If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 177: | Line 177: | ||
| style="text-align: right;" | 842.80 | | style="text-align: right;" | 842.80 | ||
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1993-11-23 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 525.00 | ||
+ | | style="text-align: right;" | 526.10 | ||
+ | | style="text-align: right;" | 26 | ||
+ | |- | ||
+ | | 1993-11-23 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 526.10 | ||
+ | | style="text-align: right;" | 526.40 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1994-02-28 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 512.00 | ||
+ | | style="text-align: right;" | 520.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1976-06-07 | | 1976-06-07 | ||
Line 224: | Line 242: | ||
| style="text-align: right;" | 525.50 | | style="text-align: right;" | 525.50 | ||
| style="text-align: right;" | 527.80 | | style="text-align: right;" | 527.80 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 318: | Line 318: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0594231111004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.088944,"lon":-113.341351,"icon":""}]} |
Location: 00/11-11-059-23W4/4 | |
Location Alias: 00/11-11-59-23 W4M | |
Location Alias 2: 00/11-11-059-23 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 4 | |
Range: 23 | |
Section: 11 | |
County/Municipality: Thorhild County | |
Well Name: CONOCO REDWATER 11-11-59-23 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0055258 | |
License Date: 1975-10-07 | |
License Status: Abandoned | |
Spud Date: 1975-10-23 | |
Final Drill Date: 1975-10-28 | |
Well Total Depth: 885.40 m | |
Surface Hole Latitude: 54.088944 | |
Surface Hole Longitude: -113.341351 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-10-07 | Obtained License |
1975-10-27 | Drill Stem Test Performed |
1975-10-28 | Finished Drilling |
1975-10-28 | Well Mode changed to Drilled and Cased |
1975-10-30 | Drill Stem Test Performed |
1975-10-31 | Drill Stem Test Performed |
1975-11-01 | Production Casing Operation Performed |
1976-06-04 | Perforation Treatment Performed - Jet Perforation |
1976-06-07 | Perforation Treatment Performed - Jet Perforation |
1976-06-14 | Perforation Treatment Performed - Jet Perforation |
1993-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-10-12 | Plug Back Performed |
1993-10-13 | Perforation Treatment Performed - Jet Perforation |
1993-10-14 | Well Began Production |
1993-10-14 | Well Fluid changed to Gas |
1993-10-14 | Well Mode changed to Flowing |
1993-11-19 | Perforation Treatment Performed - Jet Perforation |
1993-11-20 | Perforation Treatment Performed - Cement Squeeze |
1993-11-23 | Perforation Treatment Performed - Jet Perforation |
1993-11-30 | Well Fluid changed to Gas |
1993-11-30 | Well Mode changed to Suspended |
1994-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-02-28 | Well Abandoned |
1994-02-28 | Well Fluid changed to Gas |
1994-02-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-06-04 | Perforation | 841.20 | 842.80 | 13 |
1993-11-23 | Perforation | 525.00 | 526.10 | 26 |
1993-11-23 | Perforation | 526.10 | 526.40 | 13 |
1994-02-28 | Packing Device Capped w/Cement | 512.00 | 520.00 | 0 |
1976-06-07 | Perforation | 833.90 | 835.50 | 13 |
1976-06-14 | Perforation | 803.80 | 806.50 | 13 |
1993-10-12 | Packing Device Capped w/Cement | 830.00 | 838.00 | 0 |
1993-10-12 | Packing Device Capped w/Cement | 819.00 | 827.00 | 0 |
1993-10-12 | Packing Device Capped w/Cement | 790.00 | 798.00 | 0 |
1993-10-13 | Perforation | 525.50 | 526.10 | 13 |
1993-11-19 | Perforation | 527.30 | 527.80 | 13 |
1993-11-20 | Cement Squeeze | 525.50 | 527.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]