X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0674222912000"

m
m
 
Line 179: Line 179:
 
| style="text-align: right;" | 593.00
 
| style="text-align: right;" | 593.00
 
| style="text-align: right;" | 594.00
 
| style="text-align: right;" | 594.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-03-15
 +
| Perforation
 +
| style="text-align: right;" | 468.50
 +
| style="text-align: right;" | 469.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2001-01-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 459.00
 +
| style="text-align: right;" | 467.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-01-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 448.00
 +
| style="text-align: right;" | 456.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-01-18
 +
| Perforation
 +
| style="text-align: right;" | 433.70
 +
| style="text-align: right;" | 434.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2017-01-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 418.00
 +
| style="text-align: right;" | 426.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 227: Line 257:
 
| style="text-align: right;" | 485.00
 
| style="text-align: right;" | 485.00
 
| style="text-align: right;" | 493.00
 
| style="text-align: right;" | 493.00
| style="text-align: right;" | 0
 
|-
 
| 1997-03-15
 
| Perforation
 
| style="text-align: right;" | 468.50
 
| style="text-align: right;" | 469.00
 
| style="text-align: right;" | 13
 
|-
 
| 2001-01-17
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 459.00
 
| style="text-align: right;" | 467.00
 
| style="text-align: right;" | 0
 
|-
 
| 2001-01-18
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 448.00
 
| style="text-align: right;" | 456.00
 
| style="text-align: right;" | 0
 
|-
 
| 2001-01-18
 
| Perforation
 
| style="text-align: right;" | 433.70
 
| style="text-align: right;" | 434.20
 
| style="text-align: right;" | 13
 
|-
 
| 2017-01-25
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 418.00
 
| style="text-align: right;" | 426.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 343: Line 343:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 05:14, 19 January 2021

Well Details

Well ID: 0674222912000
Loading map...
Location: 00/12-29-067-22W4/0
Location Alias: 00/12-29-67-22 W4M
Location Alias 2: 00/12-29-067-22 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 22
Section: 29
County/Municipality: Athabasca County
Well Name: RENAISSANCE BAPTISTE 12-29-67-22
Operator Name: Husky Oil Operations Limited
License Number: 0178833
License Date: 1995-06-23
License Status: Abandoned
Spud Date: 1995-07-18
Final Drill Date: 1995-07-20
Well Total Depth: 594.00 m
Surface Hole Latitude: 54.830110
Surface Hole Longitude: -113.331472

For data sources see[1][2]

Well History

Date Event
1995-06-23 Obtained License
1995-07-19 Surface Casing Operation Performed
1995-07-20 Finished Drilling
1995-07-20 Well Log Performed
1995-07-20 Well Mode changed to Drilled and Cased
1995-07-21 Production Casing Operation Performed
1995-07-21 Rig Released
1995-07-27 Perforation Treatment Performed - Open-Hole Completion
1995-10-01 Well Began Production
1995-10-01 Well Fluid changed to Gas
1995-10-01 Well Mode changed to Flowing
1995-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-20 Perforation Treatment Performed - Jet Perforation
1995-12-20 Plug Back Performed
1995-12-20 Well Fluid changed to Gas
1995-12-20 Well Mode changed to Abandoned Zone
1996-02-26 Perforation Treatment Performed - Jet Perforation
1997-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-15 Perforation Treatment Performed - Jet Perforation
2001-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-18 Perforation Treatment Performed - Jet Perforation
2001-01-18 Plug Back Performed
2001-01-18 Well Log Performed
2017-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-25 Plug Back Performed
2017-02-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-27 Open Hole/Barefoot Completion 593.00 594.00 0
1997-03-15 Perforation 468.50 469.00 13
2001-01-17 Packing Device Capped w/Cement 459.00 467.00 0
2001-01-18 Packing Device Capped w/Cement 448.00 456.00 0
2001-01-18 Perforation 433.70 434.20 13
2017-01-25 Packing Device Capped w/Cement 418.00 426.00 0
1995-12-20 Packing Device Capped w/Cement 570.00 578.00 0
1995-12-20 Perforation 496.50 498.00 13
1995-12-20 Perforation 509.00 510.00 13
1995-12-20 Perforation 525.50 526.00 13
1996-02-26 Perforation 444.50 448.00 13
1996-02-26 Perforation 457.50 459.00 13
1997-03-15 Packing Device Capped w/Cement 486.70 494.80 0
1997-03-15 Packing Device Capped w/Cement 485.00 493.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1853 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References