X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0746082607000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0746082607000
 
| Well ID: 0746082607000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.437523, -119.111782 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.437523, -119.111782 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-26-074-08W6/0
 
| Location: 00/07-26-074-08W6/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/07-26-074-08 W6/00
 
| Location Alias 2: 00/07-26-074-08 W6/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 074
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 08
 +
|-
 +
| Section: 26
 
|-
 
|-
 
| County/Municipality: [[County of Grande Prairie No. 1,_Alberta|County of Grande Prairie No. 1]]
 
| County/Municipality: [[County of Grande Prairie No. 1,_Alberta|County of Grande Prairie No. 1]]
Line 17: Line 27:
 
| Well Name: ARCO LA GLACE 7-26-74-8
 
| Well Name: ARCO LA GLACE 7-26-74-8
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Suncor Energy Inc.]]
 
|-
 
|-
 
| License Number: 0007897
 
| License Number: 0007897
Line 29: Line 39:
 
| Final Drill Date: 1954-10-28
 
| Final Drill Date: 1954-10-28
 
|-
 
|-
| Well Total Depth: 2746.2 m
+
| Well Total Depth: 2746.20 m
 
|-
 
|-
 
| Surface Hole Latitude: 55.437523
 
| Surface Hole Latitude: 55.437523
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1954-04-01
 +
| Obtained License
 +
|-
 +
| 1954-05-31
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-06-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-06-03
 +
| Lost Circulation Occurred
 +
|-
 +
| 1954-06-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-06-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-06-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-06-12
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-06-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-06-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-06-29
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-07-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-07-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-07-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-08-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-08-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-08-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-09-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-09-20
 +
| Production Casing Operation Performed
 +
|-
 +
| 1954-10-28
 +
| Finished Drilling
 +
|-
 +
| 1954-10-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1954-11-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-11-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-11-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1954-11-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-11-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-11-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1954-11-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-11-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1954-11-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-11-14
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-11-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1954-11-15
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1954-11-16
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1954-12-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-05
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1954-12-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-10
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1954-12-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1954-12-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1954-12-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-18
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-19
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1954-12-21
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1954-12-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-23
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1954-12-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1954-12-29
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-31
 +
| Drill Stem Test Performed
 +
|-
 +
| 1954-12-31
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1955-01-01
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1955-01-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-01-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1955-01-03
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1955-01-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-01-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1955-01-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1955-01-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-01-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1955-01-18
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1955-01-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1955-01-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1955-01-30
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1955-05-26
 +
| Well Began Production
 +
|-
 +
| 1955-05-26
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1955-05-26
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1957-04-07
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1957-04-07
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1957-05-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1957-06-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1957-07-02
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1957-07-04
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1958-12-16
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1958-12-16
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1963-11-29
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1963-12-01
 +
| Well Abandoned
 +
|-
 +
| 1963-12-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1963-12-01
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1964-06-05
 +
| Drill Stem Test Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 375:
 
| 1954-11-01
 
| 1954-11-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2421.9
+
| style="text-align: right;" | 2421.90
| style="text-align: right;" | 2426.2
+
| style="text-align: right;" | 2426.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 1954-11-03
 
| Cement Squeeze
 
| style="text-align: right;" | 2421.9
 
| style="text-align: right;" | 2426.2
 
| style="text-align: right;" | 0
 
|-
 
| 1954-11-06
 
| Perforation
 
| style="text-align: right;" | 2351.2
 
| style="text-align: right;" | 2353.7
 
| style="text-align: right;" | 13
 
|-
 
| 1954-11-09
 
| Cement Squeeze
 
| style="text-align: right;" | 2351.2
 
| style="text-align: right;" | 2353.7
 
| style="text-align: right;" | 0
 
|-
 
| 1954-11-11
 
| Cement Squeeze
 
| style="text-align: right;" | 2351.2
 
| style="text-align: right;" | 2353.7
 
| style="text-align: right;" | 0
 
|-
 
| 1954-11-13
 
| Perforation
 
| style="text-align: right;" | 2339
 
| style="text-align: right;" | 2339.3
 
| style="text-align: right;" | 13
 
|-
 
| 1954-11-14
 
| Cement Squeeze
 
| style="text-align: right;" | 2339
 
| style="text-align: right;" | 2339.3
 
| style="text-align: right;" | 0
 
|-
 
| 1954-11-15
 
| Acid Treatment
 
| style="text-align: right;" | 2339
 
| style="text-align: right;" | 2339.3
 
| style="text-align: right;" | 0
 
|-
 
| 1954-11-16
 
| Cement Squeeze
 
| style="text-align: right;" | 2339
 
| style="text-align: right;" | 2339.3
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1954-12-04
 
