If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0154032807002 | | Well ID: 0154032807002 | ||
| − | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 50.286565, -110.354775 | width=100% | height=100% }} |
| + | |- | ||
| + | | Location: 00/07-28-015-03W4/2 | ||
| + | |- | ||
| + | | Location Alias: 00/07-28-15-03 W4M | ||
| + | |- | ||
| + | | Location Alias 2: 00/07-28-015-03 W4/02 | ||
| + | |- | ||
| + | | Country: Canada | ||
| + | |- | ||
| + | | Province: Alberta | ||
| + | |- | ||
| + | | Township: 015 | ||
| + | |- | ||
| + | | Meridian: 4 | ||
| + | |- | ||
| + | | Range: 03 | ||
| + | |- | ||
| + | | Section: 28 | ||
| + | |- | ||
| + | | County/Municipality: [[Cypress County,_Alberta|Cypress County]] | ||
|- | |- | ||
| Well Name: GASCAN MEDICINE HAT 7-28-15-3 | | Well Name: GASCAN MEDICINE HAT 7-28-15-3 | ||
|- | |- | ||
| − | | Operator: | + | | Operator Name: [[TAQA North Ltd.]] |
| + | |- | ||
| + | | License Number: 0065150 | ||
|- | |- | ||
| License Date: 1977-08-05 | | License Date: 1977-08-05 | ||
|- | |- | ||
| − | | Final Drilling Date | + | | License Status: Issued |
| + | |- | ||
| + | | Spud Date: 1977-08-29 | ||
| + | |- | ||
| + | | Final Drill Date: 1977-09-04 | ||
| + | |- | ||
| + | | Well Total Depth: 1005.80 m | ||
| + | |- | ||
| + | | Surface Hole Latitude: 50.286565 | ||
| + | |- | ||
| + | | Surface Hole Longitude: -110.354775 | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Licensing Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
| + | | title = General Well Data File - Drilling Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | == Well History == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Date | ||
| + | !scope="col" | Event | ||
| + | |- | ||
| + | | 1909-09-09 | ||
| + | | Well Log Performed | ||
| + | |- | ||
| + | | 1977-08-05 | ||
| + | | Obtained License | ||
| + | |- | ||
| + | | 1977-09-04 | ||
| + | | Finished Drilling | ||
| + | |- | ||
| + | | 1977-09-04 | ||
| + | | Well Mode changed to Drilled and Cased | ||
| + | |- | ||
| + | | 1977-09-06 | ||
| + | | Drill Stem Test Performed | ||
| + | |- | ||
| + | | 1977-09-08 | ||
| + | | Drill Stem Test Performed | ||
| + | |- | ||
| + | | 1977-09-09 | ||
| + | | Production Casing Operation Performed | ||
| + | |- | ||
| + | | 1978-05-02 | ||
| + | | Perforation Treatment Performed - Selective Bullet Perforations | ||
| + | |- | ||
| + | | 1978-05-05 | ||
| + | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Perforation Treatment Performed - Selective Bullet Perforations | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Perforation Treatment Performed - Selective Bullet Perforations | ||
|- | |- | ||
| − | | | + | | 1979-08-11 |
| + | | Perforation Treatment Performed - Fractured | ||
|- | |- | ||
| − | | | + | | 1979-10-08 |
| + | | Perforation Treatment Performed - Selective Bullet Perforations | ||
|- | |- | ||
| − | | | + | | 1979-12-04 |
| + | | Well Began Production | ||
|- | |- | ||
| − | | Well | + | | 1979-12-04 |
| + | | Well Fluid changed to Gas | ||
|- | |- | ||
| − | | | + | | 1979-12-04 |
| + | | Well Mode changed to Flowing | ||
|- | |- | ||
| − | | | + | | 1987-01-06 |
| + | | Well Structure changed to Commingled | ||
|- | |- | ||
| − | | | + | | 1990-10-06 |
| + | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
|- | |- | ||
| − | | | + | | 1990-10-06 |
| + | | Plug Back Performed | ||
|- | |- | ||
|} | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-04-29 }}</ref> | ||
| + | <!--== Spud Table == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Spud Date | ||
| + | !scope="col" | Contractor | ||
| + | !scope="col" style="text-align: right;" | Rig Number | ||
| + | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
| + | !scope="col" | Activity Type | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
| + | <!--== Directional Drilling == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Start Date | ||
| + | !scope="col" style="text-align: right;" | Depth (m) | ||
| + | !scope="col" | Reason | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
| + | == Perforation Treatments == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Perforation Date | ||
| + | !scope="col" | Perforation Type | ||
| + | !scope="col" style="text-align: right;" | Interval Top (m) | ||
| + | !scope="col" style="text-align: right;" | Interval Base (m) | ||
| + | !scope="col" style="text-align: right;" | Number of Shots | ||
| + | |- | ||
| + | | 1978-05-02 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 820.20 | ||
| + | | style="text-align: right;" | 820.80 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 725.40 | ||
| + | | style="text-align: right;" | 726.60 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 727.90 | ||
| + | | style="text-align: right;" | 729.10 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 729.70 | ||
| + | | style="text-align: right;" | 731.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 733.30 | ||
| + | | style="text-align: right;" | 737.60 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 740.70 | ||
| + | | style="text-align: right;" | 744.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 745.20 | ||
| + | | style="text-align: right;" | 745.80 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 747.70 | ||
| + | | style="text-align: right;" | 750.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 751.00 | ||
| + | | style="text-align: right;" | 751.60 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 751.90 | ||
| + | | style="text-align: right;" | 752.20 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 753.20 | ||
| + | | style="text-align: right;" | 753.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-02 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 821.40 | ||
| + | | style="text-align: right;" | 821.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 754.10 | ||
| + | | style="text-align: right;" | 754.70 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 754.90 | ||
| + | | style="text-align: right;" | 755.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 755.90 | ||
| + | | style="text-align: right;" | 756.20 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 756.50 | ||
