X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0795050909000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0795050909000
 
| Well ID: 0795050909000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.835659, -114.708586 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.835659, -114.708586 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/09-09-079-05W5/0
 
| Location: 00/09-09-079-05W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/09-09-079-05 W5/00
 
| Location Alias 2: 00/09-09-079-05 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 079
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 05
 +
|-
 +
| Section: 09
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Opportunity No. 17,_Alberta|Municipal District of Opportunity No. 17]]
 
| County/Municipality: [[Municipal District of Opportunity No. 17,_Alberta|Municipal District of Opportunity No. 17]]
Line 29: Line 39:
 
| Final Drill Date: 1998-01-03
 
| Final Drill Date: 1998-01-03
 
|-
 
|-
| Well Total Depth: 588 m
+
| Well Total Depth: 588.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 55.835659
 
| Surface Hole Latitude: 55.835659
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1997-11-25
 +
| Obtained License
 +
|-
 +
| 1998-01-01
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1998-01-03
 +
| Finished Drilling
 +
|-
 +
| 1998-01-03
 +
| Well Log Performed
 +
|-
 +
| 1998-01-03
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1998-01-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 1998-01-04
 +
| Rig Released
 +
|-
 +
| 1998-01-04
 +
| Well Log Performed
 +
|-
 +
| 1998-02-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-02-11
 +
| Well Log Performed
 +
|-
 +
| 1998-03-04
 +
| Well Began Production
 +
|-
 +
| 1998-03-04
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1998-03-04
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2001-01-06
 +
| Well Log Performed
 +
|-
 +
| 2001-01-07
 +
| Well Log Performed
 +
|-
 +
| 2002-01-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-01-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-01-07
 +
| Plug Back Performed
 +
|-
 +
| 2002-01-07
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2002-01-07
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2004-01-30
 +
| Well Log Performed
 +
|-
 +
| 2005-01-04
 +
| Well Log Performed
 +
|-
 +
| 2005-01-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2005-01-29
 +
| Plug Back Performed
 +
|-
 +
| 2005-01-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-02-04
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2005-02-04
 +
| Plug Back Performed
 +
|-
 +
| 2005-02-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2005-02-05
 +
| Plug Back Performed
 +
|-
 +
| 2005-02-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-02-10
 +
| Well Log Performed
 +
|-
 +
| 2005-02-22
 +
| Well Log Performed
 +
|-
 +
| 2005-02-26
 +
| Well Log Performed
 +
|-
 +
| 2005-12-22
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2005-12-22
 +
| Plug Back Performed
 +
|-
 +
| 2006-01-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-01-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2006-01-05
 +
| Plug Back Performed
 +
|-
 +
| 2006-01-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-01-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2006-01-14
 +
| Plug Back Performed
 +
|-
 +
| 2006-01-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-01-24
 +
| Well Log Performed
 +
|-
 +
| 2006-02-18
 +
| Well Log Performed
 +
|-
 +
| 2006-04-09
 +
| Well Began Injection
 +
|-
 +
| 2006-04-09
 +
| Well Fluid changed to Water
 +
|-
 +
| 2006-04-09
 +
| Well Type changed to Disposal
 +
|-
 +
| 2017-01-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 240:
 
| 1998-02-11
 
| 1998-02-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 562
+
| style="text-align: right;" | 562.00
| style="text-align: right;" | 564
+
| style="text-align: right;" | 564.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
| 2002-01-07
+
| 2005-02-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 512
+
| style="text-align: right;" | 383.00
| style="text-align: right;" | 514.5
+
| style="text-align: right;" | 389.00
| style="text-align: right;" | 17
+
| style="text-align: right;" | 10
 +
|-
 +
| 2005-12-22
 +
| Cement Squeeze
 +
| style="text-align: right;" | 383.00
 +
| style="text-align: right;" | 389.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2002-01-07
+
| 2006-01-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 495
+
| style="text-align: right;" | 442.00
| style="text-align: right;" | 497
+
| style="text-align: right;" | 444.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
| 2002-01-07
+
| 2006-01-05
| Packing Device Capped w/Cement
+
| Cement Squeeze
| style="text-align: right;" | 549
+
| style="text-align: right;" | 442.00
| style="text-align: right;" | 557
+
| style="text-align: right;" | 444.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2005-01-29
+
| 2006-01-13
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 482
 