| 1954-12-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2344.8
+
| style="text-align: right;" | 2344.80
| style="text-align: right;" | 2345.7
+
| style="text-align: right;" | 2345.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-06
 
| 1954-12-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2343.3
+
| style="text-align: right;" | 2343.30
| style="text-align: right;" | 2344.5
+
| style="text-align: right;" | 2344.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-12-06
 
| 1954-12-06
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2343.3
+
| style="text-align: right;" | 2343.30
| style="text-align: right;" | 2345.7
+
| style="text-align: right;" | 2345.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-09
 
| 1954-12-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2311.6
+
| style="text-align: right;" | 2311.60
| style="text-align: right;" | 2315.3
+
| style="text-align: right;" | 2315.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-12-10
 
| 1954-12-10
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2311.6
+
| style="text-align: right;" | 2311.60
| style="text-align: right;" | 2345.7
+
| style="text-align: right;" | 2345.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-13
 
| 1954-12-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2304.9
+
| style="text-align: right;" | 2304.90
| style="text-align: right;" | 2307.9
+
| style="text-align: right;" | 2307.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-12-14
 
| 1954-12-14
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2304.9
+
| style="text-align: right;" | 2304.90
| style="text-align: right;" | 2307.9
+
| style="text-align: right;" | 2307.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-16
 
| 1954-12-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2300.9
+
| style="text-align: right;" | 2300.90
| style="text-align: right;" | 2304.6
+
| style="text-align: right;" | 2304.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-12-17
 
| 1954-12-17
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1898.9
+
| style="text-align: right;" | 1898.90
| style="text-align: right;" | 1898.9
+
| style="text-align: right;" | 1898.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-17
 
| 1954-12-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1887.9
+
| style="text-align: right;" | 1887.90
| style="text-align: right;" | 1888.2
+
| style="text-align: right;" | 1888.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1954-11-03
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2421.90
 +
| style="text-align: right;" | 2426.20
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-18
 
| 1954-12-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1883.7
+
| style="text-align: right;" | 1883.70
| style="text-align: right;" | 1887.9
+
| style="text-align: right;" | 1887.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-12-19
 
| 1954-12-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1883.7
+
| style="text-align: right;" | 1883.70
| style="text-align: right;" | 1888.2
+
| style="text-align: right;" | 1888.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-21
 
| 1954-12-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1868.4
+
| style="text-align: right;" | 1868.40
| style="text-align: right;" | 1868.4
+
| style="text-align: right;" | 1868.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-21
 
| 1954-12-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1861.1
+
| style="text-align: right;" | 1861.10
| style="text-align: right;" | 1861.4
+
| style="text-align: right;" | 1861.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-12-23
 
| 1954-12-23
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1861.1
+
| style="text-align: right;" | 1861.10
| style="text-align: right;" | 1861.4
+
| style="text-align: right;" | 1861.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1954-12-28
 
| 1954-12-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1856.8
+
| style="text-align: right;" | 1856.80
| style="text-align: right;" | 1858.1
+
| style="text-align: right;" | 1858.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-12-28
 
| 1954-12-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1859.3
+
| style="text-align: right;" | 1859.30
| style="text-align: right;" | 1861.4
+
| style="text-align: right;" | 1861.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1954-12-31
 
| 1954-12-31
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1856.8
+
| style="text-align: right;" | 1856.80
| style="text-align: right;" | 1861.4
+
| style="text-align: right;" | 1861.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-01-01
 