| + | | style="text-align: right;" | 757.10 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 757.70 | ||
| + | | style="text-align: right;" | 758.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 759.00 | ||
| + | | style="text-align: right;" | 759.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 759.60 | ||
| + | | style="text-align: right;" | 760.20 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 760.80 | ||
| + | | style="text-align: right;" | 761.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 515.70 | ||
| + | | style="text-align: right;" | 516.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 516.90 | ||
| + | | style="text-align: right;" | 517.60 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-05 | ||
| + | | Packing Device Capped w/Cement | ||
| + | | style="text-align: right;" | 804.70 | ||
| + | | style="text-align: right;" | 812.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 518.20 | ||
| + | | style="text-align: right;" | 518.80 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 519.40 | ||
| + | | style="text-align: right;" | 520.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 520.60 | ||
| + | | style="text-align: right;" | 521.20 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 521.80 | ||
| + | | style="text-align: right;" | 523.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 524.20 | ||
| + | | style="text-align: right;" | 525.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 529.40 | ||
| + | | style="text-align: right;" | 531.20 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 535.80 | ||
| + | | style="text-align: right;" | 544.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-07-07 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 547.10 | ||
| + | | style="text-align: right;" | 547.10 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-08-11 | ||
| + | | Fracture | ||
| + | | style="text-align: right;" | 515.70 | ||
| + | | style="text-align: right;" | 547.10 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 497.40 | ||
| + | | style="text-align: right;" | 498.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 703.80 | ||
| + | | style="text-align: right;" | 705.60 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 498.70 | ||
| + | | style="text-align: right;" | 499.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 499.90 | ||
| + | | style="text-align: right;" | 500.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 501.00 | ||
| + | | style="text-align: right;" | 501.70 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 502.30 | ||
| + | | style="text-align: right;" | 502.90 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 503.50 | ||
| + | | style="text-align: right;" | 504.10 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 504.70 | ||
| + | | style="text-align: right;" | 505.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 505.90 | ||
| + | | style="text-align: right;" | 507.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1979-10-08 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 512.70 | ||
| + | | style="text-align: right;" | 512.70 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1990-10-06 | ||
| + | | Packing Device Capped w/Cement | ||
| + | | style="text-align: right;" | 672.00 | ||
| + | | style="text-align: right;" | 680.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 709.00 | ||
| + | | style="text-align: right;" | 712.90 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 713.50 | ||
| + | | style="text-align: right;" | 715.10 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 716.90 | ||
| + | | style="text-align: right;" | 717.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 718.70 | ||
| + | | style="text-align: right;" | 720.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 1978-05-06 | ||
| + | | Selective Bullet Perforations | ||
| + | | style="text-align: right;" | 723.00 | ||
| + | | style="text-align: right;" | 724.20 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | <!--== Fracking Activities == | ||
| + | ==== Fracking Jobs ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Job Start Date | ||
| + | !scope="col" | Job End Date | ||
| + | !scope="col" | True Vertical Depth (ft) | ||
| + | !scope="col" | Total Water Volume (gal) | ||
| + | !scope="col" | Total Non-Water Volume (gal) | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--==== Fluid Composition Data ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Trade Name | ||
| + | !scope="col" | Supplier | ||
| + | !scope="col" | Purpose | ||
| + | !scope="col" | Ingredient Name | ||
| + | !scope="col" | CAS Number | ||
| + | !scope="col" | Additive Percentage by Mass | ||
| + | !scope="col" | Job Percentage by Mass | ||
| + | !scope="col" | Mass Used (lb) | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
| + | <!--== Water Sources == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Water Diversion Start Date | ||
| + | !scope="col" | Water Diversion End Date | ||
| + | !scope="col" | Water Source Type | ||
| + | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
| + | == Production Data == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Period | ||
| + | !scope="col" style="text-align: right;" | Total Production Hours | ||
| + | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
| + | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
| + | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
| + | |- | ||
| + | | 1979 | ||
| + | | style="text-align: right;" | 662 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 1980 | ||
| + | | style="text-align: right;" | 7851 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 1981 | ||
| + | | style="text-align: right;" | 8759 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 1982 | ||
| + | | style="text-align: right;" | 8035 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 1983 | ||
| + | | style="text-align: right;" | 5373 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 1984 | ||
| + | | style="text-align: right;" | 7427 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 1985 | ||