| style="text-align: right;" | 490
 
| style="text-align: right;" | 0
 
|-
 
| 2005-01-30
 
 
| Perforation
 
| Perforation
| style="text-align: right;" | 442
+
| style="text-align: right;" | 512.00
| style="text-align: right;" | 444
+
| style="text-align: right;" | 514.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
| 2005-01-30
+
| 2006-01-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 370
+
| style="text-align: right;" | 495.00
| style="text-align: right;" | 371
+
| style="text-align: right;" | 497.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
| 2005-02-04
+
| 2006-01-14
| Packing Device Capped w/Cement
+
| Cement Squeeze
| style="text-align: right;" | 431
+
| style="text-align: right;" | 512.00
| style="text-align: right;" | 439
+
| style="text-align: right;" | 514.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2005-02-05
+
| 2006-01-14
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 370
+
| style="text-align: right;" | 495.00
| style="text-align: right;" | 371
+
| style="text-align: right;" | 497.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2005-02-10
+
| 2006-01-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 383
+
| style="text-align: right;" | 562.00
| style="text-align: right;" | 389
+
| style="text-align: right;" | 564.00
| style="text-align: right;" | 10
 
|-
 
| 2005-12-22
 
| Cement Squeeze
 
| style="text-align: right;" | 383
 
| style="text-align: right;" | 389
 
| style="text-align: right;" | 0
 
|-
 
| 2006-01-04
 
| Perforation
 
| style="text-align: right;" | 442
 
| style="text-align: right;" | 444
 
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
| 2006-01-05
+
| 2017-01-11
| Cement Squeeze
+
| Acid Treatment
| style="text-align: right;" | 442
+
| style="text-align: right;" | 562.00
| style="text-align: right;" | 444
+
| style="text-align: right;" | 564.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2006-01-13
+
| 2002-01-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 512
+
| style="text-align: right;" | 512.00
| style="text-align: right;" | 514.5
+
| style="text-align: right;" | 514.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
| 2006-01-13
+
| 2002-01-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 495
+
| style="text-align: right;" | 495.00
| style="text-align: right;" | 497
+
| style="text-align: right;" | 497.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
| 2006-01-14
+
| 2002-01-07
| Cement Squeeze
+
| Packing Device Capped w/Cement
| style="text-align: right;" | 512
+
| style="text-align: right;" | 549.00
| style="text-align: right;" | 514.5
+
| style="text-align: right;" | 557.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2006-01-14
+
| 2005-01-29
| Cement Squeeze
+
| Packing Device Capped w/Cement
| style="text-align: right;" | 495
+
| style="text-align: right;" | 482.00
| style="text-align: right;" | 497
+
| style="text-align: right;" | 490.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2006-01-22
+
| 2005-01-30
 +
| Perforation
 +
| style="text-align: right;" | 442.00
 +
| style="text-align: right;" | 444.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-01-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 562
+
| style="text-align: right;" | 370.00
| style="text-align: right;" | 564
+
| style="text-align: right;" | 371.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
| 2017-01-11
+
| 2005-02-04
| Acid Treatment
+
| Packing Device Capped w/Cement
| style="text-align: right;" | 562
+
| style="text-align: right;" | 431.00
| style="text-align: right;" | 564
+
| style="text-align: right;" | 439.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-02-05
 +
| Cement Squeeze
 +
| style="text-align: right;" | 370.00
 +
| style="text-align: right;" | 371.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 190: Line 356:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 223: Line 403:
 
| 1998
 
| 1998
 
| style="text-align: right;" | 2785
 
| style="text-align: right;" | 2785
| style="text-align: right;" | 17721.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 229: Line 409:
 
| 1999
 
| 1999
 
| style="text-align: right;" | 8597
 
| style="text-align: right;" | 8597
| style="text-align: right;" | 68313.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3091.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2000
 
| 2000
 
| style="text-align: right;" | 8718
 
| style="text-align: right;" | 8718
| style="text-align: right;" | 53804.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 5053.6
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2001
 
| 2001
 
| style="text-align: right;" | 5644
 
| style="text-align: right;" | 5644
| style="text-align: right;" | 9208.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1381.4
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2002
 
| 2002
 
| style="text-align: right;" | 1016
 
| style="text-align: right;" | 1016
| style="text-align: right;" | 276.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 54.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2006
 
| 2006
Line 255: Line 435:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 16507.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2007
 
| 2007
Line 261: Line 441:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 31606.4
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2008
 
| 2008
Line 267: Line 447:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 28408.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2009
 
| 2009
Line 273: Line 453:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 21004.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2010
 
| 2010
Line 279: Line 459:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 20355.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2011
 
| 2011
Line 285: Line 465:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 24544.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2012
 
| 2012
Line 291: Line 471:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 29356.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2013
 
| 2013
Line 297: Line 477:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 26301.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2014
 
| 2014
Line 303: Line 483:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 18747.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2015
 
| 2015
Line 309: Line 489:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 15002.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2016
 
| 2016
Line 315: Line 495:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3543.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2017
 
| 2017
Line 321: Line 501:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 21262.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2018
 
| 2018
Line 327: Line 507:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 11704.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2019
 
| 2019
Line 333: Line 513:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 50.4
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 339: Line 519:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 350: Line 530:
 
|-
 
|-
 
| 2006-01-25
 
| 2006-01-25
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2017-01-11
 
| 2017-01-11
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 363: Line 543:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 21:30, 18 January 2021

