If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 276: | Line 276: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0154113412022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.304551,"lon":-111.442845,"icon":""}]} |
Location: 02/12-34-015-11W4/2 | |
Location Alias: 02/12-34-15-11 W4M | |
Location Alias 2: 02/12-34-015-11 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 11 | |
Section: 34 | |
County/Municipality: County of Newell | |
Well Name: TXNE ALDSON 12-34-15-11 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0437633 | |
License Date: 2011-10-13 | |
License Status: Suspension | |
Spud Date: 2011-11-06 | |
Final Drill Date: 2011-11-08 | |
Well Total Depth: 1079.00 m | |
Surface Hole Latitude: 50.304551 | |
Surface Hole Longitude: -111.442845 |
Date | Event |
---|---|
2011-10-13 | Obtained License |
2011-11-07 | Surface Casing Operation Performed |
2011-11-08 | Finished Drilling |
2011-11-08 | Well Log Performed |
2011-11-08 | Well Mode changed to Drilled and Cased |
2011-11-09 | Production Casing Operation Performed |
2011-11-09 | Rig Released |
2011-11-09 | Well Log Performed |
2011-12-01 | Perforation Treatment Performed - Jet Perforation |
2011-12-01 | Well Log Performed |
2011-12-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-12-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-12-08 | Plug Back Performed |
2011-12-08 | Well Log Performed |
2012-03-22 | Perforation Treatment Performed - Jet Perforation |
2012-03-22 | Well Log Performed |
2012-04-23 | Perforation Treatment Performed - Fractured |
2012-08-03 | Well Began Production |
2012-08-03 | Well Fluid changed to Crude Oil |
2012-08-03 | Well Mode changed to Pumping |
2016-03-15 | Well Fluid changed to Crude Oil |
2016-03-15 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-01 | Perforation | 995.00 | 1000.00 | 17 |
2011-12-03 | Acid Treatment | 995.00 | 1000.00 | 0 |
2011-12-08 | Packing Device Capped w/Cement | 982.00 | 990.00 | 0 |
2012-03-22 | Perforation | 969.50 | 972.00 | 20 |
2012-04-23 | Fracture | 969.50 | 972.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3334 | 0.0 | 0.0 | 0.0 |
2013 | 8567 | 0.0 | 0.0 | 0.0 |
2014 | 4026 | 0.0 | 0.0 | 0.0 |
For data sources see[5]