| + | | style="text-align: right;" | 7162 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 1986 | ||
| + | | style="text-align: right;" | 7216 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Well Production Data - All Alberta | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-25 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | <!--== Occurences == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Occurence Date | ||
| + | !scope="col" | Occurence Type | ||
| + | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
| + | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
==References== | ==References== | ||
| − | + | <references/> | |
| − | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
| − | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
| Well ID: 0154032807002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.286565,"lon":-110.354775,"icon":""}]} |
| Location: 00/07-28-015-03W4/2 | |
| Location Alias: 00/07-28-15-03 W4M | |
| Location Alias 2: 00/07-28-015-03 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 015 | |
| Meridian: 4 | |
| Range: 03 | |
| Section: 28 | |
| County/Municipality: Cypress County | |
| Well Name: GASCAN MEDICINE HAT 7-28-15-3 | |
| Operator Name: TAQA North Ltd. | |
| License Number: 0065150 | |
| License Date: 1977-08-05 | |
| License Status: Issued | |
| Spud Date: 1977-08-29 | |
| Final Drill Date: 1977-09-04 | |
| Well Total Depth: 1005.80 m | |
| Surface Hole Latitude: 50.286565 | |
| Surface Hole Longitude: -110.354775 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-08-05 | Obtained License |
| 1977-09-04 | Finished Drilling |
| 1977-09-04 | Well Mode changed to Drilled and Cased |
| 1977-09-06 | Drill Stem Test Performed |
| 1977-09-08 | Drill Stem Test Performed |
| 1977-09-09 | Production Casing Operation Performed |
| 1978-05-02 | Perforation Treatment Performed - Selective Bullet Perforations |
| 1978-05-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1978-05-06 | Perforation Treatment Performed - Selective Bullet Perforations |
| 1979-07-07 | Perforation Treatment Performed - Selective Bullet Perforations |
| 1979-08-11 | Perforation Treatment Performed - Fractured |
| 1979-10-08 | Perforation Treatment Performed - Selective Bullet Perforations |
| 1979-12-04 | Well Began Production |
| 1979-12-04 | Well Fluid changed to Gas |
| 1979-12-04 | Well Mode changed to Flowing |
| 1987-01-06 | Well Structure changed to Commingled |
| 1990-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-10-06 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1978-05-02 | Selective Bullet Perforations | 820.20 | 820.80 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 725.40 | 726.60 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 727.90 | 729.10 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 729.70 | 731.50 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 733.30 | 737.60 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 740.70 | 744.30 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 745.20 | 745.80 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 747.70 | 750.40 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 751.00 | 751.60 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 751.90 | 752.20 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 753.20 | 753.50 | 0 |
| 1978-05-02 | Selective Bullet Perforations | 821.40 | 821.40 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 754.10 | 754.70 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 754.90 | 755.30 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 755.90 | 756.20 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 756.50 | 757.10 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 757.70 | 758.30 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 759.00 | 759.30 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 759.60 | 760.20 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 760.80 | 761.40 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 515.70 | 516.40 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 516.90 | 517.60 | 0 |
| 1978-05-05 | Packing Device Capped w/Cement | 804.70 | 812.30 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 518.20 | 518.80 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 519.40 | 520.00 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 520.60 | 521.20 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 521.80 | 523.00 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 524.20 | 525.40 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 529.40 | 531.20 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 535.80 | 544.00 | 0 |
| 1979-07-07 | Selective Bullet Perforations | 547.10 | 547.10 | 0 |
| 1979-08-11 | Fracture | 515.70 | 547.10 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 497.40 | 498.00 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 703.80 | 705.60 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 498.70 | 499.30 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 499.90 | 500.50 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 501.00 | 501.70 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 502.30 | 502.90 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 503.50 | 504.10 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 504.70 | 505.40 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 505.90 | 507.50 | 0 |
| 1979-10-08 | Selective Bullet Perforations | 512.70 | 512.70 | 0 |
| 1990-10-06 | Packing Device Capped w/Cement | 672.00 | 680.00 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 709.00 | 712.90 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 713.50 | 715.10 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 716.90 | 717.50 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 718.70 | 720.50 | 0 |
| 1978-05-06 | Selective Bullet Perforations | 723.00 | 724.20 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1979 | 662 | 0.0 | 0.0 | 0.0 |
| 1980 | 7851 | 0.0 | 0.0 | 0.0 |
| 1981 | 8759 | 0.0 | 0.0 | 0.0 |
| 1982 | 8035 | 0.0 | 0.0 | 0.0 |
| 1983 | 5373 | 0.0 | 0.0 | 0.0 |
| 1984 | 7427 | 0.0 | 0.0 | 0.0 |
| 1985 | 7162 | 0.0 | 0.0 | 0.0 |
| 1986 | 7216 | 0.0 | 0.0 | 0.0 |
For data sources see[5]