| 1955-01-01
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1773.6
+
| style="text-align: right;" | 1773.60
| style="text-align: right;" | 1781.6
+
| style="text-align: right;" | 1781.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-01-03
 
| 1955-01-03
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 1766.3
+
| style="text-align: right;" | 1766.30
| style="text-align: right;" | 1766.6
+
| style="text-align: right;" | 1766.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1954-11-06
 +
| Perforation
 +
| style="text-align: right;" | 2351.20
 +
| style="text-align: right;" | 2353.70
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1955-01-03
 
| 1955-01-03
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1766.3
+
| style="text-align: right;" | 1766.30
| style="text-align: right;" | 1766.6
+
| style="text-align: right;" | 1766.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-01-06
 
| 1955-01-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1755
+
| style="text-align: right;" | 1755.00
| style="text-align: right;" | 1756.3
+
| style="text-align: right;" | 1756.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1955-01-06
 
| 1955-01-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1756.9
+
| style="text-align: right;" | 1756.90
| style="text-align: right;" | 1757.5
+
| style="text-align: right;" | 1757.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1955-01-06
 
| 1955-01-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1758.1
+
| style="text-align: right;" | 1758.10
| style="text-align: right;" | 1766.6
+
| style="text-align: right;" | 1766.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1955-01-07
 
| 1955-01-07
| Fracture  
+
| Fracture
| style="text-align: right;" | 1755
+
| style="text-align: right;" | 1755.00
| style="text-align: right;" | 1766.6
+
| style="text-align: right;" | 1766.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-01-18
 
| 1955-01-18
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1755
+
| style="text-align: right;" | 1755.00
| style="text-align: right;" | 1766.6
+
| style="text-align: right;" | 1766.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-01-24
 
| 1955-01-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1856.8
+
| style="text-align: right;" | 1856.80
| style="text-align: right;" | 1861.4
+
| style="text-align: right;" | 1861.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1955-01-24
 
| 1955-01-24
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1856.8
+
| style="text-align: right;" | 1856.80
| style="text-align: right;" | 1861.4
+
| style="text-align: right;" | 1861.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1955-01-30
 
| 1955-01-30
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1856.8
+
| style="text-align: right;" | 1856.80
| style="text-align: right;" | 1861.4
+
| style="text-align: right;" | 1861.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1957-05-28
 
| 1957-05-28
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1856.8
+
| style="text-align: right;" | 1856.80
| style="text-align: right;" | 1861.4
+
| style="text-align: right;" | 1861.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1954-11-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2351.20
 +
| style="text-align: right;" | 2353.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1957-06-28
 
| 1957-06-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1855
+
| style="text-align: right;" | 1855.00
| style="text-align: right;" | 1860.2
+
| style="text-align: right;" | 1860.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1957-07-02
 
| 1957-07-02
| Selective Jet Perforation
+
| Selective Jet Perforations
| style="text-align: right;" | 1860.2
+
| style="text-align: right;" | 1860.20
| style="text-align: right;" | 1862.3
+
| style="text-align: right;" | 1862.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1957-07-04
 
| 1957-07-04
| Fracture  
+
| Fracture
| style="text-align: right;" | 1855
+
| style="text-align: right;" | 1855.00
| style="text-align: right;" | 1862.3
+
| style="text-align: right;" | 1862.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-11-29
 
| 1963-11-29
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 775.1
+
| style="text-align: right;" | 775.10
| style="text-align: right;" | 811.1
+
| style="text-align: right;" | 811.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1954-11-11
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2351.20
 +
| style="text-align: right;" | 2353.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1954-11-13
 +
| Perforation
 +
| style="text-align: right;" | 2339.00
 +
| style="text-align: right;" | 2339.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1954-11-14
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2339.00
 +
| style="text-align: right;" | 2339.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1954-11-15
 +
| Acid Treatment
 +
| style="text-align: right;" | 2339.00
 +
| style="text-align: right;" | 2339.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1954-11-16
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2339.00
 +
| style="text-align: right;" | 2339.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 334: Line 635:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 367: Line 682:
 
| 1961
 
| 1961
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 69.5
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 375: Line 690:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 394: Line 709:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 21:55, 17 January 2021

