;" | 1511.3
+
| style="text-align: right;" | 1511.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1975-10-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 1452.70
 +
| style="text-align: right;" | 1472.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-04-07
 
| 2008-04-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1508
+
| style="text-align: right;" | 1508.00
| style="text-align: right;" | 1511.3
+
| style="text-align: right;" | 1511.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-04-08
 
| 2008-04-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1503.3
+
| style="text-align: right;" | 1503.30
| style="text-align: right;" | 1506.5
+
| style="text-align: right;" | 1506.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2008-04-08
 
| 2008-04-08
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1503.3
+
| style="text-align: right;" | 1503.30
| style="text-align: right;" | 1506.5
+
| style="text-align: right;" | 1506.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-04-09
 
| 2008-04-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1498.3
+
| style="text-align: right;" | 1498.30
| style="text-align: right;" | 1502.1
+
| style="text-align: right;" | 1502.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2008-04-10
 
| 2008-04-10
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1498.3
+
| style="text-align: right;" | 1498.30
| style="text-align: right;" | 1502.1
+
| style="text-align: right;" | 1502.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-26
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1432.60
 +
| style="text-align: right;" | 1432.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-08-31
 +
| Perforation
 +
| style="text-align: right;" | 1357.60
 +
| style="text-align: right;" | 1360.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1977-08-31
 +
| Perforation
 +
| style="text-align: right;" | 1361.20
 +
| style="text-align: right;" | 1363.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1982-07-19
 +
| Acid Treatment
 +
| style="text-align: right;" | 1357.60
 +
| style="text-align: right;" | 1363.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1982-07-19
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1357.60
 +
| style="text-align: right;" | 1363.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 340: Line 536:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 389: Line 599:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 13:20, 19 January 2021

Well Details

Well ID: 1156052912004
Loading map...
Location: 00/12-29-115-05W6/4
Location Alias: 00/12-29-15-05 W6M
Location Alias 2: 00/12-29-115-05 W6/04
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 29
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 12-29-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0041997
License Date: 1972-01-27
License Status: Suspension
Spud Date: 1972-02-01
Final Drill Date: 1972-02-17
Well Total Depth: 1539.20 m
Surface Hole Latitude: 59.016182
Surface Hole Longitude: -118.819584

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-01-27 Obtained License
1972-02-13 Liner Casing Operation Performed
1972-02-16 Drill Stem Test Performed
1972-02-17 Finished Drilling
1972-02-17 Lost Circulation Occurred
1972-02-17 Perforation Treatment Performed - Open-Hole Completion
1972-02-17 Well Mode changed to Drilled and Cased
1972-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-08-31 Perforation Treatment Performed - Jet Perforation
1982-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-19 Perforation Treatment Performed - Cement Squeeze
1982-07-24 Perforation Treatment Performed - Open-Hole Completion
1982-09-13 Perforation Treatment Performed - Cement Plug
1982-09-13 Perforation Treatment Performed - Cement Squeeze
1982-09-20 Perforation Treatment Performed - Open-Hole Completion
1982-09-21 Perforation Treatment Performed - Jet Perforation
1984-08-11 Perforation Treatment Performed - Cement Squeeze
1984-08-12 Well Log Performed
1984-08-13 Perforation Treatment Performed - Jet Perforation
1984-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-27 Perforation Treatment Performed - Cement Squeeze
1994-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-27 Plug Back Performed
1994-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-20 Well Log Performed
1998-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-21 Perforation Treatment Performed - Jet Perforation
1998-06-21 Plug Back Performed
1998-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-22 Well Log Performed
1998-06-23 Perforation Treatment Performed - Jet Perforation
1998-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-03 Well Log Performed
1998-07-04 Perforation Treatment Performed - Jet Perforation
1998-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-03-28 Perforation Treatment Performed - Cement Squeeze
2005-03-28 Plug Back Performed
2005-03-28 Well Log Performed
2005-03-30 Perforation Treatment Performed - Cement Squeeze
2005-03-30 Plug Back Performed
2005-04-04 Perforation Treatment Performed - Jet Perforation
2005-04-08 Well Log Performed
2005-04-13 Well Log Performed
2005-04-14 Perforation Treatment Performed - Open-Hole Completion
2005-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-04-15 Perforation Treatment Performed - Jet Perforation
2005-04-21 Perforation Treatment Performed - Jet Perforation
2005-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-06 Perforation Treatment Performed - Jet Perforation
2008-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-08 Perforation Treatment Performed - Jet Perforation
2008-04-09 Perforation Treatment Performed - Jet Perforation
2008-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-02-17 Open Hole/Barefoot Completion 1452.70 1539.20 0
1982-07-24 Open Hole/Barefoot Completion 1452.70 1539.20 0
1982-09-13 Cement Squeeze 1452.70 1533.20 0
1982-09-13 Cement Plug 1536.00 1539.00 0
1982-09-20 Open Hole/Barefoot Completion 1533.00 1536.00 0
1982-09-21 Perforation 1474.00 1477.00 7
1982-09-21 Perforation 1483.00 1485.00 7
1984-08-11 Cement Squeeze 1474.00 1477.00 0
1984-08-13 Perforation 1474.00 1477.00 3
1984-08-14 Acid Treatment 1474.00 1477.00 0
1994-02-27 Cement Squeeze 1474.00 1485.00 0
1972-02-27 Acid Treatment 1452.70 1477.40 0
1994-02-27 Perforation 1465.00 1467.00 13
1994-02-28 Acid Treatment 1465.00 1467.00 0
1998-06-21 Packing Device Capped w/Cement 1447.00 1455.00 0
1998-06-21 Perforation 1344.70 1352.00 13
1998-06-22 Acid Treatment 1344.70 1352.00 0
1998-06-23 Perforation 1269.40 1273.80 13
1998-06-24 Acid Treatment 1269.40 1273.80 0
1998-07-04 Perforation 1281.00 1282.50 13
1998-07-04 Perforation 1283.50 1285.00 13
1998-07-13 Acid Treatment 1281.00 1285.00 0
1974-07-03 Acid Treatment 1452.70 1472.50 0
2005-03-28 Cement Squeeze 1269.40 1285.00 0
2005-03-30 Cement Squeeze 1344.70 1352.00 0
2005-04-04 Perforation 1465.00 1467.00 13
2005-04-14 Open Hole/Barefoot Completion 1533.20 1539.20 0
2005-04-15 Perforation 1465.00 1467.00 13
2005-04-15 Perforation 1469.40 1471.90 13
2005-04-15 Acid Treatment 1465.00 1471.90 0
2005-04-21 Perforation 1474.00 1477.00 13
2005-04-23 Acid Treatment 1465.00 1477.00 0
2008-04-06 Perforation 1508.00 1511.30 13
1975-10-28 Acid Treatment 1452.70 1472.50 0
2008-04-07 Acid Treatment 1508.00 1511.30 0
2008-04-08 Perforation 1503.30 1506.50 13
2008-04-08 Acid Treatment 1503.30 1506.50 0
2008-04-09 Perforation 1498.30 1502.10 13
2008-04-10 Acid Treatment 1498.30 1502.10 0
1977-08-26 Packing Device Capped w/Cement 1432.60 1432.60 0
1977-08-31 Perforation 1357.60 1360.60 7
1977-08-31 Perforation 1361.20 1363.10 7
1982-07-19 Acid Treatment 1357.60 1363.10 0
1982-07-19 Cement Squeeze 1357.60 1363.10 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1972-02-17 Lost Circulation 1508.70 1508.70

For data sources see[5]

References