If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 309: | Line 309: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0094160913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.727334,"lon":-112.124406,"icon":""}]} |
Location: 00/13-09-009-16W4/0 | |
Location Alias: 00/13-09-09-16 W4M | |
Location Alias 2: 00/13-09-009-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 16 | |
Section: 09 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL HORSEFLY 13-9-9-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0081490 | |
License Date: 1980-03-04 | |
License Status: Suspension | |
Spud Date: 1980-03-27 | |
Final Drill Date: 1980-04-01 | |
Well Total Depth: 961.00 m | |
Surface Hole Latitude: 49.727334 | |
Surface Hole Longitude: -112.124406 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-03-04 | Obtained License |
1980-04-01 | Finished Drilling |
1980-04-01 | Well Mode changed to Drilled and Cased |
1980-04-02 | Production Casing Operation Performed |
1980-08-01 | Perforation Treatment Performed - Jet Perforation |
1980-09-17 | Well Began Production |
1980-09-17 | Well Fluid changed to Crude Oil |
1980-09-17 | Well Mode changed to Pumping |
1983-05-15 | Well Fluid changed to Crude Oil |
1983-05-15 | Well Mode changed to Pumping |
1997-12-02 | Well Fluid changed to Crude Oil |
1997-12-02 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-08-01 | Perforation | 955.00 | 959.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 144 | 0.0 | 0.0 | 0.0 |
1981 | 1512 | 0.0 | 0.0 | 0.0 |
1983 | 3778 | 0.0 | 0.0 | 0.0 |
1984 | 8759 | 0.0 | 0.0 | 0.0 |
1985 | 7296 | 0.0 | 0.0 | 0.0 |
1986 | 8759 | 0.0 | 0.0 | 0.0 |
1987 | 8015 | 0.0 | 0.0 | 0.0 |
1988 | 8111 | 0.0 | 0.0 | 0.0 |
1989 | 8527 | 0.0 | 0.0 | 0.0 |
1990 | 7509 | 0.0 | 0.0 | 0.0 |
1991 | 7838 | 0.0 | 0.0 | 0.0 |
1992 | 8687 | 0.0 | 0.0 | 0.0 |
1993 | 8139 | 0.0 | 0.0 | 0.0 |
1994 | 4751 | 0.0 | 0.0 | 0.0 |
1995 | 5170 | 0.0 | 0.0 | 0.0 |
1996 | 4978 | 0.0 | 0.0 | 0.0 |
1997 | 3743 | 0.0 | 0.0 | 0.0 |
For data sources see[5]