X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0454211712004"

m
m
 
Line 243: Line 243:
 
| style="text-align: right;" | 1472.20
 
| style="text-align: right;" | 1472.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1995-03-15
 +
| Perforation
 +
| style="text-align: right;" | 1127.00
 +
| style="text-align: right;" | 1130.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1995-07-30
 +
| Perforation
 +
| style="text-align: right;" | 1323.00
 +
| style="text-align: right;" | 1324.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-12-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1306.00
 +
| style="text-align: right;" | 1314.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-12-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1112.00
 +
| style="text-align: right;" | 1120.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-12-14
 +
| Perforation
 +
| style="text-align: right;" | 236.00
 +
| style="text-align: right;" | 237.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-12-14
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 236.00
 +
| style="text-align: right;" | 237.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-12-14
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 215.00
 +
| style="text-align: right;" | 230.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1951-02-11
 
| 1951-02-11
Line 290: Line 332:
 
| style="text-align: right;" | 1362.00
 
| style="text-align: right;" | 1362.00
 
| style="text-align: right;" | 1370.00
 
| style="text-align: right;" | 1370.00
| style="text-align: right;" | 0
 
|-
 
| 1995-03-15
 
| Perforation
 
| style="text-align: right;" | 1127.00
 
| style="text-align: right;" | 1130.00
 
| style="text-align: right;" | 17
 
|-
 
| 1995-07-30
 
| Perforation
 
| style="text-align: right;" | 1323.00
 
| style="text-align: right;" | 1324.50
 
| style="text-align: right;" | 17
 
|-
 
| 2006-12-13
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1306.00
 
| style="text-align: right;" | 1314.00
 
| style="text-align: right;" | 0
 
|-
 
| 2006-12-13
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1112.00
 
| style="text-align: right;" | 1120.00
 
| style="text-align: right;" | 0
 
|-
 
| 2006-12-14
 
| Perforation
 
| style="text-align: right;" | 236.00
 
| style="text-align: right;" | 237.00
 
| style="text-align: right;" | 13
 
|-
 
| 2006-12-14
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 236.00
 
| style="text-align: right;" | 237.00
 
| style="text-align: right;" | 0
 
|-
 
| 2006-12-14
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 215.00
 
| style="text-align: right;" | 230.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 420: Line 420:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:02, 18 January 2021

Well Details

Well ID: 0454211712004
Loading map...
Location: 00/12-17-045-21W4/4
Location Alias: 00/12-17-45-21 W4M
Location Alias 2: 00/12-17-045-21 W4/04
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 21
Section: 17
County/Municipality: Camrose County
Well Name: CNRL DUHAMEL 12-17-45-21
Operator Name: Canadian Natural Resources Limited
License Number: 0002509
License Date: 1951-01-06
License Status: Abandoned
Spud Date: 1951-01-12
Final Drill Date: 1951-02-07
Well Total Depth: 1490.50 m
Surface Hole Latitude: 52.881623
Surface Hole Longitude: -113.024461

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-01-06 Obtained License
1951-01-20 Drill Stem Test Performed
1951-01-28 Drill Stem Test Performed
1951-01-29 Drill Stem Test Performed
1951-01-30 Drill Stem Test Performed
1951-01-31 Drill Stem Test Performed
1951-02-03 Drill Stem Test Performed
1951-02-04 Drill Stem Test Performed
1951-02-06 Drill Stem Test Performed
1951-02-07 Finished Drilling
1951-02-07 Well Mode changed to Drilled and Cased
1951-02-08 Production Casing Operation Performed
1951-02-10 Drill Stem Test Performed
1951-02-10 Perforation Treatment Performed - Bullet Perforation
1951-02-11 Perforation Treatment Performed - Jet Perforation
1951-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-18 Perforation Treatment Performed - Jet Perforation
1991-11-08 Well Log Performed
1991-11-09 Well Log Performed
1991-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-15 Perforation Treatment Performed - Jet Perforation
1991-11-15 Plug Back Performed
1991-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-14 Plug Back Performed
1995-03-15 Perforation Treatment Performed - Jet Perforation
1995-03-15 Well Log Performed
1995-07-30 Perforation Treatment Performed - Jet Perforation
1995-07-30 Well Log Performed
1995-12-18 Well Began Production
1995-12-18 Well Fluid changed to Crude Oil
1995-12-18 Well Mode changed to Pumping
2002-05-01 Well Fluid changed to Crude Oil
2002-05-01 Well Mode changed to Suspended
2006-12-12 Well Log Performed
2006-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-13 Plug Back Performed
2006-12-13 Well Fluid changed to Crude Oil
2006-12-13 Well Mode changed to Abandoned Zone
2006-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-14 Perforation Treatment Performed - Jet Perforation
2006-12-14 Perforation Treatment Performed - Remedial Casing
2006-12-14 Plug Back Performed
2006-12-14 Well Log Performed
2007-01-17 Well Abandoned
2007-01-17 Well Fluid changed to Crude Oil
2007-01-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-02-10 Bullet Perforation 1471.90 1472.20 13
1995-03-15 Perforation 1127.00 1130.00 17
1995-07-30 Perforation 1323.00 1324.50 17
2006-12-13 Packing Device Capped w/Cement 1306.00 1314.00 0
2006-12-13 Packing Device Capped w/Cement 1112.00 1120.00 0
2006-12-14 Perforation 236.00 237.00 13
2006-12-14 Remedial Casing Cementing 236.00 237.00 0
2006-12-14 Packing Device Capped w/Cement 215.00 230.00 0
1951-02-11 Perforation 1461.50 1472.20 20
1951-02-12 Acid Treatment 1461.50 1472.20 0
1991-09-18 Perforation 1460.90 1472.00 13
1991-11-15 Packing Device Capped w/Cement 1440.00 1448.00 0
1991-11-15 Perforation 1374.50 1377.50 13
1991-11-15 Perforation 1379.50 1381.50 13
1991-11-17 Acid Treatment 1374.50 1381.50 0
1995-03-14 Packing Device Capped w/Cement 1362.00 1370.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 288 0.0 0.0 0.0
1996 8467 0.0 0.0 0.0
1997 3095 0.0 0.0 0.0

For data sources see[5]

References