Well Details

Well ID: 0746082607000
Loading map...
Location: 00/07-26-074-08W6/0
Location Alias: 00/07-26-74-08 W6M
Location Alias 2: 00/07-26-074-08 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 08
Section: 26
County/Municipality: County of Grande Prairie No. 1
Well Name: ARCO LA GLACE 7-26-74-8
Operator Name: Suncor Energy Inc.
License Number: 0007897
License Date: 1954-04-01
License Status: RecCertified
Spud Date: 1954-05-24
Final Drill Date: 1954-10-28
Well Total Depth: 2746.20 m
Surface Hole Latitude: 55.437523
Surface Hole Longitude: -119.111782

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-04-01 Obtained License
1954-05-31 Drill Stem Test Performed
1954-06-03 Drill Stem Test Performed
1954-06-03 Lost Circulation Occurred
1954-06-04 Drill Stem Test Performed
1954-06-06 Drill Stem Test Performed
1954-06-11 Drill Stem Test Performed
1954-06-12 Drill Stem Test Performed
1954-06-13 Drill Stem Test Performed
1954-06-16 Drill Stem Test Performed
1954-06-29 Drill Stem Test Performed
1954-07-03 Drill Stem Test Performed
1954-07-04 Drill Stem Test Performed
1954-07-09 Drill Stem Test Performed
1954-08-16 Drill Stem Test Performed
1954-08-17 Drill Stem Test Performed
1954-08-28 Drill Stem Test Performed
1954-09-02 Drill Stem Test Performed
1954-09-20 Production Casing Operation Performed
1954-10-28 Finished Drilling
1954-10-28 Well Mode changed to Drilled and Cased
1954-11-01 Drill Stem Test Performed
1954-11-01 Perforation Treatment Performed - Jet Perforation
1954-11-03 Perforation Treatment Performed - Cement Squeeze
1954-11-06 Drill Stem Test Performed
1954-11-06 Perforation Treatment Performed - Jet Perforation
1954-11-09 Perforation Treatment Performed - Cement Squeeze
1954-11-10 Drill Stem Test Performed
1954-11-11 Perforation Treatment Performed - Cement Squeeze
1954-11-13 Perforation Treatment Performed - Jet Perforation
1954-11-14 Drill Stem Test Performed
1954-11-14 Perforation Treatment Performed - Cement Squeeze
1954-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-11-16 Perforation Treatment Performed - Cement Squeeze
1954-12-04 Drill Stem Test Performed
1954-12-04 Perforation Treatment Performed - Jet Perforation
1954-12-05 Drill Stem Test Performed
1954-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-06 Perforation Treatment Performed - Jet Perforation
1954-12-07 Drill Stem Test Performed
1954-12-09 Drill Stem Test Performed
1954-12-09 Perforation Treatment Performed - Jet Perforation
1954-12-10 Perforation Treatment Performed - Cement Squeeze
1954-12-13 Drill Stem Test Performed
1954-12-13 Perforation Treatment Performed - Jet Perforation
1954-12-14 Perforation Treatment Performed - Cement Squeeze
1954-12-16 Drill Stem Test Performed
1954-12-16 Perforation Treatment Performed - Jet Perforation
1954-12-17 Drill Stem Test Performed
1954-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-12-17 Perforation Treatment Performed - Jet Perforation
1954-12-18 Drill Stem Test Performed
1954-12-18 Perforation Treatment Performed - Jet Perforation
1954-12-19 Drill Stem Test Performed
1954-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-21 Drill Stem Test Performed
1954-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-12-21 Perforation Treatment Performed - Jet Perforation
1954-12-23 Perforation Treatment Performed - Cement Squeeze
1954-12-28 Perforation Treatment Performed - Jet Perforation
1954-12-29 Drill Stem Test Performed
1954-12-31 Drill Stem Test Performed