Well Details

Well ID: 0795050909000
Loading map...
Location: 00/09-09-079-05W5/0
Location Alias: 00/09-09-79-05 W5M
Location Alias 2: 00/09-09-079-05 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 05
Section: 09
County/Municipality: Municipal District of Opportunity No. 17
Well Name: FIRENZE MARTEN 9-9-79-5
Operator Name: Firenze Energy Ltd.
License Number: 0209225
License Date: 1997-11-25
License Status: Issued
Spud Date: 1997-12-31
Final Drill Date: 1998-01-03
Well Total Depth: 588.00 m
Surface Hole Latitude: 55.835659
Surface Hole Longitude: -114.708586

For data sources see[1][2]

Well History

Date Event
1997-11-25 Obtained License
1998-01-01 Surface Casing Operation Performed
1998-01-03 Finished Drilling
1998-01-03 Well Log Performed
1998-01-03 Well Mode changed to Drilled and Cased
1998-01-04 Production Casing Operation Performed
1998-01-04 Rig Released
1998-01-04 Well Log Performed
1998-02-11 Perforation Treatment Performed - Jet Perforation
1998-02-11 Well Log Performed
1998-03-04 Well Began Production
1998-03-04 Well Fluid changed to Gas
1998-03-04 Well Mode changed to Flowing
2001-01-06 Well Log Performed
2001-01-07 Well Log Performed
2002-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-07 Perforation Treatment Performed - Jet Perforation
2002-01-07 Plug Back Performed
2002-01-07 Well Fluid changed to Gas
2002-01-07 Well Mode changed to Abandoned Zone
2004-01-30 Well Log Performed
2005-01-04 Well Log Performed
2005-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-29 Plug Back Performed
2005-01-30 Perforation Treatment Performed - Jet Perforation
2005-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-04 Plug Back Performed
2005-02-05 Perforation Treatment Performed - Cement Squeeze
2005-02-05 Plug Back Performed
2005-02-10 Perforation Treatment Performed - Jet Perforation
2005-02-10 Well Log Performed
2005-02-22 Well Log Performed
2005-02-26 Well Log Performed
2005-12-22 Perforation Treatment Performed - Cement Squeeze
2005-12-22 Plug Back Performed
2006-01-04 Perforation Treatment Performed - Jet Perforation
2006-01-05 Perforation Treatment Performed - Cement Squeeze
2006-01-05 Plug Back Performed
2006-01-13 Perforation Treatment Performed - Jet Perforation
2006-01-14 Perforation Treatment Performed - Cement Squeeze
2006-01-14 Plug Back Performed
2006-01-22 Perforation Treatment Performed - Jet Perforation
2006-01-24 Well Log Performed
2006-02-18 Well Log Performed
2006-04-09 Well Began Injection
2006-04-09 Well Fluid changed to Water
2006-04-09 Well Type changed to Disposal
2017-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-11 Perforation 562.00 564.00 17
2005-02-10 Perforation 383.00 389.00 10
2005-12-22 Cement Squeeze 383.00 389.00 0
2006-01-04 Perforation 442.00 444.00 17
2006-01-05 Cement Squeeze 442.00 444.00 0
2006-01-13 Perforation 512.00 514.50 17
2006-01-13 Perforation 495.00 497.00 17
2006-01-14 Cement Squeeze 512.00 514.50 0
2006-01-14 Cement Squeeze 495.00 497.00 0
2006-01-22 Perforation 562.00 564.00 17
2017-01-11 Acid Treatment 562.00 564.00 0
2002-01-07 Perforation 512.00 514.50 17
2002-01-07 Perforation 495.00 497.00 17
2002-01-07 Packing Device Capped w/Cement 549.00 557.00 0
2005-01-29 Packing Device Capped w/Cement 482.00 490.00 0
2005-01-30 Perforation 442.00 444.00 17
2005-01-30 Perforation 370.00 371.00 17
2005-02-04 Packing Device Capped w/Cement 431.00 439.00 0
2005-02-05 Cement Squeeze 370.00 371.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2785 0.0 0.0 0.0
1999 8597 0.0 0.0 0.0
2000 8718 0.0 0.0 0.0
2001 5644 0.0 0.0 0.0
2002 1016 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-01-25 No Incident Encountered 0.00 0.00
2017-01-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References