X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0154121005000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0154121005000
 
| Well ID: 0154121005000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.24186800000001085, -111.58422500000000355 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.241868, -111.584225 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/05-10-015-12W4/0
 
| Location: 00/05-10-015-12W4/0
 +
|-
 +
| Location Alias: 00/05-10-15-12 W4M
 +
|-
 +
| Location Alias 2: 00/05-10-015-12 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 015
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 12
 +
|-
 +
| Section: 10
 +
|-
 +
| County/Municipality: [[County of Newell,_Alberta|County of Newell]]
 
|-
 
|-
 
| Well Name: Imaginea ALDSON 5-10-15-12
 
| Well Name: Imaginea ALDSON 5-10-15-12
 +
|-
 +
| Operator Name: [[Cor4 Oil Corp.]]
 +
|-
 +
| License Number: 0432034
 
|-
 
|-
 
| License Date: 2011-03-03
 
| License Date: 2011-03-03
 
|-
 
|-
| Final Drilling Date: 2011-07-31
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 2011-07-28
 +
|-
 +
| Final Drill Date: 2011-07-31
 +
|-
 +
| Well Total Depth: 1027.00 m
 +
|-
 +
| Surface Hole Latitude: 50.241868
 +
|-
 +
| Surface Hole Longitude: -111.584225
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-03-03
 +
| Obtained License
 +
|-
 +
| 2011-07-29
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2011-07-31
 +
| Finished Drilling
 +
|-
 +
| 2011-07-31
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2011-08-01
 +
| Production Casing Operation Performed
 +
|-
 +
| 2011-08-01
 +
| Rig Released
 +
|-
 +
| 2011-08-01
 +
| Well Log Performed
 +
|-
 +
| 2011-08-09
 +
| Well Log Performed
 +
|-
 +
| 2011-08-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-08-10
 +
| Well Log Performed
 +
|-
 +
| 2011-08-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2011-10-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-10-20
 +
| Well Log Performed
 +
|-
 +
| 2011-10-22
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2011-10-22
 +
| Plug Back Performed
 +
|-
 +
| 2012-09-29
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2012-09-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-09-29
 +
| Well Log Performed
 +
|-
 +
| 2012-09-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-09-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-09-30
 +
| Plug Back Performed
 +
|-
 +
| 2012-09-30
 +
| Well Log Performed
 +
|-
 +
| 2012-09-30
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2012-10-03
 +
| Well Log Performed
 +
|-
 +
| 2012-10-04
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-10-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-10-04
 +
| Plug Back Performed
 +
|-
 +
| 2012-10-04
 +
| Well Log Performed
 +
|-
 +
| 2012-10-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2012-10-05
 +
| Plug Back Performed
 +
|-
 +
| 2013-07-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-07-22
 +
| Well Log Performed
 +
|-
 +
| 2013-07-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-07-23
 +
| Well Log Performed
 +
|-
 +
| 2013-07-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2013-07-25
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2013-07-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-07-26
 +
| Well Log Performed
 +
|-
 +
| 2013-07-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2013-07-29
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2013-07-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-07-29
 +
| Well Log Performed
 +
|-
 +
| 2013-07-30
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2013-07-31
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2013-07-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-07-31
 +
| Well Log Performed
 +
|-
 +
| 2013-08-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2013-08-08
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2011-08-10
 +
| Perforation
 +
| style="text-align: right;" | 982.50
 +
| style="text-align: right;" | 983.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-10-22
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 943.00
 +
| style="text-align: right;" | 946.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-29
 +
| Perforation
 +
| style="text-align: right;" | 687.40
 +
| style="text-align: right;" | 688.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-09-29
 +
| Perforation
 +
| style="text-align: right;" | 686.00
 +
| style="text-align: right;" | 687.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-09-29
 +
| Acid Treatment
 +
| style="text-align: right;" | 687.40
 +
| style="text-align: right;" | 688.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-29
 +
| Acid Treatment
 +
| style="text-align: right;" | 686.00
 +
| style="text-align: right;" | 687.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-30
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 672.00
 +
| style="text-align: right;" | 680.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-30
 +
| Perforation
 +
| style="text-align: right;" | 371.00
 +
