If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 217: | Line 217: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0114160711000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.89825,"lon":-112.181727,"icon":""}]} |
Location: 00/11-07-011-16W4/0 | |
Location Alias: 00/11-07-11-16 W4M | |
Location Alias 2: 00/11-07-011-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 16 | |
Section: 07 | |
County/Municipality: Municipal District of Taber | |
Well Name: CDN-SUP TABERN 11-7-11-16 | |
Operator Name: ExxonMobil Canada Resources Company | |
License Number: 0119614 | |
License Date: 1985-11-22 | |
License Status: RecCertified | |
Spud Date: 1985-11-28 | |
Final Drill Date: 1985-12-02 | |
Well Total Depth: 1011.00 m | |
Surface Hole Latitude: 49.898250 | |
Surface Hole Longitude: -112.181727 |
Date | Event |
---|---|
1985-11-22 | Obtained License |
1985-11-29 | Surface Casing Operation Performed |
1985-12-02 | Finished Drilling |
1985-12-02 | Well Log Performed |
1985-12-03 | Production Casing Operation Performed |
1985-12-04 | Rig Released |
1985-12-08 | Perforation Treatment Performed - Jet Perforation |
1985-12-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-12-10 | Well Mode changed to Drilled and Cased |
1998-05-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-05-15 | Plug Back Performed |
1998-05-15 | Well Mode changed to Abandoned Zone |
1998-07-22 | Well Abandoned |
1998-07-22 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-12-08 | Perforation | 971.50 | 975.00 | 13 |
1985-12-09 | Acid Treatment | 971.50 | 975.00 | 0 |
1998-05-15 | Packing Device Capped w/Cement | 956.00 | 965.00 | 0 |
For data sources see[4]