If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 321: | Line 321: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0374070215C00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.157983,"lon":-110.894889,"icon":""}]} |
Location: C0/15-02-037-07W4/0 | |
Location Alias: C0/15-02-37-07 W4M | |
Location Alias 2: C0/15-02-037-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 07 | |
Section: 02 | |
County/Municipality: Special Areas No. 4 | |
Well Name: DEML PROVOST 15-2-37-7 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0134288 | |
License Date: 1988-06-10 | |
License Status: Abandoned | |
Spud Date: 1988-07-09 | |
Final Drill Date: 1988-07-13 | |
Well Total Depth: 1004.00 m | |
Surface Hole Latitude: 52.157983 | |
Surface Hole Longitude: -110.894889 |
Date | Event |
---|---|
1988-06-10 | Obtained License |
1988-07-10 | Surface Casing Operation Performed |
1988-07-11 | Direction Drilling Operation Performed - Deviate |
1988-07-13 | Finished Drilling |
1988-07-13 | Well Mode changed to Drilled and Cased |
1988-07-14 | Production Casing Operation Performed |
1988-07-14 | Well Log Performed |
1988-07-15 | Rig Released |
1988-07-18 | Well Log Performed |
1988-08-20 | Well Log Performed |
1988-08-21 | Perforation Treatment Performed - Jet Perforation |
1988-08-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-24 | Perforation Treatment Performed - Cement Squeeze |
1988-08-27 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1988-08-27 | Well Log Performed |
1988-08-29 | Perforation Treatment Performed - Jet Perforation |
1988-08-29 | Well Log Performed |
1989-01-25 | Well Began Production |
1989-01-25 | Well Fluid changed to Crude Oil |
1989-01-25 | Well Mode changed to Pumping |
1994-10-11 | Well Log Performed |
1994-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-17 | Plug Back Performed |
1994-10-17 | Well Fluid changed to Crude Oil |
1994-10-17 | Well Mode changed to Abandoned |
1994-10-23 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1988-07-11 | 384.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-08-21 | Perforation | 950.50 | 955.00 | 13 |
1988-08-23 | Acid Treatment | 950.50 | 955.00 | 0 |
1988-08-24 | Cement Squeeze | 950.50 | 955.00 | 0 |
1988-08-27 | Hydra Jet Perforation | 950.50 | 954.50 | 0 |
1988-08-29 | Perforation | 950.50 | 954.50 | 13 |
1994-10-17 | Packing Device Capped w/Cement | 937.00 | 945.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 2454 | 0.0 | 0.0 | 0.0 |
1990 | 8580 | 0.0 | 0.0 | 0.0 |
1991 | 7518 | 0.0 | 0.0 | 0.0 |
1992 | 8353 | 0.0 | 0.0 | 0.0 |
1993 | 8096 | 0.0 | 0.0 | 0.0 |
1994 | 1781 | 0.0 | 0.0 | 0.0 |
For data sources see[6]