1954-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-01-01 Perforation Treatment Performed - Cement Plug
1955-01-03 Drill Stem Test Performed
1955-01-03 Perforation Treatment Performed - Cement Squeeze
1955-01-03 Perforation Treatment Performed - Selective Jet Perforations
1955-01-06 Drill Stem Test Performed
1955-01-06 Perforation Treatment Performed - Jet Perforation
1955-01-07 Perforation Treatment Performed - Fractured
1955-01-09 Drill Stem Test Performed
1955-01-10 Drill Stem Test Performed
1955-01-18 Perforation Treatment Performed - Cement Squeeze
1955-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-01-24 Perforation Treatment Performed - Jet Perforation
1955-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-05-26 Well Began Production
1955-05-26 Well Fluid changed to Crude Oil
1955-05-26 Well Mode changed to Flowing
1957-04-07 Well Fluid changed to Crude Oil
1957-04-07 Well Mode changed to Pumping
1957-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-06-28 Perforation Treatment Performed - Jet Perforation
1957-07-02 Perforation Treatment Performed - Selective Jet Perforations
1957-07-04 Perforation Treatment Performed - Fractured
1958-12-16 Well Fluid changed to Crude Oil
1958-12-16 Well Mode changed to Suspended
1963-11-29 Perforation Treatment Performed - Cement Plug
1963-12-01 Well Abandoned
1963-12-01 Well Fluid changed to Crude Oil
1963-12-01 Well Mode changed to Abandoned
1964-06-05 Drill Stem Test Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-01 Perforation 2421.90 2426.20 13
1954-12-04 Perforation 2344.80 2345.70 0
1954-12-06 Perforation 2343.30 2344.50 13
1954-12-06 Acid Treatment 2343.30 2345.70 0
1954-12-09 Perforation 2311.60 2315.30 13
1954-12-10 Cement Squeeze 2311.60 2345.70 0
1954-12-13 Perforation 2304.90 2307.90 13
1954-12-14 Cement Squeeze 2304.90 2307.90 0
1954-12-16 Perforation 2300.90 2304.60 13
1954-12-17 Packing Device Capped w/Cement 1898.90 1898.90 0
1954-12-17 Perforation 1887.90 1888.20 13
1954-11-03 Cement Squeeze 2421.90 2426.20 0
1954-12-18 Perforation 1883.70 1887.90 13
1954-12-19 Acid Treatment 1883.70 1888.20 0
1954-12-21 Packing Device Capped w/Cement 1868.40 1868.40 0
1954-12-21 Perforation 1861.10 1861.40 13
1954-12-23 Cement Squeeze 1861.10 1861.40 0
1954-12-28 Perforation 1856.80 1858.10 13
1954-12-28 Perforation 1859.30 1861.40 13
1954-12-31 Acid Treatment 1856.80 1861.40 0
1955-01-01 Cement Plug 1773.60 1781.60 0
1955-01-03 Selective Jet Perforations 1766.30 1766.60 0
1954-11-06 Perforation 2351.20 2353.70 13
1955-01-03 Cement Squeeze 1766.30 1766.60 0
1955-01-06 Perforation 1755.00 1756.30 13
1955-01-06 Perforation 1756.90 1757.50 13
1955-01-06 Perforation 1758.10 1766.60 13
1955-01-07 Fracture 1755.00 1766.60 0
1955-01-18 Cement Squeeze 1755.00 1766.60 0
1955-01-24 Perforation 1856.80 1861.40 13
1955-01-24 Acid Treatment 1856.80 1861.40 0
1955-01-30 Acid Treatment 1856.80 1861.40 0
1957-05-28 Acid Treatment 1856.80 1861.40 0
1954-11-09 Cement Squeeze 2351.20 2353.70 0
1957-06-28 Perforation 1855.00 1860.20 13
1957-07-02 Selective Jet Perforations 1860.20 1862.30 13
1957-07-04 Fracture 1855.00 1862.30 0
1963-11-29 Cement Plug 775.10 811.10 0
1954-11-11 Cement Squeeze 2351.20 2353.70 0
1954-11-13 Perforation 2339.00 2339.30 13
1954-11-14 Cement Squeeze 2339.00 2339.30 0
1954-11-15 Acid Treatment 2339.00 2339.30 0
1954-11-16 Cement Squeeze 2339.00 2339.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1954-06-03 Lost Circulation 725.10 725.10

For data sources see[6]

References