| style="text-align: right;" | 373.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-09-30
 +
| Perforation
 +
| style="text-align: right;" | 372.40
 +
| style="text-align: right;" | 378.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-10-04
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 351.00
 +
| style="text-align: right;" | 359.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-10-04
 +
| Perforation
 +
| style="text-align: right;" | 294.50
 +
| style="text-align: right;" | 295.60
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2011-08-10
 +
| Perforation
 +
| style="text-align: right;" | 976.50
 +
| style="text-align: right;" | 978.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-10-05
 +
| Cement Squeeze
 +
| style="text-align: right;" | 294.50
 +
| style="text-align: right;" | 295.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-07-21
 +
| Perforation
 +
| style="text-align: right;" | 371.00
 +
| style="text-align: right;" | 373.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2013-07-21
 +
| Perforation
 +
| style="text-align: right;" | 372.40
 +
| style="text-align: right;" | 378.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2013-07-23
 +
| Perforation
 +
| style="text-align: right;" | 656.00
 +
| style="text-align: right;" | 658.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-07-24
 +
| Acid Treatment
 +
| style="text-align: right;" | 656.00
 +
| style="text-align: right;" | 658.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-07-25
 +
| Cement Squeeze
 +
| style="text-align: right;" | 656.00
 +
| style="text-align: right;" | 658.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-07-26
 +
| Perforation
 +
| style="text-align: right;" | 586.00
 +
| style="text-align: right;" | 590.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-07-27
 +
| Cement Squeeze
 +
| style="text-align: right;" | 586.00
 +
| style="text-align: right;" | 590.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-07-29
 +
| Perforation
 +
| style="text-align: right;" | 322.00
 +
| style="text-align: right;" | 325.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-07-29
 +
| Acid Treatment
 +
| style="text-align: right;" | 322.00
 +
| style="text-align: right;" | 325.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-08-10
 +
| Perforation
 +
| style="text-align: right;" | 972.50
 +
| style="text-align: right;" | 974.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-07-30
 +
| Cement Squeeze
 +
| style="text-align: right;" | 322.00
 +
| style="text-align: right;" | 325.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-07-31
 +
| Perforation
 +
| style="text-align: right;" | 189.00
 +
| style="text-align: right;" | 191.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2013-07-31
 +
| Acid Treatment
 +
| style="text-align: right;" | 189.00
 +
| style="text-align: right;" | 191.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-01
 +
| Cement Squeeze
 +
| style="text-align: right;" | 189.00
 +
| style="text-align: right;" | 191.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-08-10
 +
| Perforation
 +
| style="text-align: right;" | 943.50
 +
| style="text-align: right;" | 946.00
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Total Depth: 1027.0m
+
| 2011-08-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 982.50
 +
| style="text-align: right;" | 983.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2011-08-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 976.50
 +
| style="text-align: right;" | 978.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Abandoned Zone
+
| 2011-08-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 972.50
 +
| style="text-align: right;" | 974.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2011-08-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 943.50
 +
| style="text-align: right;" | 946.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2011-10-20
 +
| Perforation
 +
| style="text-align: right;" | 943.00
 +
| style="text-align: right;" | 946.00
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Latitude: 50.24186800000001085
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| Longitude: -111.58422500000000355
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-10-06
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2012-10-06
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2012-10-06
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2013-08-06
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 07:26, 19 January 2021

Well Details

Well ID: 0154121005000
Loading map...
Location: 00/05-10-015-12W4/0
Location Alias: 00/05-10-15-12 W4M
Location Alias 2: 00/05-10-015-12 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 12
Section: 10
County/Municipality: County of Newell
Well Name: Imaginea ALDSON 5-10-15-12
Operator Name: Cor4 Oil Corp.
License Number: 0432034
License Date: 2011-03-03
License Status: Abandoned
Spud Date: 2011-07-28
Final Drill Date: 2011-07-31
Well Total Depth: 1027.00 m
Surface Hole Latitude: 50.241868
Surface Hole Longitude: -111.584225

For data sources see[1][2]

