If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 285: | Line 285: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0164031516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.352441,"lon":-110.326775,"icon":""}]} |
Location: 00/16-15-016-03W4/0 | |
Location Alias: 00/16-15-16-03 W4M | |
Location Alias 2: 00/16-15-016-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 016 | |
Meridian: 4 | |
Range: 03 | |
Section: 15 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 16-15-16-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0317239 | |
License Date: 2004-10-21 | |
License Status: Suspension | |
Spud Date: 2004-12-04 | |
Final Drill Date: 2004-12-04 | |
Well Total Depth: 735.00 m | |
Surface Hole Latitude: 50.352441 | |
Surface Hole Longitude: -110.326775 |
Date | Event |
---|---|
2004-10-21 | Obtained License |
2004-12-04 | Finished Drilling |
2004-12-04 | Surface Casing Operation Performed |
2004-12-04 | Well Mode changed to Drilled and Cased |
2004-12-05 | Production Casing Operation Performed |
2004-12-05 | Rig Released |
2005-02-22 | Well Log Performed |
2005-11-23 | Well Log Performed |
2005-11-24 | Perforation Treatment Performed - Jet Perforation |
2005-12-14 | Perforation Treatment Performed - Fractured |
2005-12-20 | Well Began Production |
2005-12-20 | Well Fluid changed to Gas |
2005-12-20 | Well Mode changed to Flowing |
2011-12-01 | Well Fluid changed to Gas |
2011-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-11-24 | Perforation | 455.00 | 457.00 | 7 |
2005-11-24 | Perforation | 469.50 | 473.50 | 7 |
2005-11-24 | Perforation | 483.00 | 486.00 | 7 |
2005-11-24 | Perforation | 497.00 | 500.00 | 7 |
2005-11-24 | Perforation | 606.50 | 607.50 | 7 |
2005-11-24 | Perforation | 608.50 | 610.50 | 7 |
2005-11-24 | Perforation | 642.50 | 644.50 | 7 |
2005-11-24 | Perforation | 658.00 | 660.00 | 7 |
2005-12-14 | Fracture | 455.00 | 660.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 600 | 0.0 | 0.0 | 0.0 |
2006 | 6023 | 0.0 | 0.0 | 0.0 |
2007 | 2080 | 0.0 | 0.0 | 0.0 |
2009 | 2079 | 0.0 | 0.0 | 0.0 |
For data sources see[5]