Well History

Date Event
2011-03-03 Obtained License
2011-07-29 Surface Casing Operation Performed
2011-07-31 Finished Drilling
2011-07-31 Well Mode changed to Drilled and Cased
2011-08-01 Production Casing Operation Performed
2011-08-01 Rig Released
2011-08-01 Well Log Performed
2011-08-09 Well Log Performed
2011-08-10 Perforation Treatment Performed - Jet Perforation
2011-08-10 Well Log Performed
2011-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-20 Perforation Treatment Performed - Jet Perforation
2011-10-20 Well Log Performed
2011-10-22 Perforation Treatment Performed - Remedial Casing
2011-10-22 Plug Back Performed
2012-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-09-29 Perforation Treatment Performed - Jet Perforation
2012-09-29 Well Log Performed
2012-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-30 Perforation Treatment Performed - Jet Perforation
2012-09-30 Plug Back Performed
2012-09-30 Well Log Performed
2012-09-30 Well Mode changed to Abandoned Zone
2012-10-03 Well Log Performed
2012-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-10-04 Perforation Treatment Performed - Jet Perforation
2012-10-04 Plug Back Performed
2012-10-04 Well Log Performed
2012-10-05 Perforation Treatment Performed - Cement Squeeze
2012-10-05 Plug Back Performed
2013-07-21 Perforation Treatment Performed - Jet Perforation
2013-07-22 Well Log Performed
2013-07-23 Perforation Treatment Performed - Jet Perforation
2013-07-23 Well Log Performed
2013-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-25 Perforation Treatment Performed - Cement Squeeze
2013-07-26 Perforation Treatment Performed - Jet Perforation
2013-07-26 Well Log Performed
2013-07-27 Perforation Treatment Performed - Cement Squeeze
2013-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-29 Perforation Treatment Performed - Jet Perforation
2013-07-29 Well Log Performed
2013-07-30 Perforation Treatment Performed - Cement Squeeze
2013-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-31 Perforation Treatment Performed - Jet Perforation
2013-07-31 Well Log Performed
2013-08-01 Perforation Treatment Performed - Cement Squeeze
2013-08-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-10 Perforation 982.50 983.50 17
2011-10-22 Remedial Casing Cementing 943.00 946.00 0
2012-09-29 Perforation 687.40 688.80 13
2012-09-29 Perforation 686.00 687.40 13
2012-09-29 Acid Treatment 687.40 688.80 0
2012-09-29 Acid Treatment 686.00 687.40 0
2012-09-30 Packing Device Capped w/Cement 672.00 680.00 0
2012-09-30 Perforation 371.00 373.00 13
2012-09-30 Perforation 372.40 378.80 13
2012-10-04 Packing Device Capped w/Cement 351.00 359.00 0
2012-10-04 Perforation 294.50 295.60 20
2011-08-10 Perforation 976.50 978.50 17
2012-10-05 Cement Squeeze 294.50 295.60 0
2013-07-21 Perforation 371.00 373.00 13
2013-07-21 Perforation 372.40 378.80 13
2013-07-23 Perforation 656.00 658.00 17
2013-07-24 Acid Treatment 656.00 658.00 0
2013-07-25 Cement Squeeze 656.00 658.00 0
2013-07-26 Perforation 586.00 590.00 17
2013-07-27 Cement Squeeze 586.00 590.00 0
2013-07-29 Perforation 322.00 325.00 17
2013-07-29 Acid Treatment 322.00 325.00 0
2011-08-10 Perforation 972.50 974.00 17
2013-07-30 Cement Squeeze 322.00 325.00 0
2013-07-31 Perforation 189.00 191.00 17
2013-07-31 Acid Treatment 189.00 191.00 0
2013-08-01 Cement Squeeze 189.00 191.00 0
2011-08-10 Perforation 943.50 946.00 17
2011-08-12 Acid Treatment 982.50 983.50 0
2011-08-12 Acid Treatment 976.50 978.50 0
2011-08-12 Acid Treatment 972.50 974.00 0
2011-08-12 Acid Treatment 943.50 946.50 0
2011-10-20 Perforation 943.00 946.00 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-06 No Incident Encountered 0.00 0.00
2012-10-06 No Incident Encountered 0.00 0.00
2012-10-06 No Incident Encountered 0.00 0.00
2013-08-06 No Incident Encountered 0.00 0.00

For data sources see[5]

References